If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-21747 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.67,"lon":-81.11,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Brown Township | |
Operator Name: BUCKEYE OIL PRODUCING CO | |
Well Pad ID: | |
Farm/Lease Name: WOHELO ESTATES | |
License Status: Plugged and Abandoned | |
License Date: 2017-06-05 | |
Spud Date: 1985-10-30 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1985-11-05 | |
Well Total Depth: 5700.00 ft | |
Configuration: Vertical | |
Latitude: 40.670000 | |
Longitude: -81.110000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-12-19 | Issued Date 12/19/84 Expired Date 6/17/85 Acres 0040000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1985-06-18 | 182 BELDEN & BLAKE CO GeoDate 6/18/85 |
Oil and Gas | 1985-06-18 | Issued Date 6/18/85 Expired Date 6/18/86 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05700 Proposed Drill Depth 05700 |
Original Spud | 1985-10-30 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
Completed | 1985-11-05 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
Reached Total Depth | 1985-11-05 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
CO | 1986-05-21 | 182 BELDEN & BLAKE CO GeoDate 12/19/84 |
Completion Report Received | 1986-08-04 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
Change of Owner | 1998-08-13 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Change of Owner | 1998-10-08 | Operator changed from 1966, PETROX INC to 56, BUCKEYE OIL PRODUCING CO |
APP | 2003-03-06 | Proposed Formations:CLINTON, Issued Date:3/6/2003, Expired Date:3/5/2004 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
APP | 2012-05-23 | Proposed Formations:CLINTON, Issued Date:5/23/2012, Expired Date:5/23/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2017-06-05 | Proposed Formations:CLINTON, Issued Date:6/5/2017, Expired Date:6/5/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2017-08-17 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
Record Last Modified | 2019-05-10 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
Construction Permit Expires | 2019-06-05 | R.I. 6-22-85, LOG TYPE=LASERLOG, AFTER FRAC T |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-03-06 | 5500 | 5608 | 38 |
5500 | 5608 | 38 | |
5500 | 5608 | 38 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 5000 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | BELDEN & BLAKE CORPORATION | 2389.00 | 171.00 | 365 |
1987 | BELDEN & BLAKE CORPORATION | 678.00 | 323.00 | 365 |
1988 | BELDEN & BLAKE CORPORATION | 3971.00 | 158.00 | 366 |
1990 | BELDEN & BLAKE CORPORATION | 1242.00 | 148.00 | 356 |
1991 | BKK PROSPECTING LTD | 1130.00 | 80.00 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 747.00 | 146.00 | 366 |
1993 | BELDEN & BLAKE CORPORATION | 1029.00 | 149.00 | 336 |
1994 | BELDEN & BLAKE CORPORATION | 678.00 | 0.00 | 363 |
1995 | BELDEN & BLAKE CORPORATION | 665.00 | 138.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 377.00 | 149.00 | 324 |
1997 | BELDEN & BLAKE CORPORATION | 653.00 | 97.00 | 365 |
1998 | BUCKEYE OIL PRODUCING CO | 429.00 | 0.00 | 143 |
1999 | BUCKEYE OIL PRODUCING CO | 1255.00 | 102.00 | 0 |
2000 | BUCKEYE OIL PRODUCING CO | 672.00 | 0.00 | 0 |
2001 | BUCKEYE OIL PRODUCING CO | 174.00 | 111.00 | 365 |
2002 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2003 | BUCKEYE OIL PRODUCING CO | 150.00 | 118.00 | 365 |
2004 | BUCKEYE OIL PRODUCING CO | 1205.00 | 176.00 | 365 |
2005 | BUCKEYE OIL PRODUCING CO | 1012.00 | 86.00 | 365 |
2006 | BUCKEYE OIL PRODUCING CO | 639.00 | 78.00 | 365 |
2007 | BUCKEYE OIL PRODUCING CO | 744.00 | 113.00 | 365 |
2008 | BUCKEYE OIL PRODUCING CO | 780.00 | 84.00 | 365 |
2009 | BUCKEYE OIL PRODUCING CO | 105.00 | 0.00 | 365 |
2010 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2011 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2012 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 366 |
2013 | BUCKEYE OIL PRODUCING CO | 87.00 | 0.00 | 365 |
2014 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2015 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2016 | BUCKEYE OIL PRODUCING CO | 0.00 | 0.00 | 365 |
