If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20519 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-81.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Washington Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: LUYSTER PAUL | |
License Status: Producing | |
License Date: 1982-03-08 | |
Spud Date: 1982-04-05 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1982-04-09 | |
Well Total Depth: 6130.00 ft | |
Configuration: Vertical | |
Latitude: 40.230000 | |
Longitude: -81.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-03-08 | Issued Date 3/10/82 Expired Date 9/6/82 Acres 0090700 Tool Type RTA Proposed Formation CLINTON Proposed Depth 06130 Proposed Drill Depth 06130 |
Original Spud | 1982-04-05 | |
Completed | 1982-04-09 | |
Reached Total Depth | 1982-04-09 | |
CO | 1982-06-25 | 168 RED HILL DEVELOPMENT GeoDate 3/8/82 |
Construction Permit Expires | 1982-09-06 | |
Completion Report Received | 1984-01-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5916 | 6019 | 9 |
5916 | 6019 | 9 | |
5916 | 6019 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 72510 Gal | 0 | FRAC: WATER |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-536048100 | 2019-9-3 0:00:0 | PW | No Violations | 1.00 |
1384877532 | 2016-06-15 | Production Wells | No Violations | On the day of my inspection, I witnessed this is a plunger- lift system well, using 2 inch diameter production tubing placed inside 4.5 inch diameter production casing. The plunger is being operated by a motor valve. Production equipment for this well includes a 100 bbl. production tank, a horizontal separator and a 2 inch diameter meter run; all placed inside an earth dike that measures approximately 40*30 feet at an average height of 4 foot. Proper identification was in place on the tank battery at the time of my inspection. RBDM records indicate the well is in producing order. |
For data sources see[9]