If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21563 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.85,"lon":-80.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Knox Township | |
Operator Name: G & O RESOURCES LTD | |
Well Pad ID: | |
Farm/Lease Name: GROVE | |
License Status: Producing | |
License Date: 1993-07-02 | |
Spud Date: 1993-08-21 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1993-09-26 | |
Well Total Depth: 5494.00 ft | |
Configuration: Vertical | |
Latitude: 40.850000 | |
Longitude: -80.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1993-07-02 | Issued Date 7/2/93 Expired Date 7/2/94 Acres 0120080 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05494 Proposed Drill Depth 05494 |
Original Spud | 1993-09-20 | |
Completed | 1993-09-26 | |
Reached Total Depth | 1993-09-26 | |
CO | 1993-10-06 | 8 BLAIR BILL INC GeoDate 7/2/93 |
Completion Report Received | 1993-10-25 | |
Construction Permit Expires | 1994-07-02 | |
CO | 1995-01-19 | 4659 BALL RESOURCES INC GeoDate 7/2/93 |
Change of Owner | 2001-09-13 | Operator changed from 4659, BALL RESOURCES INC to 5894, G & O RESOURCES LTD |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5282 | 5382 | 0 |
5282 | 5382 | 0 | |
2006-09-11 | 5334 | 5387 | 42 |
5334 | 5387 | 42 | |
5282 | 5382 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 61050 Gal | 41000 | FRAC W/61,050 GAL H20 & 41M# SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | BLAIR BILL INC | 0.00 | 289.00 | 17 |
1994 | BLAIR BILL INC | 3516.00 | 1509.00 | 365 |
1995 | BALL RESOURCES INC | 1953.00 | 796.00 | 365 |
1996 | BALL RESOURCES INC | 1823.00 | 658.00 | 365 |
1997 | BALL RESOURCES INC | 1665.00 | 466.00 | 365 |
1998 | BALL RESOURCES INC | 1510.00 | 459.00 | 365 |
1999 | BALL RESOURCES INC | 1391.00 | 325.00 | 365 |
2000 | BALL RESOURCES INC | 1298.00 | 392.00 | 365 |
2001 | BALL RESOURCES INC | 280.00 | 160.00 | 182 |
2002 | G & O RESOURCES LTD | 1317.00 | 306.00 | 365 |
2003 | G & O RESOURCES LTD | 795.00 | 320.00 | 365 |
2004 | G & O RESOURCES LTD | 1375.00 | 263.00 | 365 |
2005 | G & O RESOURCES LTD | 1179.00 | 264.00 | 365 |
2006 | G & O RESOURCES LTD | 1013.00 | 276.00 | 365 |
2007 | G & O RESOURCES LTD | 954.00 | 197.00 | 365 |
2008 | G & O RESOURCES LTD | 1012.00 | 268.00 | 366 |
2009 | G & O RESOURCES LTD | 1224.00 | 224.00 | 365 |
2010 | G & O RESOURCES LTD | 1007.00 | 206.00 | 365 |
2011 | G & O RESOURCES LTD | 881.00 | 174.00 | 365 |
2012 | G & O RESOURCES LTD | 1028.00 | 192.00 | 366 |
2013 | G & O RESOURCES LTD | 894.00 | 204.00 | 365 |
2014 | G & O RESOURCES LTD | 790.00 | 97.00 | 365 |
2015 | G & O RESOURCES LTD | 854.00 | 64.00 | 365 |
2016 | G & O RESOURCES LTD | 969.00 | 79.00 | 365 |
2017 | G & O RESOURCES LTD | 776.00 | 35.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | BLAIR BILL INC | Brine | 150 | 17 |
1994 | BLAIR BILL INC | Brine | 364 | 365 |
1995 | BALL RESOURCES INC | Brine | 130 | 365 |
1996 | BALL RESOURCES INC | Brine | 130 | 365 |
1997 | BALL RESOURCES INC | Brine | 81 | 365 |
1998 | BALL RESOURCES INC | Brine | 74 | 365 |
1999 | BALL RESOURCES INC | Brine | 53 | 365 |
2000 | BALL RESOURCES INC | Brine | 52 | 365 |
2001 | BALL RESOURCES INC | Brine | 38 | 182 |
2002 | G & O RESOURCES LTD | Brine | 37 | 365 |
2003 | G & O RESOURCES LTD | Brine | 48 | 365 |
2004 | G & O RESOURCES LTD | Brine | 56 | 365 |
2005 | G & O RESOURCES LTD | Brine | 15 | 365 |
2006 | G & O RESOURCES LTD | Brine | 33 | 365 |
2007 | G & O RESOURCES LTD | Brine | 18 | 365 |
2008 | G & O RESOURCES LTD | Brine | 62 | 366 |
2009 | G & O RESOURCES LTD | Brine | 15 | 365 |
2010 | G & O RESOURCES LTD | Brine | 18 | 365 |
2011 | G & O RESOURCES LTD | Brine | 0 | 365 |
2012 | G & O RESOURCES LTD | Brine | 0 | 366 |
2013 | G & O RESOURCES LTD | Brine | 18 | 365 |
2014 | G & O RESOURCES LTD | Brine | 0 | 365 |
2015 | G & O RESOURCES LTD | Brine | 15 | 365 |
2016 | G & O RESOURCES LTD | Brine | 0 | 365 |
2017 | G & O RESOURCES LTD | Brine | 16 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1775845431 | 2004-12-7 0:00: | PW | No Violations | 0.50 |
0000012938 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 5/25/94 INSPECTOR BRETT FARNSWORTH DATE 05/2519/94 DATA FROM OLD VAX INFO | |
1250906996 | 2017-01-17 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-1563. A review of RBDMS indicates the Owner is current with reporting production. Lease access to the well and tank battery is through a farm driveway. The well location is within an agricultural field that is stable. The 8.625 casing head was below grade. The 4.5 production casing was equipped with an electric pump jack. A pressure gauge monitoring tubing pressure indicated 50 psi. Production valves were in the open position. The tank battery is shared with well #2-1564. A horizontal separator was present but positioned outside of the earthen dike. The separator remained in good repair. No audible or visual leaks were observed. No production meter was present. An earthen dike was present around the steel production tank and poly brine tank. The dike was stable at the time of my inspection. Inside of the dike, the battery consisted of one (1) 210 bbl production tank and one (1) poly brine tank. Correct and legible identification was present on the tank body. The tank remained in good repair. No leaks were detected. The load line valve was closed and plugged. The drain line valve was closed and plumbed out to the poly brine tank. The poly brine tank was not in good repair. The top of the tank was collapsed and areas of the tank body were cracked due to the weight of the drain line. The tank contained a minimal volume of production fluid. The sides of the tank remained free of cracks. I did not observe any evidence of production fluid leaking from the tank. I called and spoke with lease operator Jamie Corsing. Mr. Corsing acknowledged the condition of the tank and stated that he would schedule tank replacement. |
12938 | PL | No Violations | ||
1579222632 | 2014-09-25 | Production Wells | No Violations | I was on site to conduct a status check. Identification was posted on the tank battery. The tank battery consists of one 210 bbl production tank, a 50 bbl poly brine tank, and one horizontal separator. The tank valves are plugged. There is a meter box with a current chart showing production. The dike is present and in good repair. The wellhead is equipped with an electric pumpjack. The access road and site are stable. |
1775845431 | 2004-12-07 | Production Wells | No Violations | The tank battery is shared with permit 1564 and consists of 1-210 bbl storage tank, 1-1,600 gallon plastic salt water tank and a dike. |
For data sources see[9]