X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27158

Well Details

Well ID: 34-031-27158
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Adams Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: SHANE UNIT
License Status: Producing
License Date: 2014-06-02
Spud Date: 2011-10-31
Spud Drilling Contractor: FMS DRILLING
Final Drill Date: 2011-12-10
Well Total Depth: 7088.00 ft
Configuration: Vertical
Latitude: 40.320000
Longitude: -81.650000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-07-14 Proposed Formations:BEREA - COPPER RIDGE, Issued Date:7/14/2011, Expired Date:7/13/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-12-10 PLUGGED BACK TO PRODUCE CLINTON 7/29/2014
Completion Report Received 2013-05-02 PLUGGED BACK TO PRODUCE CLINTON 7/29/2014
APP 2014-06-02 Proposed Formations:CLINTON, Issued Date:6/2/2014, Expired Date:6/1/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Plugged Back 2014-07-29 PLUGGED BACK TO PRODUCE CLINTON 7/29/2014
Construction Permit Expires 2016-06-01 PLUGGED BACK TO PRODUCE CLINTON 7/29/2014
Change of Owner 2018-03-08 Operator changed from 98, to 8685,
Record Last Modified 2018-03-09 PLUGGED BACK TO PRODUCE CLINTON 7/29/2014

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-05-03 6936 6968 67
6936 6968 67
6936 6968 67

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-05-04 ACID 15 1500 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 NGO DEVELOPMENT CORP. 0.00 0.00 0
2012 NGO DEVELOPMENT CORP. 6095.00 0.00 192
2013 NGO DEVELOPMENT CORP. 2352.00 0.00 365
2014 NGO DEVELOPMENT CORP. 3507.00 145.00 365
2015 NGO DEVELOPMENT CORP. 8029.00 307.00 365
2016 NGO DEVELOPMENT CORP. 4930.00 251.00 365
2017 NGO DEVELOPMENT CORP. 4099.00 78.00 365
2018 NGO DEVELOPMENT CORP. 2103.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 NGO DEVELOPMENT CORP. Brine 255
2012 NGO DEVELOPMENT CORP. Brine 934 192
2013 NGO DEVELOPMENT CORP. Brine 645 365
2014 NGO DEVELOPMENT CORP. Brine 1387 365
2015 NGO DEVELOPMENT CORP. Brine 164 365
2016 NGO DEVELOPMENT CORP. Brine 12 365
2017 NGO DEVELOPMENT CORP. Brine 30 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1794018516 2011-10-25 0:00 DD No Violations
-183483007 2012-11-16 0:00 PL No Violations
-1853898657 2011-11-28 0:00 DD No Violations
-67966273 2011-11-2 0:00: DD No Violations
0067966273 2011-11-02 Drill / Deepen / Reopen No Violations Drilling @ 125 on air.
0183483007 2012-11-16 Preliminary Restoration No Violations On the day of my inspection I found that the disturbed areas at the drill site, along the lease road and at the tank battery were graded out with well established vegetative cover. There were no leaks or spills and proper identification was posted. This site passes preliminary restoration. No violations at this time.
0840287921 2012-01-04 Drill / Deepen / Reopen No Violations Landowner requested drilling mud be removed from well site before pits is closed. Request from company to be at site when drilling mud is hauled from drilling pit. Two dump truck being used to haul drilling mud from well site so mud pit can be closed and location graded and restored. Drilling mud removed from well site and pit closed this date.
0947236381 2012-07-12 Preliminary Restoration No Violations I conducted an inspection on the preliminary restoration of this site and found that the site had not been graded or seeded. The well head was equipped with a plunger lift system and connected to a tank battery near the well head that consisted of one 100 bbl brine storage tank, a separator and a partial dike. This tank battery then connected to a second tank battery near the road that consisted of two 100 bbl stock tanks and an earthen dike. There were no leaks or spills at the well head or tank batteries. No identification was posted. This site does not pass restoration at this time.
0975454104 2011-11-21 Drill / Deepen / Reopen No Violations Going in hole with coring tools to start coring Utica shale. Wheatherford and Baker tools.
1036166502 2011-10-28 Drill / Deepen / Reopen No Violations Location started FMS drilling rig to move in 10/30/11.
1281018908 2012-05-29 Production Wells No Violations Well completed well head in place. No storage tanks set, restoration not started, pits are closed.
1320403170 2011-11-04 Drill / Deepen / Reopen No Violations Ran 8 5/8 casing and cemented, good returns
1323447061 2011-12-09 Drill / Deepen / Reopen No Violations Complaint of substantial erosion from well being drilled. FMS drilling is drilling a new well for NGO Development. Run off from ditch along side a stoned lease road is going into a small pond below well site. Meet with landowner this date at well location. Notified Mr. Keeney that restoration would be completed under ORC 1509:072 (A) and gave Mr. Keeney a copy of the law 1509:072 (A) along with a copy of the restoration plan for permit 34031271580000 also gave Mr. Keeney a copy of the law to obtain a permit to drill a well. Then went over the process to complete the drilling and restoration of permit 34031271580000.
1406121074 2014-07-23 Plug / Plug Back No Violations On the day of my inspection I found that NGO was moving equipment in and prepping the site for the service rig. Scott Kees and I went over their plans for setting the plugs and the squeeze job to get cement behind the casing through the Clinton sand.
1406638538 2014-07-28 Plug / Plug Back No Violations On the day of my inspection I found that RB Drilling was running tubing to a depth of 6936 in order to set a bottom plug at the Rose Run perforations.
1407856794 2014-07-31 Plug / Plug Back No Violations On the day of my inspection I found that RB Drilling had ran tubing equipped with a stinger into the cement retainer at 4710. Formation broke circulation and pumped 185 sacks of class A cement to squeeze between the 4.5 casing and the Clinton sand. Then they pulled out of the retainer and reverse circulated any cement above the retainer out of the hole.
1567184794 2019-8-30 0:00: PW No Violations 0.60
1604392934 2014-07-30 Plug / Plug Back No Violations On the day of my inspection Appalachian Well Surveys perforated the 4.5 casing with 4 shots at a depth of 4750. Then they set a cement retainer at a depth of 4710.
1784783747 2011-11-15 Drill / Deepen / Reopen No Violations Reaming all of big Lime, was down to 5630
1794018516 2011-10-25 Drill / Deepen / Reopen No Violations Working on making new location. FMS drilling to move in to drill 10/29/11.
1853898657 2011-11-28 Drill / Deepen / Reopen No Violations Coring done, rig shut down for deer hunting.
1905362051 2014-07-29 Plug / Plug Back No Violations On the day of my inspection I found that RB Drilling had 2.325 tubing ran to 6936. Formation pumped a 400 bottom plug through the Rose Run. RB Drilling pulled the tubing up to 6058 and formation pumped a cement plug through the Utica Shale.
840287921 2012-1-4 0:00:0 DD No Violations
947236381 2012-7-12 0:00: PL No Violations
975454104 2011-11-21 0:00 DD No Violations

For data sources see[9]

References