If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24433 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001149 | |
Farm/Lease Name: DONNA W LND GR | |
License Status: Producing | |
License Date: 2015-09-18 | |
Spud Date: 2014-12-21 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-10-24 | |
Well Total Depth: 16163.00 ft | |
Configuration: Horizontal | |
Latitude: 40.120000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-16 | Proposed Formations:TRENTON, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-11-21 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/21/2014, Expired Date:11/20/2016 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-06-19 | CORRECTION TO CASING PROGRAM PER OPERATOR REQUEST. |
Change of Owner | 2015-09-01 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC |
APP | 2015-09-18 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/18/2015, Expired Date:9/17/2017 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-10-24 | |
Completion Report Received | 2017-03-23 | |
Construction Permit Expires | 2017-09-17 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-27 | 8058 | 14571 | 0 |
8058 | 14571 | 0 | |
8058 | 14571 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/04/2016 | 10/16/2016 | 7904 | 11,162,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WGA-7 | UWS | Viscosifier | Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.000207355 | 219.574 |
Guar Gum | 9000-30-0 | 55 | 0.000207355 | 219.574 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000186889 | 197.902 | |
DETA phosphonate | 15827-60-8 | 5 | 0.00110015 | 1164.98 | ||||
Water | 7732-18-5 | 83 | 0.0177912 | 18839.5 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00277878 | 2942.52 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000332247 | 351.825 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000374 | 3.958 | ||||
Sulfuric acid | 7664-93-9 | 0.5 | 0.00000003 | 0.03 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00110015 | 1164.98 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.000207355 | 219.574 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00277878 | 2942.52 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00006431 | 68.095 | ||||
Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000535878 | 567.456 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00722482 | 7650.56 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.00132899 | 1407.3 | ||||
Methanol | 0000067-56-1 | 5 | 0.00001869 | 19.79 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000374 | 3.958 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00277878 | 2942.52 | ||||
AP Breaker | UWS | Gel breaker | Sulfuric acid | 7664-93-9 | 0.5 | 0.00000003 | 0.03 | |
Ammonium peroxydisulfate | 7727-54-0 | 100 | 0.00000567 | 6 | ||||
Unislick ST50 | UWS | Friction reducer | Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00277878 | 2942.52 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0166727 | 17655.1 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00722482 | 7650.56 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00277878 | 2942.52 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00277878 | 2942.52 | ||||
HCL Acid (7.5%) | UWS | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0934509 | 98957.6 | |
Aqucar 714 | UWS | Biocide | Glutaraldehyde | 111-30-8 | 14 | 0.00300092 | 3177.75 | |
Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000535878 | 567.456 | ||||
Water | 7732-18-5 | 83 | 0.0177912 | 18839.5 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00006431 | 68.095 | ||||
Unihib G | UWS | Acid inhibitor | Alcohols, C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000186889 | 197.902 | |
Methanol | 0000067-56-1 | 5 | 0.00001869 | 19.79 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000374 | 3.958 | ||||
Butyl diglycol | 0000112-34-5 | 75 | 0.000280333 | 296.853 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000374 | 3.958 | ||||
Sand | UWS | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 10.6419 | 11,269,000.0 | |
I-7L | UWS | Iron control agent | Ammonium acetate | 35249-89-9 | 20 | 0.00132899 | 1407.3 | |
Ethylene glycol | 107-21-1 | 20 | 0.00132899 | 1407.3 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000332247 | 351.825 | ||||
Water | Ascent Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.9668 | 93,150,400.0 | |
Scale Inhibitor E | UWS | Scale Inhibitor | DETA phosphonate | 15827-60-8 | 5 | 0.00110015 | 1164.98 | |
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.0044006 | 4659.92 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00110015 | 1164.98 | ||||
HCL Acid (15%) | UWS | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00422007 | 4468.75 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-16 | H2O | 8 | 6008 Bbl | 250900 | Universal Well Services Inc. | STAGE 45/45
30 SHOTS |
2016-07-20 | H2O | 8 | 5190 Bbl | 253073 | Universal Well Services Inc. | STAGE 1/45
30 SHOTS STAGES 2-44 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | 893893 | 119352 | 356 |
2018 | ASCENT RESOURCES UTICA LLC | 352027 | 24197 | 362 |
2019 | ASCENT RESOURCES UTICA LLC | 67351 | 4777 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | Brine | 12812 | 356 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 4192 | 362 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 298 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1186008459 | 2017-1-10 0:00: | CT | No Violations | 0.50 |
-1411327752 | 2017-7-5 0:00:0 | PW | No Violations | 0.50 |
-311366632 | 2016-10-11 0:00 | CT | No Violations | 2.00 |
-626625657 | 2015-10-22 0:00 | DD | No Violations | 2.00 |
-845193058 | 2017-3-23 0:00: | PW | No Violations | 0.50 |
