Well ID: 34-059-21837 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.89,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Spencer Township | |
Operator Name: BIG SKY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: JENKINS-LEPAGE ETAL UNIT | |
License Status: Producing | |
License Date: 1974-10-11 | |
Spud Date: 1974-11-18 | |
Spud Drilling Contractor: | |
Final Drill Date: 1974-11-30 | |
Well Total Depth: 5171.00 ft | |
Configuration: Vertical | |
Latitude: 39.890000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1974-10-11 | 182 BELDEN & BLAKE CO GeoDate 10/11/74 |
Original Spud | 1974-11-18 | |
Completed | 1974-11-30 | |
Reached Total Depth | 1974-11-30 | |
CO | 1993-01-28 | 4381 PELICAN PRODUCING INC GeoDate 10/11/74 |
CO | 1995-11-24 | 1217 HARRISON ENERGY GeoDate 10/11/74 |
CO | 1996-04-10 | 952 G-R CONTRACTING INC GeoDate 10/11/74 |
Change of Owner | 2013-05-20 | Operator changed from 952, G-R CONTRACTING INC to 1333, BIG SKY ENERGY INC |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5026 | 5054 | 2 |
5026 | 5054 | 2 | |
5026 | 5054 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 92000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ENTERPRISE ENERGY CORP | 3800.00 | 457.00 | 0 |
1985 | OXFORD OIL | 2927.00 | 482.00 | 365 |
1986 | OXFORD OIL | 2464.00 | 358.00 | 365 |
1987 | BELDEN & BLAKE CORPORATION | 2282.00 | 351.00 | 365 |
1988 | OXFORD OIL | 1897.00 | 305.00 | 365 |
1990 | BELDEN & BLAKE CORPORATION | 2215.00 | 367.00 | 302 |
1991 | BELDEN & BLAKE CORPORATION | 2128.00 | 293.00 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 1640.00 | 290.00 | 269 |
1993 | BELDEN & BLAKE CORPORATION | 67.00 | 0.00 | 366 |
1994 | PELICAN PRODUCING INC | 1891.00 | 483.00 | 365 |
1995 | PELICAN PRODUCING INC | 1304.00 | 158.00 | 310 |
1996 | G-R CONTRACTING INC | 1356.00 | 348.00 | 365 |
1997 | G-R CONTRACTING INC | 1045.00 | 279.00 | 365 |
1998 | G-R CONTRACTING INC | 1204.00 | 195.00 | 365 |
2000 | G-R CONTRACTING INC | 685.00 | 454.00 | 365 |
2001 | G-R CONTRACTING INC | 865.00 | 197.00 | 365 |
2002 | G-R CONTRACTING INC | 421.00 | 90.00 | 365 |
2003 | G-R CONTRACTING INC | 451.00 | 505.00 | 365 |
2004 | G-R CONTRACTING INC | 292.00 | 491.00 | 365 |
2005 | G-R CONTRACTING INC | 338.00 | 489.00 | 365 |
2006 | G-R CONTRACTING INC | 940.00 | 437.00 | 365 |
2007 | G-R CONTRACTING INC | 374.00 | 458.00 | 365 |
2008 | G-R CONTRACTING INC | 260.00 | 326.00 | 365 |
2009 | G-R CONTRACTING INC | 307.00 | 310.00 | 365 |
2010 | G-R CONTRACTING INC | 317.00 | 343.00 | 365 |
2011 | G-R CONTRACTING INC | 200.00 | 95.00 | 365 |
2012 | G-R CONTRACTING INC | 114.00 | 0.00 | 366 |
2013 | BIG SKY ENERGY INC | 149.00 | 0.00 | 365 |
2014 | BIG SKY ENERGY INC | 8.00 | 0.00 | 365 |
2016 | BIG SKY ENERGY INC | 0.00 | 0.00 | 0 |
2017 | BIG SKY ENERGY INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ENTERPRISE ENERGY CORP | Brine | 170 | 0 |
1985 | OXFORD OIL | Brine | 0 | 365 |
1986 | OXFORD OIL | Brine | 0 | 365 |
1987 | BELDEN & BLAKE CORPORATION | Brine | 157 | 365 |
1988 | OXFORD OIL | Brine | 0 | 365 |
1990 | BELDEN & BLAKE CORPORATION | Brine | 27 | 302 |
1991 | BELDEN & BLAKE CORPORATION | Brine | 2 | 365 |
1992 | BELDEN & BLAKE CORPORATION | Brine | 3 | 269 |
1993 | BELDEN & BLAKE CORPORATION | Brine | 0 | 366 |
1994 | PELICAN PRODUCING INC | Brine | 15 | 365 |
1995 | PELICAN PRODUCING INC | Brine | 10 | 310 |
1996 | G-R CONTRACTING INC | Brine | 0 | 365 |
1997 | G-R CONTRACTING INC | Brine | 0 | 365 |
1998 | G-R CONTRACTING INC | Brine | 0 | 365 |
2000 | G-R CONTRACTING INC | Brine | 0 | 365 |
2001 | G-R CONTRACTING INC | Brine | 0 | 365 |
2002 | G-R CONTRACTING INC | Brine | 0 | 365 |
2003 | G-R CONTRACTING INC | Brine | 0 | 365 |
2004 | G-R CONTRACTING INC | Brine | 0 | 365 |
2005 | G-R CONTRACTING INC | Brine | 0 | 365 |
2006 | G-R CONTRACTING INC | Brine | 0 | 365 |
2007 | G-R CONTRACTING INC | Brine | 0 | 365 |
2008 | G-R CONTRACTING INC | Brine | 0 | 365 |
2009 | G-R CONTRACTING INC | Brine | 0 | 365 |
2010 | G-R CONTRACTING INC | Brine | 0 | 365 |
2011 | G-R CONTRACTING INC | Brine | 0 | 365 |
2012 | G-R CONTRACTING INC | Brine | 0 | 366 |
2013 | G-R CONTRACTING INC | Brine | 0 | 120 |
2014 | G-R CONTRACTING INC | Brine | 0 | 30 |
2016 | BIG SKY ENERGY INC | Brine | 0 | 0 |
2017 | BIG SKY ENERGY INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1021016301 | 2015-11-30 0:00 | PW | No Violations | 1.00 |
