If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48,"lon":-81.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000736 | |
Farm/Lease Name: SMITH NURSERY 19-13-5 | |
License Status: Producing | |
License Date: 2013-06-10 | |
Spud Date: 2013-07-03 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-07-14 | |
Well Total Depth: 15806.00 ft | |
Configuration: Horizontal | |
Latitude: 40.480000 | |
Longitude: -81.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-01 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:5/1/2013, Expired Date:5/1/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-06-10 | Proposed Formations:POINT PLEASANT, Issued Date:6/10/2013, Expired Date:6/10/2015 12:00:00 PM, Drilling unit acres:186.33, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-07-14 | |
Correction to Well | 2013-11-29 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 165.98 ACRES. |
Correction to Well | 2014-02-28 | UNIT SIZE CHANGED TO 166.17 ACRES. |
Completion Report Received | 2014-05-28 | |
Construction Permit Expires | 2015-06-10 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-08-20 | 9221 | 15568 | 726 |
9221 | 15568 | 726 | |
9221 | 15568 | 726 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/19/2013 | 12/29/2013 | 8116 | 6,397,860.0 | 455386 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 85.3414 | 0 |
Northern White Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 8.91267 | 0 | |
PTLGL240 | PERFORMANCE TECHNOLOGIES | Gelling Agent | No Hazardous Components | NONE | 0 | 0 | 0 | |
PTLFR200 | PERFORMANCE TECHNOLOGIES | Friction Reducer | Proprietary Oxyalkylated Alcohol | TRADE SECRET | 5 | 0.0013 | 0 | |
Proprietary Aliphatic Hydrocarbon | TRADE SECRET | 30 | 0.00782 | 0 | ||||
PTLIS352 | PERFORMANCE TECHNOLOGIES | Iron Control Agent | Citric Acid | 000077-92-9 | 100 | 0.00061 | 0 | |
100 Mesh Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 3.85957 | 0 | |
PTLMP136 | PERFORMANCE TECHNOLOGIES | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.18138 | 0 | |
Water | 007732-18-5 | 85 | 1.0278 | 0 | ||||
EC6111A | NALCO | Anti-Bacterial Agent | Water | 007732-18-5 | 0 | 0.02646 | 0 | |
Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.00769 | 0 | ||||
PTLBW112 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00999 | 0 | |
PTLAI161, PTLBW112, PTLFR200, PTLGL240, PTLSI372 | PERFORMANCE TECHNOLOGIES | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Scale Inhibitor | Proprietary Aliphatic Alcohol | TRADE SECRET | 0 | 0.0266 | 0 | |
Guar Gum | 009000-30-0 | 0 | 0.1854 | 0 | ||||
Proprietary Fatty Amino Adduct | TRADE SECRET | 0 | 0.00067 | 0 | ||||
Proprietary Clay | TRADE SECRET | 0 | 0.1854 | 0 | ||||
Proprietary Oxyalkylated Alcohol | TRADE SECRET | 0 | 0.00002000 | 0 | ||||
Water | 007732-18-5 | 0 | 0.0452 | 0 | ||||
Proprietary Substituted Fatty Acid Ester | TRADE SECRET | 0 | 0.0266 | 0 | ||||
Copper Sulfate | 007758-98-7 | 0 | 0.0003 | 0 | ||||
Proprietary Oxyalkylated Fatty Acid Derivative | TRADE SECRET | 0 | 0.0266 | 0 | ||||
Tetrasodium Ethylenediaminetetraacetate | 000064-02-8 | 0 | 0.0266 | 0 | ||||
Proprietary Polyether | TRADE SECRET | 0 | 0.00002000 | 0 | ||||
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 0 | 0.1854 | 0 | ||||
Sodium Chloride | 007647-14-5 | 0 | 0.0266 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 0 | 0.00002000 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.1854 | 0 | ||||
Proprietary Vinyl Copolymer | TRADE SECRET | 0 | 0.03118 | 0 | ||||
Proprietary Polycarboxylic Acid Polymer | TRADE SECRET | 0 | 0.01793 | 0 | ||||
PTLBW102 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00221 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.39397 | 0 | |
PTLAI161 | PERFORMANCE TECHNOLOGIES | Corrosion Inhibitor | Proprietary Fatty Alcohol Ethoxylate | TRADE SECRET | 30 | 0.00058 | 0 | |
Proprietary Ethoxylated Alcohol Blend | TRADE SECRET | 10 | 0.00019 | 0 | ||||
Proprietary Alkyl Amine Surfactant | TRADE SECRET | 5 | 0.0001 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 60 | 0.00116 | 0 | ||||
Proprietary Aromatic Aldehyde | TRADE SECRET | 10 | 0.00019 | 0 | ||||
