If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22103 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.48,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Russell Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: RATAJCZAK UNIT | |
License Status: Producing | |
License Date: 2009-08-24 | |
Spud Date: 2009-09-12 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2009-09-17 | |
Well Total Depth: 3845.00 ft | |
Configuration: Vertical | |
Latitude: 41.480000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-08-24 | Proposed Formations:CLINTON, Issued Date:8/24/2009, Expired Date:8/24/2010 6:00:00 AM, Drilling unit acres:21.13, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-09-17
-28-09 | |
Completion Report Received | 2009-11-02
-28-09 | |
Construction Permit Expires | 2010-08-24
-28-09 | |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29
-28-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-01-11 | 3648 | 3699 | 34 |
3648 | 3699 | 34 | |
3648 | 3699 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 64000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER EXPLORATION INC | 12244.00 | 135.00 | 365 |
2011 | CUTTER EXPLORATION INC | 9744.00 | 179.00 | 0 |
2012 | JAMES R SMAIL INC | 10094.00 | 114.00 | 366 |
2013 | JAMES R SMAIL INC | 5329.00 | 58.00 | 365 |
2014 | JAMES R SMAIL INC | 6638.00 | 57.00 | 365 |
2015 | JAMES R SMAIL INC | 7213.00 | 118.00 | 365 |
2016 | JAMES R SMAIL INC | 8296.00 | 123.00 | 365 |
2017 | JAMES R SMAIL INC | 8166.00 | 56.00 | 365 |
2018 | JAMES R SMAIL INC | 7541.00 | 119.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER EXPLORATION INC | Brine | 146 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 155 | |
2012 | JAMES R SMAIL INC | Brine | 40 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 66 | 365 |
2015 | JAMES R SMAIL INC | Brine | 155 | 365 |
2016 | JAMES R SMAIL INC | Brine | 157 | 365 |
2017 | JAMES R SMAIL INC | Brine | 138 | 365 |
2018 | JAMES R SMAIL INC | Brine | 152 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1208592689 | 2019-8-22 0:00: | UP | No Violations | 2.80 |
-219522331 | 2009-9-24 0:00: | DD | No Violations | |
-746970715 | 2013-7-15 0:00: | UP | No Violations | |
-929149426 | 2011-7-6 0:00:0 | PL | No Violations | |
-947047047 | 2017-5-15 0:00: | UP | No Violations | |
0219522331 | 2009-09-24 | Drill / Deepen / Reopen | No Violations | On site for status of pit solidification. Operator has added 3 loads of cement fines to the pits. Front pit has been backfilled and excavator was working on top of it, to complete solidification of back pit. Back pit was starting to firm up. Operator was finishing mixing 3rd load into it. Lease road was stable. |
0339574608 | 2009-09-15 | Drill / Deepen / Reopen | No Violations | Drill depth 2760 top of the salt, no show of gas during drilling, per driller Eric Poulson. Pits are in good repair. Silt fence is up and in good repair. Lease road is stable, site is dry. Safety fence is up around pits. Topsoil has been saved and stockpiled around site. |
0746970715 | 2013-07-15 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open to a pop off valve. The well and tank battery are in good repair and are surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 35 BBL poly brine tank, and a mechanical separator. The production tank is vented through a 5 gallon charcoal filter and up into a spark arrestor. The proper identification is located on the tank battery and the wellhead. The lease road is in stable condition. |
0929149426 | 2011-07-06 | Preliminary Restoration | No Violations | Lease road is stable and made out of durable material. Fencing around tank battery and wellhead is correct. Spacing in tank battery is correct. Identification signs are posted on the tank battery and the wellhead. Man doors are locked. Landscaping is installed. Affected area from drilling has been reclaimed. Vegetation is established. 100Bbl, 1500 gallon poly and a mechincal separator are in the battery. Lease road is a primary residence driveway, no gate required. Zero psi on the annulus, 25psi pop off on the annulus. |
0947047047 | 2017-05-15 | UrbanProduction Wells | No Violations | During this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The well was fenced and had a locked man door. The production records for this well were up to date. The tank battery consisted of one 100 BBL production tank, one 35 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart dated 5/9/17 showed production. The tank valves were equipped with flat plugs and the vent stack on the production tank was plumbed into a 5 gallon charcoal filte and topped with a spark arrestor. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the well and tank battery. The lease access was stable. No violations observed. |
1135612969 | 2009-12-29 | Administrative Inspection | No Violations | E-mail from Warren Shoenfelt 5 day annulus test on the Ratajczak #1 = 0# |
1294243125 | 2011-01-05 | UrbanPreliminary Restoration | No Violations | Well is a rabbit well. Fence is 8 foot chain link with plastic slates, three strands of barbed wire on top of fence. Man door was locked. Annulus has 25psi pop-off on it and a pressure gauge, 2 psi on gauge. Tank battery 100Bbl production tank, 1500 gal poly tank and mechanical separator. Tank battery fence with 8 foot chain link and three strands of barbed wire. Dike is in good repair. Man door was locked. Lease road is stable and constructed out of rock. Landscape screening has been installed. Identification sign is at the entrance of the location and on the wellhead fence. Silt fence can be removed at this time. Site has been graded, seeded and vegetation is established. Lease road gate has not been installed, drive is primary drive for home. Lock on load line off of the 100Bbl tank. Charcoal filter, spark arrestor and low pressure relief valve have been installed. |
1430168333 | 2019-9-5 0:00:0 | PW | No Violations | 2.50 |
2093450475 | 2009-09-12 | Drill / Deepen / Reopen | No Violations | On site for pit construction. Soil that pits were constructed in was hard clay, clay was dry. Operator was reminded to slope sides when constructing pits. Pits slope was near vertical. Lease road was stable. Drilling permit was in the dog house. Operator spudded well, at 60 operator was still in drift. Fresh water was being delivered onto site and pumped into fresh water tanks. Safety signs for no smoking, hard hat area were up. Permit sign was posted at the entrance to the site. Roy and Eric Poulson on site. |
339574608 | 2009-9-15 0:00: | DD | No Violations |
For data sources see[9]