34-059-24505

Well Details

Well ID: 34-059-24505
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001462
Farm/Lease Name: RABER E LND GR
License Status: Producing
License Date: 2017-04-21
Spud Date: 2017-05-04
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-08-29
Well Total Depth: 19307.00 ft
Configuration: Horizontal
Latitude: 40.080000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-04-21 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/21/2017, Expired Date:4/21/2019 12:00:00 PM, Drilling unit acres:621.846, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-08-25 CORRECTION TO UNIT SIZE AND TARGET INFORMATION FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2017-08-29 STATUS BASED ON AS-DRILLED PLAT RCVD 10/09/2017-ALE.
Correction to Well 2017-12-29 UPDATE TAKEPOINT/TARGET PER AS-DRILLED PLAT
Completion Report Received 2019-01-18 STATUS BASED ON AS-DRILLED PLAT RCVD 10/09/2017-ALE.
Record Last Modified 2019-01-24 STATUS BASED ON AS-DRILLED PLAT RCVD 10/09/2017-ALE.
Construction Permit Expires 2019-04-21 STATUS BASED ON AS-DRILLED PLAT RCVD 10/09/2017-ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-23 7936 8028 0
2019-01-23 19032 19132 0
19032 19132 0
7936 8028 0
7936 8028 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/28/2017 12/10/2017 7647 20,430,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
WG-36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 89.0617 170,189,000.0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SCALECHEK LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
Sodium sulfate 7757-82-6 0.1 0.00000000 1
Ethanol 64-17-5 1 0.000211891 405
Phosphoric acid 7664-38-2 0.1 0.00002119 41
Methanol 67-56-1 60 0.00693944 13262
Modified thiourea polymer Proprietary 30 0.000282686 541
Propargyl alcohol 107-19-7 10 0.00009423 181
Fatty acids, tall oil Proprietary 30 0.000282686 541
Sodium persulfate 7775-27-1 100 0.00000466 9
Acrylamide acrylate copolymer Proprietary 30 0.0179856 34369
Hydrochloric acid 7647-01-0 7.5 0.08903 170132
Hydrotreated light petroleum distillate 64742-47-8 30 0.0179856 34369
Glutaraldehyde 111-30-8 30 0.00635672 12148
Inorganic salt Proprietary 30 0.0179856 34369
Ethoxylated alcohols Proprietary 30 0.000282686 541
Citric acid 77-92-9 60 0.0043268 8269
Guar gum 9000-30-0 100 0.000316812 606
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00105945 2025
Crystalline silica, quartz 14808-60-7 100 9.64047 18,422,100.0
Olefins Proprietary 5 0.000113075 220
Phosphate of a Diamine, Sodium Salt Proprietary 30 0.0063444 12124
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.25766 2,403,280.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-11-07 H2O 0 9048 Bbl 247478 Halliburton Stage 12 of 75. 40 total perforations from 17506 feet to 17386 feet. The well has been difficult to treat.
2017-11-21 H2O 0 249714 Gal 247744 Halliburton Stage 42 of 75. 40 total perforations from 13006 feet to 12886 feet.

