X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22218

Well Details

Well ID: 34-019-22218
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Loudon Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000336
Farm/Lease Name: KOHLER 1-13-5
License Status: Producing
License Date: 2012-08-27
Spud Date: 2012-11-01
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-11-13
Well Total Depth: 13784.00 ft
Configuration: Horizontal
Latitude: 40.470000
Longitude: -80.990000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-27 Proposed Formations:POINT PLEASANT, Issued Date:8/27/2012, Expired Date:8/27/2014 12:00:00 PM, Drilling unit acres:143.68, Proposed Well Type:OG, Proposed Well Class:ENPW
Reached Total Depth 2012-11-13 WCR IN PRELIM FILE
Correction to Well 2013-03-01 CORRECTION TO TARGET INFORMATION (X,Y'S AND FOOTAGE) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2013-05-03 CORRECTION TO TARGET INFORMATON (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 132.95 ACRES.
Completion Report Received 2013-08-22 WCR IN PRELIM FILE
Construction Permit Expires 2014-08-27 WCR IN PRELIM FILE
Record Last Modified 2017-10-24 WCR IN PRELIM FILE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-09-16 8784 13683 560
8784 13683 560
8784 13683 560

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/05/2013 03/07/2013 8178 4,434,110.0 340876

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 3.00742 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 81.9163 0
Acid, Hydrochloric 15pct, A264,

B244, B317, D047, J218, J475, J580, J609, J610, L058, L071, 100 Mesh Sand, Northern White Sand

SCHLUMBERGER Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural Ethane-1,2-diol 107-21-1 0 0.0002 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Polypropylene glycol 25322-69-4 0 0.0002 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00239 0
Prop-2-yn-1-ol 107-19-7 0 0.0001 0
Non-crystalline silica 7631-86-9 0 0.00029 0
Fatty acids, tall-oil 61790-12-3 0 0.00041 0
Methanol 67-56-1 0 0.00056 0
Guar gum 9000-30-0 0.53 0.07671 0
Cholinium chloride 67-48-1 0.47 0.06773 0
Alkenes, C>10 a- 64743-02-8 0 0.00007000 0
Sodium erythorbate 6381-77-7 0.01 0.00083 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00095 0
Sodium sulfate 7757-82-6 0.02 0.00361 0
Ammonium sulfate 7783-20-2 0.06 0.00835 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0.00001000 0
Crystalline silica 14808-60-7 97.31 14.1027 0
Potassium hydroxide 1310-58-3 0.07 0.00945 0
Glycerol 56-81-5 0.07 0.00945 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00002000 0
Trisodium ortho phosphate 7601-54-9 0 0.00071 0
Potassium borate 1332-77-0 0.2 0.02898 0
Water 007732-18-5 3.87 0.58397 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00002000 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00034 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00016 0
Sodium hydroxide 1310-73-2 0 0.00001000 0
Glutaraldehyde 111-30-8 0.04 0.0056 0
Decamethyl cyclopentasiloxane 541-02-6 0 0.00001000 0
Hydrogen chloride 7647-01-0 1.22 0.1767 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0.00001000 0
Urea 57-13-6 0 0.00058 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.06 0.00883 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00043 0
Octamethylcyclotetrasiloxane 556-67-2 0 0.00001000 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-06 H2O 15 7713 Bbl 367800 Schlumberger STAGE 4

35 SHOTS

2013-03-05 H2O 15 5694 Bbl 369280 Schlumberger STAGE 3

35 SHOTS

2013-03-06 H2O 15 6004 Bbl 371800 Schlumberger STAGE 8

35 SHOTS

2013-03-07 H2O 15 5705 Bbl 371640 Schlumberger STAGE 11

35 SHOTS

2013-03-07 H2O 15 5917 Bbl 370460 Schlumberger STAGE 13

35 SHOTS

2013-03-07 H2O 15 6302 Bbl 375180 Schlumberger STAGE 14

35 SHOTS

2013-03-07 H2O 15 6230 Bbl 374760 Schlumberger STAGE 10

35 SHOTS

2013-03-07 H2O 15 5775 Bbl 369560 Schlumberger STAGE 15

35 SHOTS

2013-03-07 H2O 15 5681 Bbl 370540 Schlumberger STAGE 12

35 SHOTS

2013-03-05 H2O 15 13373 Bbl 367880 Schlumberger STAGE 2

35 SHOTS

2013-03-07 H2O 15 5265 Bbl 376141 Schlumberger STAGE 16

35 SHOTS

2013-03-06 H2O 15 7226 Bbl 36800 Schlumberger STAGE 6

35 SHOTS

2013-03-06 H2O 15 6328 Bbl 378820 Schlumberger STAGE 7

35 SHOTS

2013-03-06 H2O 15 6230 Bbl 374760 Schlumberger STAGE 9

35 SHOTS

2013-03-05 0 0 0
2013-03-06 H2O 15 6360 Bbl 371840 Schlumberger STAGE 5

35 SHOTS

2013-03-05 H2O 15 5918 Bbl 374401 Schlumberger STAGE 1

35 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 487757 11766 169
2014 CHESAPEAKE EXPLORATION LLC 885175 4953 351
2015 CHESAPEAKE EXPLORATION LLC 536842 1101 359
2016 CHESAPEAKE EXPLORATION LLC 377634 919 366
2017 CHESAPEAKE EXPLORATION LLC 312667 696 365
2018 CHESAPEAKE EXPLORATION LLC 257113 647 365
2019 CHESAPEAKE EXPLORATION LLC 57256 164 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 9342 169
2014 CHESAPEAKE EXPLORATION LLC Brine 6636 351
2015 CHESAPEAKE EXPLORATION LLC Brine 3363 359
2016 CHESAPEAKE EXPLORATION LLC Brine 2726 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1802 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1275 365
2019 CHESAPEAKE EXPLORATION LLC Brine 666 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1275003046 2018-11-1 0:00: PW No Violations 1.00
-1781874318 2015-10-8 0:00: PL No Violations
1275003046 2018-11-01 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection.
1781874318 2015-10-08 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1836413241 2016-02-18 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was locked and in good repair. The #1H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 6 Storage tanks with one low-pressure vertical separator located outside of the dike 5 Producing wells 5 Sand separators 5 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit

For data sources see[10]

References