-1125015489 | 2009-2-26 0:00: | PW | No Violations | |
-1673034397 | 2016-4-14 0:00: | PW | No Violations | 1.00 |
-1723565080 | 2003-9-18 0:00: | PW | No Violations | |
-1754784650 | 2020-3-31 0:00: | PW | No Violations | 1.00 |
-357517569 | 2008-4-21 0:00: | PB | No Violations | |
-504211616 | 2004-4-27 0:00: | PW | No Violations | |
-555241790 | 2015-9-30 0:00: | PW | No Violations | 1.50 |
-59076923 | 2017-2-27 0:00: | PW | No Violations | 1.00 |
0059076923 | 2017-02-27 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 1/23/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
0348746107 | 2013-10-09 | Production Wells | No Violations | On the day of my inspection I found no changer in the status of the well, I placed a phone call to Big Sky Energy to discuss the status of the well and my call went to voice mail, I left a message to return my call. |
0357517569 | 2008-04-21 | Plug / Plug Back | No Violations | G-R DRILLING MOVE ON WELL TO PLUG. STRONG INDICATIONS OF H2S.RIG UP OVER HOLE. |
0408238574 | 2004-09-14 | Production Wells | No Violations | STATUS CHECK, PUMPING UNIT, WELL IN PRODUCTION. |
0427920597 | 2017-10-12 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 8/4/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
0462892900 | 2018-02-07 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 12/5/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch meter run with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
0480769322 | 2015-02-02 | Production Wells | No Violations | On the day of my inspection following up on NOV-1377007275, I witnessed the well was equipped with 8.625 inch casing and 4.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected. Tubing and rods had been pulled from the well and were on location along with a disconnected pumping unit. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike with identification was present. I placed call to Big Sky well tender Greg Henderson requesting an update on well and he stated that he would get with Bob Barr and get a plan. |
0504211616 | 2004-04-27 | Production Wells | No Violations | STATUS CHECK |
0555241790 | 2015-09-30 | Production Wells | No Violations | On the day of my inspection following up on NOV-1377007275 I witnessed the well was equipped with 8.625 inch casing and 4.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected. Tubing and rods had been pulled from the well and were on location along with a disconnected pumping unit. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7. Identification was present with contamination still present inside the dike. The chart was changed on 8/6/15 showing the well is cycling which is the Jenkins LePage #7 34059216800000 but has the Jenkins LePage 6 and 7 written on the location on the chart. There was no change in the status of the said well since last inspection and field testing of water in the dike revealed <30ppm chlorides and a pH of 6. |
0575758364 | 2017-06-13 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 3/30/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
0624046504 | 2018-10-23 | Production Wells | No Violations
--105, and compliance notice 1377007275. The well was equipped with 8.625-inch diameter casing with a casing head, 3.5-inch diameter production casing, and a 3.5 inch to 2 inche diameter swage nipple. All valves were in the closed position and there were no lines attached to the well. A disconnected pumping unit and a stack of tubing and rods were lying next to the well. The production equipment consisted of one 210-barrel tank, one vertical separator, one drip, and a chart meter. All production equipment was within an earthen dike. A dry paraffin and oil mixture remain within the dike. | |
0638085401 | 2015-04-30 | Production Wells | No Violations | On the day of my inspection following up on NOV-1377007275 accompanied by ODNR Inspector Matt Fulk, I witnessed the well was equipped with 8.625 inch casing and 4.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected. Tubing and rods had been pulled from the well and were on location along with a disconnected pumping unit. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7. Identification was present with contamination present inside the dike. The chart was changed on 4/21/15 showing the well is cycling which is the Jenkins LePage #7 34059216800000. There was no change in the status of the said well since last inspection and updated photographs were taken. |