-869440865 | 2017-6-6 0:00:0 | PW | No Violations | 0.50 |
0267517351 | 2017-02-15 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2650 pounds per square inch on the tubing and 2550 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
0311366632 | 2016-10-11 | Completion Testing | No Violations | On the day of my inspection I witnessed frac operations were down due to a pressure test failure of the Great Lakes master with 22 of 45 stages completed. Upon removal, replacement and testing of the new valve operations will resume. I completed walk around with Ascent Consultant Joe Rueckert revealing proper secondary containment in place. |
0555129568 | 2017-03-14 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Pat Shreve to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1950 pounds per square inch on the tubing and 1950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
0626625657 | 2015-10-22 | Drill / Deepen / Reopen | No Violations | |
0813763687 | 2017-02-24 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2300 pounds per square inch on the tubing and 2500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a gas production unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
0845193058 | 2017-03-23 | Production Wells | No Violations | On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1800 pounds per square inch on the tubing and 2000 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
0869440865 | 2017-06-06 | Production Wells | No Violations | On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1000 pounds per square inch on the tubing and 1000 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
1186008459 | 2017-01-10 | Completion Testing | No Violations | On the day of my inspection I witnessed that flowback operations were down due to ice in lines. Upon thawing operations will continue through Falcon EFS equipment. The well was equipped with a production tree with valves in the open position. Gauges present read 2950 pounds per square inch on the tubing and 2950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-400 barrel tanks within containment, 2-vapor recovery towers, 2-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. I met and completed walk around with Ascent Consultant Jason Wiley revealing flowback equipment and flowback tanks were all in containment. Water will be directed to the flowback tanks with gas going to sales and oil sent to the stock tanks. |
1372396170 | 2017-02-24 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Austin Gutridge to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2300 pounds per square inch on the tubing and 2500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
1411327752 | 2017-07-05 | Production Wells | No Violations | On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 450 pounds per square inch on the tubing and 750 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. I met with Well Technician Josh Franks and completed a walk around. |
1414166187 | 2015-05-06 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1430806643 | 2018-05-29 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks, two vapor recovery towers, five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, and one combustor. |
1444693534 | 2015-10-11 | Casing String Witnessed | No Violations | My inspection today was on the cementing of the 1277 feet of 13.375 inch surface casing. O-Tex was on location to complete the cement job. O-Tex rigged up and filled the lines with 5 bbl. and did a 2500 psi pressure test. Following the pressure test 30 bbl. of gel, 5 bbl. of H20, and then 284 bbl. of cement was pumped. 30 bbl. of gel and 45 bbl. of cement returned to surface. A cement sample was taken and it weighed 15.4 ppg. |
1444936929 | 2015-10-15 | Drill / Deepen / Reopen | No Violations | My inspection today was to check in with the rig and see what depth they have reached and when their estimated time was to set and cementing the intermediate string. The rig was tripping out of the hole at the time of my inspection. They are at a depth of 7050 feet. They plan to start setting the 9.625 inch casing tonight and cement it tomorrow. |
1445261767 | 2015-10-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac Drilling Rig #137 was drilling ahead on 11.1ppg SOBM with a 8.5 inch bit in their lateral at 11229 feet with a planned td of 16000 feet. Completed walk around with Ascent Resources Consultant Russ White revealing no violations. |
1450986778 | 2019-02-14 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring was present. The 13.375-inch diameter surface casing had 300 pounds per square inch and the 9.625-inch diameter intermediate had 600 pounds per square inch. The production equipment consisted of five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, one combustor, and eight 500-barrel tanks. The identification was present at the wellhead. |
1478436556 | 2017-03-14 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1950 pounds per square inch on the tubing and 1950 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
1657833329 | 2020-7-13 0:00: | PW | No Violations | 1.00 |
1845899507 | 2017-04-06 | Production Wells | No Violations | On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1600 pounds per square inch on the tubing and 1875 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 8H and Donna 10H. |
215005452 | 2019-11-20 0:00 | PW | No Violations | 0.20 |
267517351 | 2017-2-15 0:00: | PW | No Violations | 0.50 |
555129568 | 2017-3-14 0:00: | PW | No Violations | 0.50 |
749600718 | 2019-11-20 0:00 | PW | No Violations | 0.20 |
813763687 | 2017-2-24 0:00: | PW | No Violations | 0.50 |
For data sources see[10]