34-013-21389

Well Details

Well ID: 34-013-21389
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001598
Farm/Lease Name: WATKINS 210085
License Status: Producing
License Date: 2019-01-02
Spud Date: 2019-01-05
Spud Drilling Contractor:
Final Drill Date: 2019-02-24
Well Total Depth: 16955.00 ft
Configuration: Horizontal
Latitude: 39.930000
Longitude: -80.970000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-01-02 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/2/2019, Expired Date:1/1/2021 12:00:00 PM, Drilling unit acres:661.915, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-01-10
Construction Permit Expires 2021-01-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
16775 16869 0
10165 10326 0
10165 10326 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0513282107 2019-01-06 Drill / Deepen / Reopen No Violations Status check inspection found a top hole rig owned by ButchsRat Hole is on location and spudded the said well on 01/05/2019. The 36well bore has been drilled to 74 and the rig is sitting idle broke down . All depths are from ground level elevation.
1471698252 2019-8-23 0:00: PL No Violations 0.50
1546859900 2019-01-07 Casing String Witnessed No Violations On site inspection at 5:50 am to witness the conductor casing cement job with Lightning Energys top hole rig and cement service. The rig has drilled a 36 diameter well bore to a measured depth of 110 and set 26 conductor to 110 with all measurements from ground level elevation. The spud date was 01/05/2019. The casing was cemented with a 110 barrel cement mix consisting of 520 sacks of class A cement with 3% calcium and 1/4 pound per sack additives. The cement was displaced with 65 barrels of fresh water with 24 barrels of cement returns to surface.
1548776151 2019-01-29 Drill / Deepen / Reopen No Violations
1549295052 2019-02-04 Casing String Witnessed No Violations

-110. The well was cemented with a 492 barrel class A lead cement followed by a 386 barrel class H tail cement with both cement mixes displaced with 683 barrels of kcl water. The final displacement pressure was 2,122 pounds pressure and the plug was bumped at 12:38 pm. The casing was pressure tested to 2,622 pounds pressure upon the landing of the plug. Casing floats held.

1550764802 2019-02-21 Drill / Deepen / Reopen No Violations
2038470441 2020-3-24 0:00: PW No Violations 0.20
2098669387 2019-06-12 Completion Testing No Violations Status check inspection found the well drilling and completion process complete with a service rig on location rigging up on the #1 well on the pad. The well head A&B sections are equipped with both manual gauges and electronic transducers to monitor annular pressure, the pressures are being checked daily.
513282107 2019-1-6 0:00:0 DD No Violations 0.10

For data sources see[4]