X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24428

Well Details

Well ID: 34-059-24428
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001149
Farm/Lease Name: DONNA W LND GR
License Status: Producing
License Date: 2015-09-18
Spud Date: 2014-12-19
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-09-08
Well Total Depth: 17124.00 ft
Configuration: Horizontal
Latitude: 40.120000
Longitude: -81.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-16 Proposed Formations:TRENTON, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-11-21 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/21/2014, Expired Date:11/20/2016 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2015-06-19 CORRECTION TO CASING PROGRAM PER OPERATOR REQUEST.
Change of Owner 2015-09-01 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
Reached Total Depth 2015-09-08
APP 2015-09-18 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/18/2015, Expired Date:9/17/2017 12:00:00 PM, Drilling unit acres:510.398, Proposed Well Type:OG, Proposed Well Class:POOL
Completion Report Received 2017-03-23
Construction Permit Expires 2017-09-17
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-03-24 8416 16909 0
8416 16909 0
8416 16909 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/04/2016 11/07/2016 7910 12,221,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Ascent Resources Carrier/Base Fluid Water 7732-18-5 100 87.9201 101,985,000.0
Unigel 5F UWS Viscosifier Guar Gum 9000-30-0 100 0.0015302 1775
Unislick ST50 UWS Friction reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0185146 21476.5
Alcohols, ethoxylated 68002-97-1 5 0.00308576 3579.41
Alcohols, ethoxylated 68439-50-9 5 0.00308576 3579.41
Ammonium acetate 631-61-8 13 0.00802299 9306.47
Alcohols, ethoxylated 68551-12-2 5 0.00308576 3579.41
HCL Acid (15%) UWS Acidizing Hydrochloric Acid 7647-01-0 15 0.0071861 8335.7
HCL Acid (7.5%) UWS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0973453 112918
Scale Inhibitor E UWS Scale Inhibitor Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00437261 5072.12
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00109315 1268.03
DETA phosphonate 15827-60-8 5 0.00109315 1268.03
Other Chemical(s) Listed Above See Trade Name(s) List Ethanol 64-17-5 0.3 0.00006279 72.836
Ammonium acetate 631-61-8 13 0.00802299 9306.47
Alcohols, ethoxylated 68551-12-2 5 0.00308576 3579.41
Methanol 0000067-56-1 5 0.00002007 23.283
Ethylene glycol 107-21-1 20 0.00140412 1628.74
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000523261 606.97
Thiourea 0000062-56-6 1 0.00000401 4.657
DETA phosphonate 15827-60-8 5 0.00109315 1268.03
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.0040245 4668.33
Formaldehyde 0000050-00-0 1 0.00000401 4.657
Alcohols, ethoxylated 68439-50-9 5 0.00308576 3579.41
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00109315 1268.03
Hydroxyacetic acid 79-14-1 5 0.00035103 407.186
Sulfuric acid 7664-93-9 0.5 0.00000052 0.6
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000200716 232.826
Water 7732-18-5 83 0.0173723 20151.4
Alcohols, ethoxylated 68002-97-1 5 0.00308576 3579.41
Sand UWS Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.6025 12,298,700.0
Unihib G UWS Acid inhibitor Butyl diglycol 0000112-34-5 75 0.000301074 349.238
Methanol 0000067-56-1 5 0.00002007 23.283
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000200716 232.826
Formaldehyde 0000050-00-0 1 0.00000401 4.657
Thiourea 0000062-56-6 1 0.00000401 4.657
AP Breaker UWS Gel breaker Sulfuric acid 7664-93-9 0.5 0.00000052 0.6
Ammonium peroxydisulfate 7727-54-0 100 0.00010345 120
I-7L UWS Iron control agent Hydroxyacetic acid 79-14-1 5 0.00035103 407.186
Ammonium acetate 35249-89-9 20 0.00140412 1628.74
Ethylene glycol 107-21-1 20 0.00140412 1628.74
WGA-7 UWS Viscosifier Distillates (petroleum), hydrotreated light 64742-47-8 55 0.0040245 4668.33
Guar Gum 9000-30-0 55 0.0040245 4668.33
Aqucar 714 UWS Biocide Glutaraldehyde 111-30-8 14 0.00293026 3399.03
Ethanol 64-17-5 0.3 0.00006279 72.836
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000523261 606.97
Water 7732-18-5 83 0.0173723 20151.4

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-07-18 H2O 8 5300 Bbl 259922 Universal Well Services Inc. STAGE 49/49

