X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21257

Well Details

Well ID: 34-013-21257
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001508
Farm/Lease Name: DILLES BOTTOM 210486
License Status: Producing
License Date: 2017-10-24
Spud Date: 2017-09-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-12-02
Well Total Depth: 23836.00 ft
Configuration: Horizontal
Latitude: 39.930000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-05-26 Proposed Formations:TRENTON, Issued Date:5/26/2017, Expired Date:5/26/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-10-24 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/24/2017, Expired Date:10/24/2019 12:00:00 PM, Drilling unit acres:625.06, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-12-02
Correction to Well 2018-08-24 UPDATE TARGET TAKE ACREAGE AS-DRILLED PLAT
Completion Report Received 2019-01-09
Record Last Modified 2019-01-15
Construction Permit Expires 2019-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-14 10896 11065 0
2019-01-14 23557 23659 0
23557 23659 0
10896 11065 0
10896 11065 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/09/2018 07/27/2018 10552 18,880,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0833313 144259
Plexslick 957 Chemplex Friction Reducer Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00194921 3374.37
Petroleum Distillate 64742-47-8 20 0.0194921 33743.7
Water 7732-18-5 60 0.0584764 101231
Oleic Acid Diethanolamide 93-83-4 2 0.00194921 3374.37
Ammonium Chloride 12125-02-9 2 0.00194921 3374.37
Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 91.014 157,559,000.0
Biotreat 15588 X-Chem Biocide Glutaraldehyde 111-30-8 20 0.00587946 10178.2
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000881918 1526.73
Quaternary Ammonium chloride 68424-85-1 3 0.000881918 1526.73
Water 7732-18-5 74 0.021754 37659.3
SC-30 X-Chem Scale inhibitor sodium hydroxide 1310-73-2 1.5 0.000204564 354.13
Water 7732-18-5 98.5 0.013433 23254.5
Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 8.54608 14,794,500.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00008891 153.913
Methanol 67-56-1 35 0.000622356 1077.39
Coconut oil acid diethanolamine 68603-42-9 5 0.00008891 153.913
Fatty acids, tall oil 61790-12-3 5 0.00008891 153.913
2-Ethylhexanol 104-76-7 10 0.000177816 307.825
2-Propyn-1-ol 107-19-7 5 0.00008891 153.913
Acetic acid 64-19-7 65 0.0011558 2000.87
Olefin Proprietary 5 0.00008891 153.913
Other Chemical(s) Listed Above See Trade Name(s) List 2-Ethylhexanol 104-76-7 10 0.000177816 307.825
Oleic Acid Diethanolamide 93-83-4 2 0.00194921 3374.37
Methanol 67-56-1 35 0.000622356 1077.39
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000881918 1526.73
Ammonium Chloride 12125-02-9 2 0.00194921 3374.37
Water 7732-18-5 60 0.0584764 101231
2-Propyn-1-ol 107-19-7 5 0.00008891 153.913
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00008891 153.913
Water 7732-18-5 98.5 0.013433 23254.5
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00194921 3374.37
Water 7732-18-5 74 0.021754 37659.3
Olefin Proprietary 5 0.00008891 153.913
Fatty acids, tall oil 61790-12-3 5 0.00008891 153.913
Coconut oil acid diethanolamine 68603-42-9 5 0.00008891 153.913
Quaternary Ammonium chloride 68424-85-1 3 0.000881918 1526.73

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-27 H2O 28 7358 Bbl 229580 STINGRAY PRESSURE PUMPING LLC STAGE 61 OF 61…SEE IMAGES FOR STAGES 2-60
2018-06-09 H2O 28 7522 Bbl 169480 STINGRAY PRESSURE PUMPING LLC STAGE 1 OF 61

