If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21052 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-81.22,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Monroe Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: FOUTS | |
License Status: Producing | |
License Date: 2010-05-24 | |
Spud Date: 2010-06-10 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2010-06-17 | |
Well Total Depth: 6009.00 ft | |
Configuration: Vertical | |
Latitude: 40.420000 | |
Longitude: -81.220000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-05-24 | Proposed Formations:CLINTON, Issued Date:5/24/2010, Expired Date:5/24/2011 6:00:00 AM, Drilling unit acres:125.934, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-06-17 | |
Construction Permit Expires | 2011-05-24 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | SOUND ENERGY CO INC | 1537.00 | 1747.00 | 154 |
2011 | SOUND ENERGY CO INC | 3122.00 | 2422.00 | 365 |
2012 | SOUND ENERGY CO INC | 2202.00 | 1639.00 | 366 |
2013 | SOUND ENERGY CO INC | 1985.00 | 1313.00 | 365 |
2014 | SOUND ENERGY CO INC | 1835.00 | 1094.00 | 365 |
2015 | SOUND ENERGY CO INC | 1668.00 | 1025.00 | 365 |
2016 | SOUND ENERGY CO INC | 1459.00 | 979.00 | 365 |
2017 | SOUND ENERGY CO INC | 1561.00 | 905.00 | 365 |
2018 | SOUND ENERGY CO INC | 1706.00 | 826.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | SOUND ENERGY CO INC | Brine | 1968 | 154 |
2011 | SOUND ENERGY CO INC | Brine | 1215 | 365 |
2012 | SOUND ENERGY CO INC | Brine | 595 | 366 |
2013 | SOUND ENERGY CO INC | Brine | 423 | 365 |
2014 | SOUND ENERGY CO INC | Brine | 975 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 897 | 365 |
2016 | SOUND ENERGY CO INC | Brine | 431 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 374 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 317 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1116092785 | 2019-10-2 0:00: | PW | No Violations | 1.00 |
-1155329001 | 2010-6-14 0:00: | DD | No Violations | 2.00 |
-1200908242 | 2010-6-11 0:00: | DD | No Violations | 2.00 |
-329232293 | 2010-6-10 0:00: | DD | No Violations | 2.00 |
-87470964 | 2015-2-12 0:00: | PW | No Violations | 1.00 |
0087470964 | 2015-02-12 | Production Wells | No Violations | |
0329232293 | 2010-06-10 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Capstar Drilling is moving onto location. The toolpusher for this Capstar rig is Jim Dixon. No violations at this time. Jim Dixon advised that they should be ready to set surface sometime Saturday (June 12th). |
0439900349 | 2012-06-25 | Preliminary Restoration | No Violations | My inspection found a Preliminary Restoration is due for this well. The Preliminary Restoration can be passed. The well is producing and no violations are noted at the well head or tank battery. |
0802872919 | 2010-07-27 | Production Wells | No Violations | Inspection revealed that the well has been completed and the tank battery assembled. Inspection of the drilling pits revealed that the liners are intact and the fluid levels are acceptable. The tank battery consists of two 210 BBL oil storage tanks. The operator needs to finish constructing the tank battery SPCC dike. No violations at this time. |
1155329001 | 2010-06-14 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Capstar Drilling is drilling at this time. Inspection of the drilling pits revealed that the fluid levels are acceptable and the liners are intact. No violations at this time. |
1200908242 | 2010-06-11 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Capstar Drilling is at 900. The toolpusher- Jim Dixon advised that they would be ready to set surface sometime tomorrow. Inspection of the drilling pits revealed that the liners are intact and fluid levels are acceptable. No violations at this time. |
1280250882 | 2010-06-07 | Drill / Deepen / Reopen | No Violations | Inspection revealed that the operator is building the lease road and the location at this time. No violations at this time. The dozer operator advised that the rig had a well to finish-up on in Northern Ohio and then it would be moving onto location. No violations at this time. |
1664915574 | 2017-08-10 | Production Wells | No Violations | On the day of my inspection I found well equipped with a walking beam pumping unit powered by an electric motor. Well has 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, and polishing rods. Production equipment includes two 210 barrel steel tanks, vertical seperator, and meter box with a .25 inch diameter sales line orfice, all in an earthen dike. Domestic meter in containment also. Tank is identified and production in RBDMS is current. |
439900349 | 2012-6-25 0:00: | PL | No Violations | |
802872919 | 2010-7-27 0:00: | PW | No Violations | 1.00 |
For data sources see[7]