30 SHOTS

2016-10-04 H2O 8 6209 Bbl 250600 Universal Well Services Inc. STAGE 1/49

30 SHOTS STAGES 2-48 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC 1152302 175076 353
2018 ASCENT RESOURCES UTICA LLC 497180 53885 339
2019 ASCENT RESOURCES UTICA LLC 92687 8644 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC Brine 10435 353
2018 ASCENT RESOURCES UTICA LLC Brine 21069 339
2019 ASCENT RESOURCES UTICA LLC Brine 1653 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1139890715 2017-6-6 0:00:0 PW No Violations 0.50
-125278048 2019-11-20 0:00 PW No Violations 0.20
-1694005458 2019-11-20 0:00 PW No Violations 0.20
-1778561583 2017-2-24 0:00: PW No Violations 0.50
-2016671421 2015-3-27 0:00: DD No Violations 1.00
-2091591198 2017-3-14 0:00: PW No Violations 0.50
-234984504 2017-2-24 0:00: PW No Violations 0.50
-366072559 2017-2-15 0:00: PW No Violations 0.50
-807415750 2017-7-5 0:00:0 PW No Violations 0.50
0014947788 2016-11-10 Completion Testing No Violations On the day of my inspection I witnessed frac operations were completed with Universal Well Services rigging down and moving off location. Deep Well Services will begin moving in week ending 11/19/16 for drill out operations.
0122437807 2017-01-10 Completion Testing No Violations On the day of my inspection I witnessed that flowback operations were down due to ice in lines. Upon thawing operations will continue through Falcon EFS equipment. The well was equipped with a production tree with valves in the open position. Gauges present read 3100 pounds per square inch on the tubing and 3200 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-400 barrel tanks within containment, 2-vapor recovery towers, 2-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H. I met and completed walk around with Ascent Consultant Jason Wiley revealing flowback equipment and flowback tanks were all in containment. Water will be directed to the flowback tanks with gas going to sales and oil sent to the stock tanks.
0234984504 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Austin Gutridge to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2600 pounds per square inch on the tubing and 2600 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H
0366072559 2017-02-15 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2850 pounds per square inch on the tubing and 2800 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H
0514952302 2015-02-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Nomac Drilling Rig #137 was rigged up over the 2H. I met with Consultant Buzz Glover and discussed when the rig would commence drilling. At the time of inspection once Nomac Drilling Rig #82 completes the Gary Green S WSH MN Pad personnel will be transferring to #137 and drilling will begin approximately 3 weeks.
0640708142 2019-02-14 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring was present. The 13.375-inch diameter surface casing had 100 pounds per square inch and the 9.625-inch diameter intermediate had 100 pounds per square inch. The production equipment consisted of five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, one combustor, and eight 500-barrel tanks. The identification was present at the wellhead.
0807415750 2017-07-05 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 480 pounds per square inch on the tubing and 900 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H. I met with Well Technician Josh Franks and completed a walk around.
0923816176 2017-03-23 Preliminary Restoration No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2220 pounds per square inch on the tubing and 2500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H. I met with Ascent Resources Completions Superintendent Jordan Buterbaugh where we reviewed frac stages 10 through 20 for any pressure drops.
1018867438 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2450 pounds per square inch on the tubing and 2450 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H.
1023907981 2020-7-13 0:00: PW No Violations 1.00
1130818649 2017-04-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2050 pounds per square inch on the tubing and 2250 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H.
1139890715 2017-06-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1500 pounds per square inch on the tubing and 1500 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H.
122437807 2017-1-10 0:00: CT No Violations 0.50
1295306613 2015-05-06 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1440086985 2015-08-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Nomac Drilling Rig #137 was completing rigging up with plans to re-spud well later today. Completed walk around with Consultant Buzz Glover revealing proper containment was in place.
1440250007 2015-08-22 Drill / Deepen / Reopen No Violations

-55 Surface Casing and set at 4 feet above KB. O-Tex Pumping LLC was on site and gained circulation with 5bbls of fresh water, 30bbls of gel, 5bbls of fresh water and cemented casing with 1330 sacks of class H cement 15.6ppg, 1.2cuft/sk. with 2%CaCl, 0.2% X-

1440705452 2015-08-27 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Inspector Brian Sefcik, I witnessed that Nomac Drilling Rig #137 drilled a 12.25 inch diameter hole to the depth of 7288 feet and were loading the hole with 10.5ppg SOBM. Nomac Drilling Rig #137 will be tripping out of the hole and running 9.625 inch intermediate casing tonight and cementing casing tomorrow.
14947788 2016-11-10 0:00 CT No Violations 0.50
1527700215 2018-05-29 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks, two vapor recovery towers, five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, and one combustor.
1778561583 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2600 pounds per square inch on the tubing and 2600 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a gas production unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H.
2016671421 2015-03-27 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Nomac Drilling Rig #137 was rigged with no plans to commence drilling until May with the conductor being the only string set to this point.
2091591198 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Pat Shreve to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2450 pounds per square inch on the tubing and 2450 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 4H, Donna 6H, Donna 8H and Donna 10H
514952302 2015-2-20 0:00: DD No Violations 1.00
640708142 2019-2-14 0:00: PW No Violations 0.20
923816176 2017-3-23 0:00: PL No Violations 3.00

For data sources see[10]

References