PTLSI372 | PERFORMANCE TECHNOLOGIES | Scale Inhibitor | No Hazardous Components | NONE | 0 | 0 | 0 | |
PTLCA102 | PERFORMANCE TECHNOLOGIES | Cross Linker | Sodium Hydroxide | 001310-73-2 | 60 | 0.02365 | 0 | |
Proprietary Inorganic Salt | TRADE SECRET | 30 | 0.01183 | 0 | ||||
Proprietary Alkyl Alcohol | TRADE SECRET | 60 | 0.02365 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-12-19 | H2O | 15 | 6310 Bbl | 330320 | Performance Technologies | STAGE 4
30 SHOTS |
2013-12-28 | H2O | 15 | 5860 Bbl | 328440 | Performance Technologies | STAGE 20
30 SHOTS |
2013-12-29 | H2O | 15 | 6112 Bbl | 339420 | Performance Technologies | STAGE 22
30 SHOTS |
15 | 0 | 0 | ||||
2013-12-28 | H2O | 15 | 6036 Bbl | 331380 | Performance Technologies | STAGE 18
30 SHOTS |
2013-12-21 | H2O | 15 | 6063 Bbl | 329940 | Performance Technologies | STAGE 12
30 SHOTS |
2013-12-19 | H2O | 15 | 6115 Bbl | 329480 | Performance Technologies | STAGE 3
30 SHOTS |
2013-12-21 | H2O | 15 | 5973 Bbl | 329860 | Performance Technologies | STAGE 13
30 SHOTS |
2013-12-21 | H2O | 15 | 6149 Bbl | 333440 | Performance Technologies | STAGE 9
30 SHOTS |
2013-12-21 | H2O | 15 | 6053 Bbl | 326500 | Performance Technologies | STAGE 10
30 SHOTS |
2013-12-27 | H2O | 15 | 6036 Bbl | 331780 | Performance Technologies | STAGE 15
30 SHOTS |
2013-12-22 | H2O | 15 | 6055 Bbl | 328240 | Performance Technologies | STAGE 14
30 SHOTS |
2013-12-20 | H2O | 15 | 6037 Bbl | 327780 | Performance Technologies | STAGE 8
30 SHOTS |
2013-12-19 | H2O | 15 | 6161 Bbl | 334020 | Performance Technologies | STAGE 1
30 SHOTS |
2013-12-21 | H2O | 15 | 5983 Bbl | 326760 | Performance Technologies | STAGE 11
30 SHOTS |
2013-12-29 | H2O | 15 | 6049 Bbl | 334660 | Performance Technologies | STAGE 23
30 SHOTS |
2013-12-19 | H2O | 15 | 6134 Bbl | 334700 | Performance Technologies | STAGE 2
30 SHOTS |
2013-12-27 | H2O | 15 | 6086 Bbl | 322700 | Performance Technologies | STAGE 16
30 SHOTS |
2013-12-20 | H2O | 15 | 6101 Bbl | 332060 | Performance Technologies | STAGE 7
30 SHOTS |
2013-12-28 | H2O | 15 | 5928 Bbl | 338100 | Performance Technologies | STAGE 21
30 SHOTS |
2013-12-20 | H2O | 15 | 6160 Bbl | 335220 | Performance Technologies | STAGE 5
30 SHOTS |
2013-12-29 | H2O | 15 | 6016 Bbl | 331860 | Performance Technologies | STAGE 24
30 SHOTS |
2013-12-28 | H2O | 15 | 6061 Bbl | 333600 | Performance Technologies | STAGE 17
30 SHOTS |
2013-12-20 | H2O | 15 | 6032 Bbl | 329040 | Performance Technologies | STAGE 6
30 SHOTS |
2013-12-28 | H2O | 15 | 6003 Bbl | 332360 | Performance Technologies | STAGE 19
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 785545 | 32230 | 292 |
2015 | CHESAPEAKE EXPLORATION LLC | 770678 | 16586 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | 514972 | 8142 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 405339 | 4862 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 336618 | 3415 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 74699 | 676 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 14323 | 292 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 11750 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 5162 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3798 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 2558 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 589 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1040033310 | 2017-3-1 0:00:0 | PW | No Violations | 1.00 |
-2121109199 | 2013-7-12 0:00: | DD | No Violations | 3.00 |
-328086295 | 2013-7-3 0:00:0 | CS | No Violations | 5.00 |
-816517274 | 2013-6-20 0:00: | ND | No Violations | 3.00 |
0328086295 | 2013-07-03 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 13 3/8 surface casing set to 575 feet for this well. The rig was down for several days before drilling continued again on this well. The job was pumped as planned and the cement was weighed in at 15.6ppg before it was pumped down hole. There were a total of 29 barrels of cement returned to surface. There are no violations at this time. |
