If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21811 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Bainbridge Township | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: WEBER UNIT | |
License Status: Producing | |
License Date: 2005-04-05 | |
Spud Date: 2005-06-15 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2005-06-26 | |
Well Total Depth: 3946.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-04-05 | Proposed Formations:CLINTON, Issued Date:4/5/2005, Expired Date:4/5/2006 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-06-15 | |
Completed | 2005-06-26 | |
Reached Total Depth | 2005-06-26 | |
Completion Report Received | 2005-12-27 | |
Construction Permit Expires | 2006-04-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-03-06 | 3723 | 3736 | 20 |
3723 | 3736 | 20 | |
3723 | 3736 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 84000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | SUMMIT PETROLEUM INC | 6694.00 | 124.00 | 365 |
2006 | SUMMIT PETROLEUM INC | 25017.00 | 232.00 | 365 |
2007 | SUMMIT PETROLEUM INC | 20935.00 | 147.00 | 365 |
2008 | SUMMIT PETROLEUM INC | 16217.00 | 38.00 | 365 |
2009 | SUMMIT PETROLEUM INC | 11007.00 | 42.00 | 365 |
2010 | SUMMIT PETROLEUM INC | 9767.00 | 0.00 | 365 |
2011 | SUMMIT PETROLEUM INC | 10033.00 | 43.00 | 365 |
2012 | SUMMIT PETROLEUM INC | 8752.00 | 67.00 | 366 |
2013 | SUMMIT PETROLEUM INC | 10810.00 | 65.00 | 365 |
2014 | SUMMIT PETROLEUM INC | 10901.00 | 72.00 | 365 |
2015 | SUMMIT PETROLEUM INC | 8398.00 | 0.00 | 365 |
2016 | SUMMIT PETROLEUM INC | 9221.00 | 24.00 | 365 |
2017 | SUMMIT PETROLEUM INC | 8764.00 | 38.00 | 365 |
2018 | SUMMIT PETROLEUM INC | 7489.00 | 26.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | SUMMIT PETROLEUM INC | Brine | 561 | 365 |
2006 | SUMMIT PETROLEUM INC | Brine | 1609 | 365 |
2007 | SUMMIT PETROLEUM INC | Brine | 1595 | 365 |
2008 | SUMMIT PETROLEUM INC | Brine | 1287 | 365 |
2009 | SUMMIT PETROLEUM INC | Brine | 931 | 365 |
2010 | SUMMIT PETROLEUM INC | Brine | 826 | 365 |
2011 | SUMMIT PETROLEUM INC | Brine | 1080 | 365 |
2012 | SUMMIT PETROLEUM INC | Brine | 1042 | 366 |
2013 | SUMMIT PETROLEUM INC | Brine | 1229 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 1109 | 365 |
2015 | SUMMIT PETROLEUM INC | Brine | 940 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 951 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 891 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 903 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1021448776 | 2016-11-23 0:00 | UP | No Violations | |
-1282939892 | 2005-6-13 0:00: | DD | No Violations | |
-1683817250 | 2008-1-29 0:00: | PL | No Violations | |
-1787724759 | 2018-2-21 0:00: | UP | No Violations | |
-803599937 | 2009-2-23 0:00: | PW | No Violations | |
-897136495 | 2007-12-17 0:00 | PW | No Violations | |
-923968569 | 2008-1-31 0:00: | PW | No Violations | |
-931062528 | 2005-6-20 0:00: | DD | No Violations | |
-956141162 | 2005-6-15 0:00: | DD | No Violations | |
0803599937 | 2009-02-23 | Production Wells | No Violations | Man door unlocked, locked when I left site. Annulus is open and plumbed into poly tank. 61% LEL at the annulus. |
0897136495 | 2007-12-17 | Production Wells | No Violations | Annulus space is open. There is water accumulated around the annulus space. Gas was bubbling thought the water. Minor amount of gas about a bubble a second. I asked Bill from Summit Petroleum to plumb the annulus space into a plastic tank, incase there a release from the well. Per the operator, annulus of the well has had gas since completion. |
0923968569 | 2008-01-31 | Production Wells | No Violations | On site to check annulus pressure at 9:30am. Annulus pressure on the well was 22psi. |
0931062528 | 2005-06-20 | Drill / Deepen / Reopen | No Violations | rig moving pits ok |
