34-059-24518

Well Details

Well ID: 34-059-24518
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001494
Farm/Lease Name: OUTLAW C
License Status: Producing
License Date: 2017-08-29
Spud Date: 2017-10-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-11-28
Well Total Depth: 28088.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.340000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-29 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:8/29/2017, Expired Date:8/29/2019 12:00:00 PM, Drilling unit acres:698.287, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-11-28 STATUS PER AS-DRILLED PLAT RCVD.
Correction to Well 2018-02-02 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-10-24 STATUS PER AS-DRILLED PLAT RCVD.
Record Last Modified 2018-11-01 STATUS PER AS-DRILLED PLAT RCVD.
Construction Permit Expires 2019-08-29 STATUS PER AS-DRILLED PLAT RCVD.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-31 19655 19770 0
2018-10-31 27831 27928 0
27831 27928 0
19655 19770 0
19655 19770 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/26/2018 07/08/2018 7613 19,552,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
MB-7532 One AquaSource, Inc Biocide Listed Below Listed Below 0 0 0
MB-7530 One AquaSource, Inc Biocide Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.65894 1,201,820.0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 10.9422 19,957,200.0
HP-2814 One AquaSource, Inc Friction Reducer Listed Below Listed Below 0 0 0
HP-2220 One AquaSource, Inc Scale Inhibitor Listed Below Listed Below 0 0 0
HP-9601 One AquaSource, Inc Additive Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Fatty acids, tall oil Proprietary 30 0.000148698 272
Ammonium Chloride 12125-02-9 1.5 0.00164282 2997
Crystalline silica, quartz 14808-60-7 100 9.21217 16,801,800.0
Dazomet 533-74-4 24 0.00533516 9731
Ethanol 64-17-5 60 0.000302212 552
Citric acid 77-92-9 60 0.00207294 3781
Modified thiourea polymer Proprietary 30 0.000148698 272
Polylactic acid Proprietary 60 0.00003290 60
tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione 533-74-4 24 0.000189309 346
Sodium hydroxide 1310-73-2 4 0.000889193 1622
Ammonium Persulfate 7727-54-0 95 0.00177929 3246
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000151106 276
Naphthalene 91-20-3 5 0.00002518 46
sodium hydroxide 1310-73-2 11.25 0.00008874 162
Oxyalkylated phenolic resin Proprietary 30 0.000201475 368
Organic phosphate copolymer 71050-62-9 25 0.00319783 5833
Ethoxylated alcohols Proprietary 30 0.000148698 272
Polylactide resin Proprietary 60 0.00003290 60
1,2,4 Trimethylbenzene 95-63-6 1 0.00000504 10
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.0197139 35956
Propargyl alcohol 107-19-7 10 0.00004957 91
Hydrochloric acid 7647-01-0 15 0.09853 718824
Olefins Proprietary 5 0.00005948 112
Methanol 67-56-1 60 0.000297396 543
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002518 46
AccessFrac LT material Halliburton Diverter Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 79.037 144,153,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-03-26 H2O 15 324762 Gal 270120 Halliburton STAGE 1/61