0816517274 | 2013-06-20 | Not Drilled | No Violations | I was inspecting this location to determine how much longer construction has before the location can be completed. Nomac 72 is going to be moving to this location when they completed the final well on the Putnam well pad. Currently an auger rig is on location drilling conductors for the location. I was not able to access the pad due to a very large number of slag trucks waiting to access the pad. Erosion controls have been installed around the location but growth has not been established yet. It appears the location is still several days away from being completed. There are no violations at this time. |
0827560966 | 2013-07-15 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 5.5 production casing drilled by Nomac 72. The casing was run to a depth of 15806. The crews had issues getting the casing rotating tool rigged up and there were 2 leaks during the job. The first leak was in the stack during the pressure test and the second leak was in the iron near the cement head during the pumping of the lead cement weighed in at 13.5ppg. The job was completed and the top of cement is estimated at 535. They will now walk the rig to the 8H well. |
0901099431 | 2013-07-11 | Administrative Inspection | No Violations | I contacted Nomac 72 to check if there was any structural damage down to the wells following a severe storm that came through the area, there was no damage. Currently the rig is broken down due to generator issues. They are currently at 10750 of there 15500 of drilling for this well. |
1040033310 | 2017-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #6H well is in production and is equipped with an open flow assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.
The equipment on the pad consists of the following: 4 producing wells 1 Low pressure vertical separator located inside of dike 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater 1 compressor station No violations were found during my inspection. |
1372174346 | 2013-06-24 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of the well pad completion. Nomac 72 will be coming to this location following the completion of the Putnam wells. Currently the conductor is drilled for this well and is awaiting the rig. Erosion controls have been put into place but the vegetation has not yet started to grow. Slag piles are still on the pad but will be put into place today. |
1372803294 | 2013-07-01 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of Nomac 72 drilling after being moved from the Putnam pad. Currently the rig has been down for 62 hours after drilling 80 feet. The guides for the top drive were bent during the rig down and move to the new location. They attempted to center the top drive but were unable to. They had to rig down the top drive and remove the guide so that it could be sent to the Nomac yard in West Virginia to be worked on. They expect to it return Tuesday night and they will continue drilling ahead at that time. They are going to drill ahead 570 and log the hole before they run the 13 3/8. Currently the crews are cleaning and pressure washing the rig during the down time. Several compressors for drilling were also being brought on location at this time. |
1373921879 | 2013-07-14 | Administrative Inspection | No Violations | I was contacted by rig Nomac 72 informing me that they have reached TD and will start pulling out of the hole. They expect to cement 5.5 production casing tomorrow at noon. |
1706855516 | 2015-10-23 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
2121109199 | 2013-07-12 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of Nomac 72 drilling ahead in the lateral. They were at a depth of 12833 and are currently tripping out of the hole due to the failure of the mud motor. They were currently pumping the slug to trip our after performing a cleanup cycle on the well. I also checked the locations erosion controls following a strong storm. New work has been done on the controls and there are no violations at this time. |
827560966 | 2013-7-15 0:00: | CS | No Violations | 8.00 |
901099431 | 2013-7-11 0:00: | AM | No Violations | 1.00 |
For data sources see[10]