Well ID: 34-055-22098 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Russell Township | |
Operator Name: CUTTER EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: PERELMAN | |
License Status: Producing | |
License Date: 2009-07-21 | |
Spud Date: 2009-08-26 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2009-08-31 | |
Well Total Depth: 3786.00 ft | |
Configuration: Vertical | |
Latitude: 41.500000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-07-21 | Proposed Formations:CLINTON, Issued Date:7/21/2009, Expired Date:7/21/2010 6:00:00 AM, Drilling unit acres:29.67, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-08-31 | |
Completion Report Received | 2009-10-06 | |
Construction Permit Expires | 2010-07-21 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-30 | 3598 | 3647 | 34 |
3598 | 3647 | 34 | |
3598 | 3647 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 66510 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER EXPLORATION INC | 30132.00 | 560.00 | 365 |
2011 | CUTTER EXPLORATION INC | 40042.00 | 481.00 | 0 |
2012 | CUTTER EXPLORATION INC | 13414.00 | 0.00 | 366 |
2013 | CUTTER EXPLORATION INC | 8865.00 | 251.00 | 365 |
2014 | CUTTER EXPLORATION INC | 12553.00 | 213.00 | 365 |
2015 | CUTTER EXPLORATION INC | 12044.00 | 111.00 | 365 |
2016 | CUTTER EXPLORATION INC | 11094.00 | 85.00 | 365 |
2017 | CUTTER EXPLORATION INC | 114.00 | 5834.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER EXPLORATION INC | Brine | 159 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 80 | |
2012 | CUTTER EXPLORATION INC | Brine | 32 | 366 |
2013 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
2014 | CUTTER EXPLORATION INC | Brine | 30 | 365 |
2015 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
2016 | CUTTER EXPLORATION INC | Brine | 30 | 365 |
2017 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-18787729 | 2010-10-27 0:00 | UP | No Violations | |
-2092488643 | 2013-5-28 0:00: | UP | No Violations | |
0018787729 | 2010-10-27 | UrbanProduction Wells | No Violations | Lease road is stable. Annulus vented through charcoal filter. 2 100Bbl tanks and one poly tank in the battery. Spacing is correct. Need to review files to confirm location of the tank battery is correct. |
1015223438 | 2017-02-10 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The well was fenced and locked. The last reported production for this well was in 2015. The tank battery consisted of two 100 BBL production tanks, one 50 BBL poly brine tank and a mechanical separator. The valves on the separator were open and the chart showed production. The vent stack on the production tank was plumbed into a 55 gallon charcoal filter then plumbed up and topped with a spark arrestor. Tank valves were equipped with flat plugs. The tank battery was diked and fenced with a locked man door. The wellsite did not have any signage associated with it, so I contacted Mark Turpak from Cutter about installing signage. The lease access was stable. |
1309965128 | 2011-07-06 | Preliminary Restoration | No Violations | Well is a rabbit well. Board on Board fence has been installed around the wellhead and tank battery. Man door to the battery was locked. Lock on man door to the well is broken. Identification sign needs posted, sign needs posted on the outside of fence. Annulus has a pop off on it, annulus gas is vented through the charcoal filter in the tank battery. Spacing between the production tanks is 5 inches too close. Spacing between the production tanks and the separator is correct. Tank battery fence only has a single door. Affected area has been reclaimed. Lease road is stable. No gate on lease road, drive is also a primary driveway. There is erosion on the bank at the stream crossing. Bank of the stream crossing needs repair seeding. Operator has recently completed repair work on the stream crossing. Company will be contacted by e-mail regarding need repairs. |
2092488643 | 2013-05-28 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open to a pop off valve that is plumbed into the production tank. The tank battery and well are in good repair and surrounded by a wood fence. The tank battery consists of two 100 BBL production tanks, a 50 BBL poly brine tank, and a mechanical separator. The vent stack on the production tank is plumbed into a 55 gallon charcoal filter. The vent stack is then plumbed up and topped with a spark arrestor. The identification needs placed on the tank battery and the wellhead. I left a message for the well tender to get the signs up. The lease road is in stable condition. |
For data sources see[9]