34-059-24433

Well Details

Well ID: 34-059-24433
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001149
Farm/Lease Name: DONNA W LND GR
License Status: Producing
License Date: 2015-09-18
Spud Date: 2014-12-21
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-10-24
Well Total Depth: 16163.00 ft
Configuration: Horizontal
Latitude: 40.120000
Longitude: -81.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-16 Proposed Formations:TRENTON, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-11-21 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/21/2014, Expired Date:11/20/2016 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2015-06-19 CORRECTION TO CASING PROGRAM PER OPERATOR REQUEST.
Change of Owner 2015-09-01 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
APP 2015-09-18 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/18/2015, Expired Date:9/17/2017 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-10-24
Completion Report Received 2017-03-23
Construction Permit Expires 2017-09-17
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-03-27 8058 14571 0
8058 14571 0
8058 14571 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/04/2016 10/16/2016 7904 11,162,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WGA-7 UWS Viscosifier Distillates (petroleum), hydrotreated light 64742-47-8 55 0.000207355 219.574
Guar Gum 9000-30-0 55 0.000207355 219.574
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000186889 197.902
DETA phosphonate 15827-60-8 5 0.00110015 1164.98
Water 7732-18-5 83 0.0177912 18839.5
Alcohols, ethoxylated 68002-97-1 5 0.00277878 2942.52
Hydroxyacetic acid 79-14-1 5 0.000332247 351.825
Formaldehyde 0000050-00-0 1 0.00000374 3.958
Sulfuric acid 7664-93-9 0.5 0.00000003 0.03
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00110015 1164.98
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.000207355 219.574
Alcohols, ethoxylated 68439-50-9 5 0.00277878 2942.52
Ethanol 64-17-5 0.3 0.00006431 68.095
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000535878 567.456
Ammonium acetate 631-61-8 13 0.00722482 7650.56
Ethylene glycol 107-21-1 20 0.00132899 1407.3
Methanol 0000067-56-1 5 0.00001869 19.79
Thiourea 0000062-56-6 1 0.00000374 3.958
Alcohols, ethoxylated 68551-12-2 5 0.00277878 2942.52
AP Breaker UWS Gel breaker Sulfuric acid 7664-93-9 0.5 0.00000003 0.03
Ammonium peroxydisulfate 7727-54-0 100 0.00000567 6
Unislick ST50 UWS Friction reducer Alcohols, ethoxylated 68551-12-2 5 0.00277878 2942.52
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0166727 17655.1
Ammonium acetate 631-61-8 13 0.00722482 7650.56
Alcohols, ethoxylated 68439-50-9 5 0.00277878 2942.52
Alcohols, ethoxylated 68002-97-1 5 0.00277878 2942.52
HCL Acid (7.5%) UWS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0934509 98957.6
Aqucar 714 UWS Biocide Glutaraldehyde 111-30-8 14 0.00300092 3177.75
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000535878 567.456
Water 7732-18-5 83 0.0177912 18839.5
Ethanol 64-17-5 0.3 0.00006431 68.095
Unihib G UWS Acid inhibitor Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000186889 197.902
Methanol 0000067-56-1 5 0.00001869 19.79
Thiourea 0000062-56-6 1 0.00000374 3.958
Butyl diglycol 0000112-34-5 75 0.000280333 296.853
Formaldehyde 0000050-00-0 1 0.00000374 3.958
Sand UWS Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.6419 11,269,000.0
I-7L UWS Iron control agent Ammonium acetate 35249-89-9 20 0.00132899 1407.3
Ethylene glycol 107-21-1 20 0.00132899 1407.3
Hydroxyacetic acid 79-14-1 5 0.000332247 351.825
Water Ascent Resources Carrier/Base Fluid Water 7732-18-5 100 87.9668 93,150,400.0
Scale Inhibitor E UWS Scale Inhibitor DETA phosphonate 15827-60-8 5 0.00110015 1164.98
Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.0044006 4659.92
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00110015 1164.98
HCL Acid (15%) UWS Acidizing Hydrochloric Acid 7647-01-0 15 0.00422007 4468.75

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-10-16 H2O 8 6008 Bbl 250900 Universal Well Services Inc. STAGE 45/45