0933230018 | 2008-02-12 | Production Wells | No Violations | Checked annulus pressure, 26psi. Called Bill Keeney from Summit requested that annulus be opened up as soon as possible. |
0956141162 | 2005-06-15 | Drill / Deepen / Reopen | No Violations | Rig moving on |
1021448776 | 2016-11-23 | UrbanProduction Wells | No Violations | I was onsite with Emergency Operations Coordinator Fred Romeo in response to a complaint (#5470) regarding gas in a landowner water well. At the time of this inspection, this well was equipped with a plunger lift assembly and the valves on the wellhead were open. The 8 and 5/8 inch annulus was plumbed above grade, equipped with a pop-off valve and open. The pressure gauge on the annulus valve was reading zero. No issues were observed. |
1158675739 | 2012-01-19 | UrbanProduction Wells | No Violations | The bull plug on load line needs replaced. The tank spacing will need to be corrected when tank battery maintenance takes place. The man door was unlocked at the time of inspection and I locked the door afterward. I called the pumper, Scott, and left a message. |
1185295803 | 2007-07-24 | Preliminary Restoration | No Violations | Emergency number on the tank doesnt work. Called message that number has been changed or disconnected. Gas line and wood crate with gas parts on site. Site has been graded and seeded. Stockpile of topsoil in the NW corner of the site. Will need graded out. Tank battery fenced and locked, well head fenced and locked. Spoke to Bill Keller from the company, he will have the area cleaned up and submit a waiver for topsoil stockpile. |
1203446185 | 2008-02-19 | Production Wells | No Violations | Annulus has been opened. Annulus has been plumbed back into a plastic tank. Tank battery is in good repair. Permit sign is up. Sign has been knocked sideways. Lease road is stable and in good repair. |
1282939892 | 2005-06-13 | Drill / Deepen / Reopen | No Violations | rig moving on |
1683817250 | 2008-01-29 | Preliminary Restoration | No Violations | On site to check annulus pressure. Annulus pressure at 10:45am was 16psi. Plumbing was leaking, bubbles were coming up through the water around the annulus. Called Allen (well pumper,) to fix leak. On site at 12:23pm leak has been fixed. Annulus pressure 16psi. |
1733819550 | 2008-01-31 | Production Wells | No Violations | On site to check the annulus pressure of the well. 12:30pm annulus pressure 22psi. Meet Allen (well pumper,) on site. Spoke to Allen about plumbing annulus back into tank either Friday or Monday. |
1787724759 | 2018-02-21 | UrbanProduction Wells | No Violations | During this inspection, the well was equipped with a plunger lift assembly and the annulus and flow line valves were open. The well was fenced. Production records for this well were current. The tank battery consisted of two 100 BBL tanks and two mechanical separators. Valves on the separators were open. The tank battery was diked and fenced with legible signage. The lease access was stable. No violations observed. |
1995998283 | 2008-01-28 | Production Wells | No Violations | On site to check the annulus pressure on the well. Requested that the company install a 25psi pop off valve and a needle gauge. On site at 10:57am, operator has not set up system at this time. 10% LEL at the annulus vent. Called Allen the pumper for the well to install the 25psi pop off valve and needle gauge. 1:31pm operator installed pop off valve and needle gauge, 1/2psi on annulus. |
2091371039 | 2013-05-22 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve was open. The well and tank battery are in good repair and are surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The production tank is vented through a 55 gallon charcoal filter. I left a message for the well tender to update the sign on the tank battery. The lease road is in stable condition. |
933230018 | 2008-2-12 0:00: | PW | No Violations |
For data sources see[9]