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 926507 166579 273
2019 ASCENT RESOURCES UTICA LLC 260179 30292 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 14016 273
2019 ASCENT RESOURCES UTICA LLC Brine 3879 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1058338673 2018-2-22 0:00: CT No Violations 1.00
-1193565338 2017-11-21 0:00 CT No Violations 3.80
-1505290231 2020-5-26 0:00: PW No Violations 1.00
-1977620137 2017-8-22 0:00: DD No Violations 2.00
0802152018 2018-07-06 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of nine 400 barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, one vertical vent scrubber, and one combustor. The area effected by the pad construction has been restored with vegetation coverage. The lease road and well pad consisted of a gravel surface with no erosion issues. The location has met preliminary restoration requirements written within 1509.072 (A). The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry.
1058338673 2018-02-22 Completion Testing No Violations On the day of my inspection I witnessed Deep Well Service Stand Alone Snubbing Unit # 11 (DWS # 6) was drilling out the last frac plug at 19017 feet with a 4.5 inch diameter tricone bit. Tetra Services was onsite controlling well pressure at 1100 pounds square inch. DWS # 6 will trip out and run 2.875 inch 6.5 pound per foot L-80 tubing and set it at 7880 feet which is at 70 degrees.
1119052303 2018-09-12 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges were present on all casing strings. The 9.625-inch diameter intermediate casing had 1300 pounds per square inch and the 13.375-inch surface casing had 25 pounds per square inch. The production equipment consisted of nine 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, one vertical vent scrubber, and two combustors. The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry.
1167288249 2018-05-17 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The wells on the pad are in the process of flowing back. The production equipment consisted of nine barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, one vertical vent scrubber, and one combustor.
1193565338 2017-11-21 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services complete stage 42 of 75 with a breakdown pressure of 6022 pounds per square inch, an average treating pressure of 8348 pounds per square inch, an average rate of 78.61 barrels per minute and a total of 247744 pounds of proppant pumped. I completed walk around with Ascent Consultant Matt Bollinger revealing proper secondary containment was in place.
1298177547 2017-05-22 Casing String Witnessed No Violations The purpose of my inspection was to witness 1211 feet of 13.375 inch diameter surface casing cemented within a 17.5 inch diameter borehole that was 1225 feet in depth. During my inspection I witnessed Falcon Drilling Rig 26 run the last two joints of casing with Wyoming Casing Crew, and O-Tex rigging up. A pre-job safety meeting was held with all personnel on location. O-Tex pumped 35 barrels gel spacer, and 284 barrels of Class H cement with 1.5% Calcium Chloride weighing 15.6 pound per gallon and a yield of 1.19 cubic foot per sack. Cement was weighed in pressurized mud scales confirming the weight of 15.6 pound per gallon. The plug was launched and displaced with 178.6 barrels fresh water. Gel circulated to surface 73 barrels into displacement and circulation was maintained bringing 70 barrels of cement to surface. A cement sample pulled from the returns was weighed in pressurized mud scales and the results were 15.6 pound per gallon. The plug was bumped and held for 5 minutes and the floats held.
1494062859 2017-05-06 Casing String Witnessed No Violations On the day inspection I witnessed that Precision Rathole had drilled a 36 inch diameter hole to the depth of 100 feet, hitting water at 40 feet and ran 100 feet of 30 inch 118.65 pounds per foot conductor pipe. O-Tex Pumping LLC was onsite and performed a 200 pounds per square inch pressure test, gained circulation with 2 barrels of fresh water and cemented pipe with 330 sacks Class H cement with 1.5% Calcium Chloride, .2% X--flake weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 90 feet with 74.8 barrels of fresh water with good cement returns of 25 barrels to surface. Mix water was tested revealing chlorides of 54 parts per million, pH 7 and 59 degrees.
1502719291 2017-08-14 Drill / Deepen / Reopen No Violations Inspection today was to follow up from a phone call Sunday 8/13/17 from Ascent Consultant Josh Delso where he stated that 10 gallons of diesel was spilled on containment and .5 gallons had breached containment. Upon arrival I met with Mr. Delso and reviewed the incident an Air Drilling Associates hand was having trouble with fuel delivery on the air package and left a pressure relief valve cracked resulting in the spill. We then visited the area of impact revealing that all contamination had removed, rig mats had been pulled up with repairs to the underlying containment being made with the rig mats re-installed and no impact offsite was revealed. Ascent representatives will be monitoring the location and pulling water from the sumps for any residual fuel that has not been recovered.
1510069221 2017-11-07 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services complete stage 12 of 75 with a breakdown pressure of 10035 pounds per square inch, an average treating pressure of 10035 pounds per square inch, an average rate of 64.3 barrels per minute and a total of 247478 pounds of proppant pumped. I completed walk around with Ascent Consultant Malcom Trahan revealing proper secondary containment was in place.
1549547747 2019-02-07 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges were present on all casing strings. The 13.375-inch diameter surface casing had 138 pounds per square inch and the 9.625-inch diameter intermediate had 890 pounds per square inch. The production equipment consisted of nine 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, one vertical vent scrubber, and one combustor. The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry. Ascent well tender was on location along with two Wise tanker trucks that were loading produce fluids from the tank battery.
1977620137 2017-08-22 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson UTI Drilling Rig #584 was drilling ahead in the curve with an 8.5 inch diameter bit on 11.9 pound per gallon mud at 12601 feet with a planned total depth of 19246 feet and experiencing 4500 units of gas with a 1.5 foot flare. I completed walk around with Ascent Consultant Josh Delso and witnessed a light sheen on in the southwest sump. Buckeye Water Service was onsite pumping the sump and will continue until there is no sheen present.
802152018 2018-7-6 0:00:0 PL No Violations 0.20