X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-035-22141

Well Details

Well ID: 34-035-22141
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name: IACOBACCI UNIT
License Status: Producing
License Date: 2010-01-13
Spud Date: 2010-05-31
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2010-06-11
Well Total Depth: 3252.00 ft
Configuration: Directional
Latitude: 41.550000
Longitude: -81.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-01-13 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:1/13/2010, Expired Date:1/13/2011 6:00:00 AM, Drilling unit acres:22.53, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-06-11
Completion Report Received 2010-11-09
Correction to Well 2010-12-03 UNIT SIZE INCREASED TO 23.13 ACRES. CHANGE IN TARGET INFORMATION (FROM AS DRILLED SURVEY):FOOTAGE= 170'NL & 1145'EL OF LOT 38, TRACT 1; X= 2,297,130; Y= 688, 910.
Construction Permit Expires 2011-01-13
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-20 3098 3132 62
3098 3132 62
3098 3132 62

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 71029 Gal 40000 Superior Well Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 BASS ENERGY CO INC 0.00 0.00 0
2011 BASS ENERGY CO INC 145265.00 138.00 0
2012 BASS ENERGY CO INC 114248.00 68.00 366
2013 BASS ENERGY CO INC 129833.00 63.00 365
2014 BASS ENERGY CO INC 79976.00 0.00 365
2015 BASS ENERGY CO INC 73388.00 70.00 365
2016 BASS ENERGY CO INC 66022.00 0.00 365
2017 BASS ENERGY CO INC 61692.00 0.00 365
2018 BASS ENERGY CO INC 52458.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 BASS ENERGY CO INC Brine 44 0
2011 BASS ENERGY CO INC Brine 211
2012 BASS ENERGY CO INC Brine 128 366
2013 BASS ENERGY CO INC Brine 170 365
2014 BASS ENERGY CO INC Brine 65 365
2015 BASS ENERGY CO INC Brine 108 365
2016 BASS ENERGY CO INC Brine 0 365
2017 BASS ENERGY CO INC Brine 100 365
2018 BASS ENERGY CO INC Brine 80 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-306991814 2012-1-11 0:00: UL No Violations 1.00
-45502655 2010-8-20 0:00: DD No Violations
-615860275 2010-6-1 0:00:0 DD No Violations
-703539997 2010-6-11 0:00: DD No Violations
-906404376 2009-12-23 0:00 AM No Violations
0045502655 2010-08-20 Drill / Deepen / Reopen No Violations Crew on site grading out area disturbed. Getting tank pad set for storage tanks.
0306991814 2012-01-11 UrbanPreliminary Restoration No Violations On 01/11/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed.
0615860275 2010-06-01 Drill / Deepen / Reopen No Violations cemented conducter casing .
0660708165 2010-05-19 Drill / Deepen / Reopen No Violations No violation location being worked on.
0703539997 2010-06-11 Drill / Deepen / Reopen No Violations cementing 4.5casing.
0906404376 2009-12-23 Administrative Inspection No Violations held on site meeting to discuss the site construction and permit conditions.
1085634039 2010-06-02 Drill / Deepen / Reopen No Violations surface cementing 85/8 casing. Good returns to surface.
1276003723 2010-06-01 Drill / Deepen / Reopen No Violations Rig move onto location. Silt fencing installed.Conductor cementing tonight.
1276626858 2010-06-03 Drill / Deepen / Reopen No Violations witnessed BOP test Passed.
1311339500 2011-07-21 Preliminary Restoration No Violations Found area to the west of tank battery disturbed during drilling graded and grass growing.

Preliminary Restoration Passed.

1330929847 2014-08-13 UrbanProduction Wells No Violations I inspected this producing unit as part of routine inspection activity. The well was completed in 06/10/2010. The unit is producing and production reports are current. Elements of the well consist of a production wellhead with standard valve assembly and mechanical plunger-lift system and aboveground storage tank (AST) battery in separate board-on-board enclosures. The wellhead and surrounding area are free of signs of leaks or other impacts. The wellhead and battery are located in a residential portion of Gates Mills, on Riverview Rd. in a flat-lying area behind the residence at . Access to the wellhead and battery are via a short, dedicated gravel access road that enters from Riverview Road. The battery is comprised of 1 steel 100-barrel production tank, 1 50-barrel steel brine tank, and separator unit. Spacing from well to battery, and spacing of elements within the battery meet regulations. The load-out is bull-plugged. The secondary containment at the battery appears well maintained. Process safety equipment is present. I did not observe any signs or evidence of leakage, spills, or problems. The ID placards at the wellhead and battery are in good condition.
1362159471 2013-02-25 UrbanPreliminary Restoration No Violations The producing unit consists of the following elements: A production wellhead and tank battery. The production wellhead consists of a mechanical plunger lift system in a 6 enclosure. There was 300 pounds per square inch (PSI) indicated at the 4 1/2-inch casing at the time of my visit. The tank battery is comprised of 1 100-barrel (BBL) tank, 50 BBL tank, mechanical separator, and associated piping and appurtenances enclosed in an 8 enclosure. The system is equipped with production safety equipment required by 1509:9-9-05. The loadout lines are locked and the secondary containment is good. I did not observe any leaks, releases, or problems.
1714233107 2010-09-30 Urban Drill / Deepen / Reopen No Violations area to wet to work on grass.
660708165 2010-5-19 0:00: DD No Violations

For data sources see[9]

References