2017 | BUCKEYE OIL PRODUCING CO | 0.00 | 111.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1020473155 | 2017-10-17 0:00 | FR | No Violations | |
-156923614 | 2017-8-16 0:00: | PB | No Violations | 6.00 |
0156923614 | 2017-08-16 | Plug / Plug Back | No Violations | I was on site to witness plugging operations of this Clinton Sandstone well. Petroset was the cementing contractor. Plug #1 was set from 5701-- |
0273065790 | 2017-09-05 | Final Restoration | No Violations | I was on location to check the final restoration status after the well was plugged on 08/22/2017. The area has been graded and seeded, but vegetation was not yet established. I will return to conduct a final restoration inspection later on in the month. I am awaiting the landowner waiver for the flowline which was filled with cement and left in place. |
0437785793 | 2017-08-09 | Production Wells | No Violations | I was informed by Buckeye Oil on 08/08/2017 that they plan to commence plugging operations during the week of 08/14/2017, and a current plugging permit is issued. The pumping unit has been removed from the well head. Buckeye Oil personnel were on site with trucks and cleaning out the 210 bbl production tanks in preparation for removing, and preparing to flush the flowline. I spoke to personnel regarding a landowner waiver and leaving the flowline in place, which runs under an asphalt driveway. I drove the course of the lease road, which was stable. |
0757888609 | 2017-08-17 | Plug / Plug Back | No Violations | I was on location to witness the plugging operation on the above well. Berry Well Service and Petroset Cementing were the contractors. The 4.5 casing was ripped at 3072 one joint of 4.5 casing was pulled and Plug #3 (2990 to 2840)-Petroset started pumping to establish circulation, they pumped 80/95 barrels before establishing circulation there was 90 estimated barrels of oil before the well bore cleaned up to water. Petroset pumped 35 sacks of class A cement with 2% gel and displaced with 45 barrels of fresh water. Plug #4 (1205 to 1005)- Berrys Well Service pull 4.5casing and Petro set Cementing established circulation with 3 barrels of water followed by 50 sacks of class A cement with 2% gel. And displaced with 16 barrels of fresh water. Plug #5- (200-0) Berry Well Service pulled 4.5 and Petroset Cementing established circulation with 1 barrel of water and pumped 50 sacks of class A cement with 2% gel. The sales line was pumped cement per the landowners request. |
0852338427 | 2017-08-21 | Plug / Plug Back | No Violations | I was on site to check the well after plugging operations finished on 08/17/2017. I measured the top of cement, which was 22 inches below grade. Berry Well Services were moving equipment off site, and informed me they will cut the casing three feet below grade. |
1020473155 | 2017-10-17 | Final Restoration | No Violations | DOGRM District Supervisor Stephen Ochs and I met with the landowner, Mr. Oberholtzer, on site to conduct the final restoration inspection. All production equipment had been removed. Vegetation was established at the tank battery and at the location of the well head, which contained no surface expression of the well. The landowner agreed to allow the lease road and also the flowline to remain, which was flushed and then filled with cement per his request. The landowner stated he was satisfied with the restoration but misplaced the landowner waiver and will submit to the operator as soon as possible. I will return to site to pass final restoration once the landowner waiver is received by the Division. |
1502487116 | 2005-08-01 | Production Wells | No Violations | Routine inspection revealed no violations at this time . GPS readings for the wellhead are N4040. 262 and W08106. 810. GPS readings for the tank battery are N4040. 112 and W08106. 863 . The tank battery consists of two 210 BBL oil storage tanks and one buried cement brine storage tank . |
273065790 | 2017-9-5 0:00:0 | FR | No Violations | 1.00 |
437785793 | 2017-8-9 0:00:0 | PW | No Violations | 2.00 |
757888609 | 2017-8-17 0:00: | PB | No Violations | 10.00 |
852338427 | 2017-8-21 0:00: | PB | No Violations | 1.50 |
For data sources see[9]