X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21898

Well Details

Well ID: 34-029-21898
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Elkrun Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-001553
Farm/Lease Name: ELKRUN-JOHNSTON
License Status: Producing
License Date: 2019-02-07
Spud Date: 2019-05-18
Spud Drilling Contractor:
Final Drill Date: 2019-06-02
Well Total Depth: 14158.00 ft
Configuration: Horizontal
Latitude: 40.770000
Longitude: -80.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-05-03 Proposed Formations:POINT PLEASANT, Issued Date:5/3/2018, Expired Date:5/2/2020 12:00:00 PM, Drilling unit acres:153.41, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2018-06-28 Proposed Formations:POINT PLEASANT, Issued Date:6/28/2018, Expired Date:6/27/2020 12:00:00 PM, Drilling unit acres:185.1, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2019-02-07 Proposed Formations:POINT PLEASANT, Issued Date:2/7/2019, Expired Date:2/6/2021 12:00:00 PM, Drilling unit acres:183.87, Proposed Well Type:OG, Proposed Well Class:EOUT
Record Last Modified 2019-02-14
Construction Permit Expires 2021-02-06

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
13799 13965 0
9199 9365 0
9199 9365 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1179980680 2019-11-27 0:00 PL No Violations 2.00
1385016705 2018-09-19 Production Wells No Violations The purpose of my inspection was to conduct a status check inspection on the Elk Run- Johnston location. At the time of my inspection correct identification was posted at the well location entrance. The production gathering line was brought onto the pad. Contractors were beginning to layout the surface production equipment. No work activity was occurring on the pad. Pipeline contractors were working on the right of way off of the South side of the pad. The East side pad drain was reconstructed and lined with rip rap to minimize erosion and sedimentation. No violations were observed during this inspection.
1525975387 2018-05-08 Production Wells No Violations The purpose of my inspection was to document the status of construction activities on the Elkrun-Johnston pad. Susco was the contractor. The operator had updated the East and West side pad drains. The work was completed and the disturbed area seeded and mulched. At the time of my inspection, the contractor was working to improve the drainage area and compact the Southwest corner of the location. While on location I spoke with ODNR-DOGRM engineer Jerry Smith. I discussed the work with Mr. Smith and he communicated to me that the pad retained pre-law designation and that the improvements were not considered substantial to require engineered plans. The operator did not have an identification sign posted at the entrance. I will contact the operator to determine the status of posting identification at the well entrance.
1866615289 2019-02-19 Drill / Deepen / Reopen No Violations I spoke with the Hilcorp consultant on site. 20 conductor pipe was concentrically set on 02/16/2019 to a depth of 118. No issues were reported and no water was encountered. The cellar was set and the operator was in the process of cementing the cellar floor. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection.

For data sources see[4]

References