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION 357682 0 20
2019 GULFPORT ENERGY CORPORATION 1891684 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION Brine 5149 20
2019 GULFPORT ENERGY CORPORATION Brine 18046 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1066608933 2018-1-22 0:00: CT No Violations 1.00
-1107789453 2018-8-20 0:00: DD No Violations 0.50
-1819674620 2018-9-17 0:00: CT No Violations 0.20
-34592128 2020-5-21 0:00: PL No Violations 0.30
-686319644 2019-3-7 0:00:0 PW No Violations 0.40
-753467083 2018-11-14 0:00 PL No Violations 0.50
0686319644 2019-03-07 Production Wells No Violations Status check inspection found (4) wells present on the pad. The said well is equipped with (2) primary master valves along with a production tree that is tied into a main sales line. The lower well head assembly consists of a lower A and upper B section with 2 diameter riser pipes attached to both well head section service ports for the purpose of annular pressure monitoring. The 2 diameter riser pipes are equipped with valves and gauges with the A section gauge reads 200 pounds pressure and the B section gauge reads 300 pounds pressure, the 5.5 casing pressure is 4,800 pounds and the production flow line pressure downstream of the well head choke is 2,200 pounds. The company does have flow back iron and a choke manifold tied into the B section well head, the company field production supervisor Justin Hogue reported they have been bleeding the annular pressure down two times a week and not letting it build up over 1,200 pounds pressure. They B section is being blead down into a gas buster open top 500 barrel tank. Production equipment on location includes (4) gas processing units and a production fluid storage facility that consists of (6) steel 400 barrel tanks situated inside a polymer lined steel containment dike area. There is a third party mid stream pipeline take point on the North East side of the well pad.
0753467083 2018-11-14 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road and well pad surface is stone construction and in good repair. There is a 3rd party mid stream contractor installing a mid stream facility on the North slope of the well pad. All outward slopes are stable with good vegetation established. The restoration is sufficient with no violations noted but will need followed up on when the mid stream facility is complete and the remainder of the production equipment is installed on the well pad. The current operations on the pad finds a derrick style service rig owned by Hybrid Drilling is on location and rigging up on the # 3 well and preparing to drill out the completion plugs. The rig moved off the said well (#1) after drilling out the completion plugs and setting the 2.875 production tubing at a set depth of 10,757. The said well identified as the # 2-A has been stimulated and has (2) primary master valves installed and is awaiting the completion drill out process. No production tubing is slated to be set in the well. No production tank battery has been set on location as of this day.
0880422419 2018-09-17 Completion Testing No Violations On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed the well was currently shut in and was not producing. There was a 5800 pound per square inch manual frack valve installed on the well head and annular pressure monitoring was in place for the 13.375-inch diameter casing, gauge reading was 400 pounds per square inch, and the 9.625-inch diameter deep intermediate casing, gauge reading was 0 pounds per square inch. There were six 500-barrel portable fluid storage tanks that were not hooked to any of the wells on the pad at the time of my inspection. There were currently crews installing gravel on the well pad in preparation for the workover rig to move in. Well heads were identified, and no production was reported for this well at the time of my inspection.
1066608933 2018-01-22 Completion Testing No Violations On the day of my inspection the well was equipped with 5.5-inch diameter casing. The operator was preparing the location for completion operations. They were currently laying down the mats that the equipment will be setting on. Once the mats are installed the company will begin mobilizing completion equipment to the site.
1107789453 2018-08-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed the well was currently shut in and was not producing. There was a 6800 pound per square inch manual master valve installed on the well head and annular pressure monitoring was in place for the 13.375-inch diameter casing, gauge reading was 400 pounds per square inch, and the 9.625-inch diameter deep intermediate casing, gauge reading was 0 pounds per square inch. Also, on location was six 500-barrel portable fluid storage tanks that were not hooked to any of the wells on the pad at the time of my inspection. Well heads were identified, and no production was reported for this well at the time of my inspection.
1110439756 2017-10-18 Casing String Witnessed No Violations Patterson Rig 583 had reach total depth in the 24-inch diameter open hole section of the well bore. The 18.625-inch diameter casing string was ran to a depth of 571 feet. Stingray Cementing Services was on site to perform a cement job on the casing. Stingray ran 950 sacks of Class A cement with cement returns to surface successful. Inspector Bill Stolarik was also on site to witness the casing installation. Please see his report for further details.
1505398286 2017-09-14 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job with Butchs Rat Hole rig on the well along with Stingray Cement Service. The rig has drilled a 36 diameter well bore to a measured depth of 110 from ground level elevation. The rig then proceeded to run 110 of 26 diameter .375 wall casing. Stingray Cement Service cemented the casing using a 92 barrel cement mix consisting of 430 sacks of class A cement. The cement was displaced with 59 barrels of fresh water with cement returns witnessed to surface inside the tin horn cellar.
1508333009 2017-10-18 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with Patterson Drilling rig 583-Wyoming Casing Service and Stingray Cement Service. The rig has drilled a 24 diameter surface borehole to a measured depth of 571 off of a 26 drilling rig Kelly bushing heigth. The target coal seam came in at 525 to 534. Upon reaching total depth the rig loaded the borehole with fresh water before pulling the drill string with circulation established to surface at this point. The drill string was then pulled out of the hole and the 18.625 casing inserted to a depth of 571 with a float collar and casing shoe ran along with 5 centralizers and a cement basket. Stingray Cement Service cemented the casing by first pumping 25 barrels of 6% gel spacer followed by a 200 barrel absolute volume cement mix consisting of 950 sacks of class A cement with .3% calcium and .25 pound per sack loss circulation material and 5.26 gallons of water per sack, the cement yield was 1.18 and weight per gallon was 15.6 with the weight verified by weight of scale. Cement returns were witnessed to surface at 85 barrels into displacement with a total of 163 barrels of fresh water displacement. The final displacement pressure was 300 psi and the casing was pressure tested to 924 psi upon the landing of the cement plug. The casing floats held and the company will run a borehole deviation survey before proceeding.
1819674620 2018-09-17 Completion Testing No Violations Status check inspection accompanied by ODNR Inspector Ryan Armstrong found 4 wells present on the well pad. All 4 wells have had the drilling and completion process complete and are awaiting a service rig to make the clean out The wells are equipped with 2 manually operated primary master valves. Attached to the well head A&B section outlet valves are gate valves with 2 riser pipes connected, attached to the riser pipes are valves and gauges. No production equipment has been set. The lease road and well pad are stone surface construction and in good repair.
880422419 2018-9-17 0:00: CT No Violations 1.00

For data sources see[10]

References