1021016301 | 2015-11-30 | Production Wells | No Violations | On the day of my inspection following up on NOV-1377007275 I witnessed there was no change in the status of the well and it was equipped with 8.625 inch casing and 4.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected. Tubing and rods had been pulled from the well and were on location along with a disconnected pumping unit. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7. A 210bbl tank which was located inside the dike where contamination was present has been removed with the contamination still present. |
1125015489 | 2009-02-26 | Production Wells | No Violations | WELL IS IN PRODUCTION. |
1153259568 | 2019-03-20 | Production Wells | No Violations
--105, and compliance notice 1377007275. The well was equipped with 8.625-inch diameter casing with a casing head, 3.5-inch diameter production casing, and a 3.5 inch to 2-inch diameter swage nipple. All valves were in the closed position and there were no lines attached to the well. A disconnected pumping unit and a stack of tubing and rods were lying next to the well. The production equipment consisted of one 210-barrel tank, one vertical separator, one drip, and a chart meter. All production equipment was within an earthen dike. A dry paraffin and oil mixture remain within the dike. | |
1182912531 | 2019-11-26 0:00 | PW | No Violations | 0.30 |
1208896310 | 2008-04-22 | Plug / Plug Back | No Violations | CO. TOOLS RUNNING 4898 1.5 BACK TO BOTTOM. TENTIVALLY TO SET 2 PLUGS THRU TUBING 4/23/2008. |
1237665989 | 2016-03-18 | Production Wells | No Violations | On the day of my inspection following up on NOV-1377007275 I witnessed there was no change in the status of the well since the last inspection. The well was equipped with 8.625 inch casing and 4.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7. Contamination was still present inside dike where 210bbl tank was removed. |
1340734792 | 2012-06-25 | Production Wells | No Violations | On the day of my inspection I found four inch well casing with a (4x2) swedge with a ball valve that is half open and a rubber high pressure hose connecting the well to the production line, the land owner told me that G an R pulled the pumping unit off the well and left it on the location, they also pulled the tubing/ rods out of the well two years ago and left it on the location as well, the land owner said that no one has been back to the well for two years. G an R shut his house gas off at that time. I did my inspection of the well and the location and all the material is still on the well site. |
1364512564 | 2013-03-27 | Production Wells | No Violations | Inspected site along with county inspector to determine if well was capable of producing,adjacient landowner claims well is idle and company is back feeding gas line to make well appear to be producing, we had well tender unhook flow line from well and we then put pressure gauge on well head and it had 30# gas pressure on it and well is being used for domestic purposes also, told adjacent landowner that well is producing both domestic gas and is also selling a little gas commercially. |
1377007275 | 2013-08-20 | Production Wells | Violations Noted | On the day of my inspection I meet with the land owner Tom Henry, At the well site I witnessed four and a half inch production casing with a (4x2) swedge and valve standing from the ground, the valve on top of the (4x2) swedge was open, all production lines and sales lines were disconnected from the well, the pumping unit has been pulled away from the well but is still on location, the tubing and rods have been removed from the well and are on location, the previous well owner told me the casing parted down hole approximately three or more years ago. Production has been reported to The Division of Oil and Gas from the year of 1984 to 2012. There are (2) two hundred ten barrel production tanks/ separator/ drip and chart setting inside a containment dike, there is containment soil around the tanks, the I.D. is posted on one of the tanks. The requirements to meet the Division of Oil and Gas Standards will be to make the well capable of commercial production within thirty days or plugging is required within thirty days. Failure to comply may result in Forfeiture of Bond. |
