X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22574

Well Details

Well ID: 34-019-22574
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Union Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001002
Farm/Lease Name: GARNER 29-13-5
License Status: Producing
License Date: 2014-05-23
Spud Date: 2014-07-15
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-08-29
Well Total Depth: 13199.00 ft
Configuration: Horizontal
Latitude: 40.530000
Longitude: -81.060000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-06 Proposed Formations:TRENTON BLACK RIVER, Issued Date:3/6/2014, Expired Date:3/5/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:166.35, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-08-29
Correction to Well 2015-02-27 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-04-24
Construction Permit Expires 2016-05-22
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-24 8398 13074 800
8398 13074 800
8398 13074 800

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/07/2014 12/14/2014 7840 6,998,080.0 595828

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 4.28878 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.2095 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Sodium Erythorbate 006381-77-7 100 0.00053 0
Ethylene Glycol 000107-21-1 5 0.0006 0
Ammonium Persulfate 007727-54-0 100 0.00025 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00523 0
Hydrogen Chloride 007647-01-0 15 0.00962 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00046 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 0.5321 0
Carbohydrate polymer NA 100 0.08554 0
Hydrochloric Acid 007647-01-0 8 0.08616 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00011 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 14.5409 0
Aliphatic amine polymer NA 30 0.01151 0
Ammonium Sulfate 007783-20-2 30 0.01151 0
Aliphatic acid NA 30 0.00034 0
Water 007732-18-5 93 1.0626 0
Trisodium Ortho Phosphate 007601-54-9 5 0.0006 0
Potassium Hydroxide 001310-58-3 15 0.00818 0
Ammonium Persulfate 007727-54-0 100 0.0025 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00034 0
Water 007732-18-5 85 0.05452 0
Aliphatic polyol NA 30 0.01636 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-12-07 H2O 15 1965 Bbl 328115 Schlumberger STAGE 1/32

25 SHOTS STAGES 2-31 SEE IMAGES

2014-12-14 H2O 15 1953 Bbl 332860 Schlumberger STAGE 32/32

25 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 553709 34570 289
2016 CHESAPEAKE EXPLORATION LLC 348349 16380 366
2017 CHESAPEAKE EXPLORATION LLC 256884 9561 365
2018 CHESAPEAKE EXPLORATION LLC 208898 6591 365
2019 CHESAPEAKE EXPLORATION LLC 46316 1449 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 18494 289
2016 CHESAPEAKE EXPLORATION LLC Brine 4654 366
2017 CHESAPEAKE EXPLORATION LLC Brine 4650 365
2018 CHESAPEAKE EXPLORATION LLC Brine 3343 365
2019 CHESAPEAKE EXPLORATION LLC Brine 586 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-301096880 2015-9-14 0:00: PL No Violations
0301096880 2015-09-14 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1461904552 2014-07-16 Drill / Deepen / Reopen No Violations Precision Rathole Drilled a 26 hole to a depth of 120 and ran 120 of 20 94 # welded conductor casing. O-Tex pumped 2 barrels of fresh water ahead followed by 250 sack of Premium H 2% CaCl2, 0.4% C-41P, 1/4 lb/sk Cello-Flake cement. Displaced with 39 barrels of fresh water. There was 18 barrels of cement returned to surface.

For data sources see[10]

References