30 SHOTS

2016-07-20 H2O 8 5190 Bbl 253073 Universal Well Services Inc. STAGE 1/45

30 SHOTS STAGES 2-44 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC 893893 119352 356
2018 ASCENT RESOURCES UTICA LLC 352027 24197 362
2019 ASCENT RESOURCES UTICA LLC 67351 4777 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC Brine 12812 356
2018 ASCENT RESOURCES UTICA LLC Brine 4192 362
2019 ASCENT RESOURCES UTICA LLC Brine 298 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1186008459 2017-1-10 0:00: CT No Violations 0.50
-1411327752 2017-7-5 0:00:0 PW No Violations 0.50
-311366632 2016-10-11 0:00 CT No Violations 2.00
-626625657 2015-10-22 0:00 DD No Violations 2.00
-845193058 2017-3-23 0:00: PW No Violations 0.50
-869440865 2017-6-6 0:00:0 PW No Violations 0.50
0267517351 2017-02-15 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2650 pounds per square inch on the tubing and 2550 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
0311366632 2016-10-11 Completion Testing No Violations On the day of my inspection I witnessed frac operations were down due to a pressure test failure of the Great Lakes master with 22 of 45 stages completed. Upon removal, replacement and testing of the new valve operations will resume. I completed walk around with Ascent Consultant Joe Rueckert revealing proper secondary containment in place.
0555129568 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Pat Shreve to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1950 pounds per square inch on the tubing and 1950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
0626625657 2015-10-22 Drill / Deepen / Reopen No Violations
0813763687 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2300 pounds per square inch on the tubing and 2500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a gas production unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
0845193058 2017-03-23 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1800 pounds per square inch on the tubing and 2000 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
0869440865 2017-06-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1000 pounds per square inch on the tubing and 1000 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
1186008459 2017-01-10 Completion Testing No Violations On the day of my inspection I witnessed that flowback operations were down due to ice in lines. Upon thawing operations will continue through Falcon EFS equipment. The well was equipped with a production tree with valves in the open position. Gauges present read 2950 pounds per square inch on the tubing and 2950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-400 barrel tanks within containment, 2-vapor recovery towers, 2-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. I met and completed walk around with Ascent Consultant Jason Wiley revealing flowback equipment and flowback tanks were all in containment. Water will be directed to the flowback tanks with gas going to sales and oil sent to the stock tanks.
1372396170 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Austin Gutridge to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2300 pounds per square inch on the tubing and 2500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
1411327752 2017-07-05 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 450 pounds per square inch on the tubing and 750 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. I met with Well Technician Josh Franks and completed a walk around.
1414166187 2015-05-06 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1430806643 2018-05-29 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks, two vapor recovery towers, five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, and one combustor.
1444693534 2015-10-11 Casing String Witnessed No Violations My inspection today was on the cementing of the 1277 feet of 13.375 inch surface casing. O-Tex was on location to complete the cement job. O-Tex rigged up and filled the lines with 5 bbl. and did a 2500 psi pressure test. Following the pressure test 30 bbl. of gel, 5 bbl. of H20, and then 284 bbl. of cement was pumped. 30 bbl. of gel and 45 bbl. of cement returned to surface. A cement sample was taken and it weighed 15.4 ppg.
1444936929 2015-10-15 Drill / Deepen / Reopen No Violations My inspection today was to check in with the rig and see what depth they have reached and when their estimated time was to set and cementing the intermediate string. The rig was tripping out of the hole at the time of my inspection. They are at a depth of 7050 feet. They plan to start setting the 9.625 inch casing tonight and cement it tomorrow.
1445261767 2015-10-19 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Nomac Drilling Rig #137 was drilling ahead on 11.1ppg SOBM with a 8.5 inch bit in their lateral at 11229 feet with a planned td of 16000 feet. Completed walk around with Ascent Resources Consultant Russ White revealing no violations.
1450986778 2019-02-14 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring was present. The 13.375-inch diameter surface casing had 300 pounds per square inch and the 9.625-inch diameter intermediate had 600 pounds per square inch. The production equipment consisted of five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, one combustor, and eight 500-barrel tanks. The identification was present at the wellhead.
1478436556 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1950 pounds per square inch on the tubing and 1950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
1657833329 2020-7-13 0:00: PW No Violations 1.00
1845899507 2017-04-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1600 pounds per square inch on the tubing and 1875 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H.
215005452 2019-11-20 0:00 PW No Violations 0.20
267517351 2017-2-15 0:00: PW No Violations 0.50
555129568 2017-3-14 0:00: PW No Violations 0.50
749600718 2019-11-20 0:00 PW No Violations 0.20
813763687 2017-2-24 0:00: PW No Violations 0.50

For data sources see[10]

References