1484690341 | 2017-01-23 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well and it was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
1512480698 | 2017-12-05 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 10/12/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch meter run with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
1560334715 | 2017-03-30 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 2/27/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. I met with land owner Tom Henry who stated that the well has been in its current state for over 5 years and that Big Sky is not allowed on his property. | |
1673034397 | 2016-04-14 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed the well was equipped with 8.625 inch casing and 3.5 inch casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210bbl tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7. Identification was present with contamination remaining inside the dike. | |
1723565080 | 2003-09-18 | Production Wells | No Violations | SMALL OIL STAIN INSIDE DIKE. |
1725162134 | 2013-03-04 | Production Wells | Violations Noted | On the day of my inspection I meet with the land owner Tom Henry, At the well site I witnessed four and a half inch production casing with a (4x2) swedge and valve standing out of the ground, the valve was open. The pumping unit has been pulled away from the well but is still on location, the tubing and rods have been removed from the well and are on location, the land owner told me the casing parted down hole. The Divisions production records for the year of 2011 meet Divisions standards but no current records have been recorded for the year of 2012. There are (2) two hundred ten barrel production tanks/ separator/ drip chart setting inside a containment dike, there is a oil stain in between the two tanks, the I.D.is posted on the tank. The requirements to meet the Division of Oil and Gas standards will be to make the well capable of commercial production within thirty days or plugging is required within sixty days. Failure to comply may result in Forfeiture of Bond. |
1725366450 | 2017-07-18 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 6/13/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
1771842679 | 2017-08-04 | Production Wells | No Violations
--105 and NOV-1377007275, I witnessed there was no change in the status of the well since the last inspection on 7/18/17. The well was equipped with 8.625 inch diameter casing and 3.5 inch diameter casing reduced to 2 inches with valves in the closed position and the flowline disconnected making the well incapable of production. Tubing and rods had been pulled from the well and were on location along with a disconnected OCS pumping unit. Production equipment included a 210 barrel tank, a vertical separator, a drip, a 2 inch sales meter with a .25 inch orifice and a chart recorder all within an earthen dike shared with 34059216800000 Jenkins LePage 7 and the chart was dated 4/12/16. Identification was present with contamination remaining inside the dike. | |
309666799 | 2020-7-23 0:00: | PW | No Violations | 1.00 |
348746107 | 2013-10-9 0:00: | PW | No Violations | |
408238574 | 2004-9-14 0:00: | PW | No Violations | |
427920597 | 2017-10-12 0:00 | PW | No Violations | 1.00 |
462892900 | 2018-2-7 0:00:0 | PW | No Violations | 1.00 |
480769322 | 2015-2-2 0:00:0 | PW | No Violations | 1.50 |
575758364 | 2017-6-13 0:00: | PW | No Violations | 1.00 |
624046504 | 2018-10-23 0:00 | PW | No Violations | 0.40 |
638085401 | 2015-4-30 0:00: | PW | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1377007275 | US-OH-111174 | 2013-08-21 | General Safety | |
1377007275 | US-OH-111175 | 2013-08-21 | No SPCC dike/or failure to keep dike free of water or oil | |
1377007275 | US-OH-111176 | 2013-08-21 | Well shall be plugged | |
1377007275 | US-OH-111177 | 2013-08-21 | Defective casing, leaking well | |
1377007275 | US-OH-111178 | 2013-08-21 | Statement of annual production not filed | |
1725162134 | US-OH-117115 | 2013-04-10 | General Safety | |
1725162134 | US-OH-117116 | 2013-04-10 | Well shall be plugged | |
1725162134 | US-OH-117117 | 2013-04-10 | Defective casing, leaking well | |
1725162134 | US-OH-117118 | 2013-04-10 | Statement of annual production not filed |