STAGES 2-60 SEE IMAGES

2018-07-08 H2O 15 294409 Gal 272360 Halliburton STAGE 61/61

STAGES 2-60 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 278276 95493 123
2019 ECLIPSE RESOURCES I LP 213165 56866 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 11558 123
2019 ECLIPSE RESOURCES I LP Brine 4653 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1490278104 2017-10-27 0:00 CS No Violations 2.00
-1897024603 2018-4-4 0:00:0 CT No Violations 5.00
-2062980829 2019-10-9 0:00: PW No Violations 0.20
-697791686 2017-11-13 0:00 CS No Violations 1.50
-719977419 2017-11-6 0:00: DD No Violations 1.00
0080097290 2019-03-12 Production Wells No Violations I was accompanied by ODNR Southeast Regional Manager Brent Bear and the purpose of our inspection was a status check. During our inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 0 pounds per square inch and the 9.625-inch diameter intermediate casing had 0 pounds per square inch. The production equipment consisted of four sand traps, four gas production units, four horizontal heater treaters, three combustors, one flare, and a compressor. Identification was location at the tank battery and on the wellhead.
0112777900 2019-01-31 Preliminary Restoration No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 0 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of four sand traps, four gas production units, four horizontal heater treaters, three combustors, one flare, and twelve 500-barrel tanks. Produce oil and natural gas from the Jupiter Pad and the Law pad are gathered at this pad (Outlaw). Identification was location at the tank battery and on the wellhead. Two Marathon Petroleum Crude Oil Fleet trucks were loading oil from the tank battery. Location meets the preliminary restoration requirements.
0413215082 2017-10-27 Casing String Witnessed No Violations On the day inspection accompanied by ODNR Inspector Tom Thomas, I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 118 feet, hitting water at 25 feet and ran 118 feet of 24 inch diameter 94.62 pounds per foot conductor pipe. O-Tex Pumping LLC was onsite and pumped 2 barrels of fresh water, performed a 500 pounds per square inch pressure test and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Cello-flake weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 108 feet with 56 barrels of fresh water with good cement returns of 18 barrels to surface. Mix water was tested revealing chlorides of <32 parts per million, pH 7 and 60 degrees.
0697791686 2017-11-13 Casing String Witnessed No Violations On the day of my inspection I witnessed H&P Flex Rig #531 had drilled a 12.25 inch diameter hole to the depth of 7138 feet and Wyoming Casing Crew set 9.625 inch diameter 40 pound per foot HCP-
H&P Flex Rig #531 had drilled a 12.25 inch diameter hole to the depth of 7138 feet and Wyoming Casing Crew set 9.625 inch diameter 40 pound per foot HCP-110 casing at 7083.94 feet 2.9 feet above KB which is 30 feet.
0719977419 2017-11-06 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 had completed their move from the Mercury pad and was raising their derrick. I met with Eclipse Consultant Neil Ingram and reviewed plans for re-spudding the surface section.
0747800009 2018-04-04 Completion Testing No Violations On the day of my inspection accompanying ODNR Inspector Andrew Corder, I witnessed stage 29 of 147 please see his report for details.
0907361628 2017-11-22 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 was drilling ahead on 11.8 pound per gallon mud and 29000 pounds of torque in the lateral with an 8.5 inch diameter bit at 24298 feet with a planned total depth of 28113 feet. The last recorded survey had an azimuth of 329.64 degrees and inclination of 90.93 degrees. I met with Eclipse Consultant Jack Turner and completed a walk around revealing 5.5 inch diameter 23 pound per foot casing was onsite, proper containment was in place and the cement water tanks had been cleaned.
112777900 2019-1-31 0:00: PL No Violations 0.20
1490278104 2017-10-27 Casing String Witnessed No Violations On this day, I accompanied ODNR Inspector Doug Bennett. Please refer to his comments for a detailed report. I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 118 feet and ran 24 inch diameter conductor pipe to bottom. O-Tex Pumping LLC was onsite and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Cello-flake weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was displaced to 108 feet with good cement returns of 18 barrels to surface.
1510192716 2017-11-08 Casing String Witnessed No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 had drilled a 17.5 inch diameter hole to the depth of 1526 feet. Wyoming Casing Crew ran 226.9 feet of 13.375 inch 61 pound per foot J-55 casing and 1251.49 feet of 13.375 inch 54.5#/ft. J--tested revealing chlorides of <32 parts per million, pH 7 and 54 degrees.
1536670080 2018-09-10 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 0 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of four sand traps, four gas production units, four horizontal heater treaters, three combustors, one flare, and twelve 500-barrel tanks. Identification was location at the tank battery and on the wellhead.
1897024603 2018-04-04 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services complete stage 29 of 147 with a breakdown pressure of 9751 pounds per square inch, an average treating pressure of 9185 pounds per square inch, an average rate of 84.7 barrels per minute, and a total of 278320 pounds of proppant pumped. Inspector Doug Bennet was also on site to witness this stimulation stage.
1927368864 2020-7-30 0:00: PW No Violations 1.00
413215082 2017-10-27 0:00 CS No Violations 3.50
654280969 2019-12-19 0:00 PW No Violations 0.10
747800009 2018-4-4 0:00:0 CT No Violations 7.00
80097290 2019-3-12 0:00: PW No Violations 0.30
907361628 2017-11-22 0:00 DD No Violations 2.00

For data sources see[10]

References