X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21256

Well Details

Well ID: 34-013-21256
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001508
Farm/Lease Name: DILLES BOTTOM 210486
License Status: Producing
License Date: 2017-10-24
Spud Date: 2017-09-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-11-17
Well Total Depth: 24087.00 ft
Configuration: Horizontal
Latitude: 39.930000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-05-26 Proposed Formations:TRENTON, Issued Date:5/26/2017, Expired Date:5/26/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-10-24 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/24/2017, Expired Date:10/24/2019 12:00:00 PM, Drilling unit acres:625.06, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-11-17
Correction to Well 2018-08-24 UPDATE ACREAGE TAKE TARGET AS-DRILLED
Completion Report Received 2019-01-09
Record Last Modified 2019-01-15
Construction Permit Expires 2019-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-14 11019 11188 0
2019-01-14 23823 23925 0
23823 23925 0
11019 11188 0
11019 11188 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/08/2018 07/27/2018 10575 21,955,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 89.3746 183,218,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00202993 4161.35
2-Propyn-1-ol 107-19-7 5 0.00007077 145.073
Water 7732-18-5 60 0.0608979 124841
Oleic Acid Diethanolamide 93-83-4 2 0.00202993 4161.35
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000896828 1838.5
Water 7732-18-5 98.5 0.0135875 27854.4
Methanol 67-56-1 35 0.000495371 1015.51
Coconut oil acid diethanolamine 68603-42-9 5 0.00007077 145.073
Fatty acids, tall oil 61790-12-3 5 0.00007077 145.073
Ammonium Chloride 12125-02-9 2 0.00202993 4161.35
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007077 145.073
Water 7732-18-5 74 0.0221218 45349.6
2-Ethylhexanol 104-76-7 10 0.000141535 290.146
Quaternary Ammonium chloride 68424-85-1 3 0.000896828 1838.5
Olefin Proprietary 5 0.00007077 145.073
SC-30 X-Chem Scale inhibitor Water 7732-18-5 98.5 0.0135875 27854.4
sodium hydroxide 1310-73-2 1.5 0.000206917 424.179
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0663308 135978
Biotreat 15588 X-Chem Biocide Water 7732-18-5 74 0.0221218 45349.6
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000896828 1838.5
Glutaraldehyde 111-30-8 20 0.00597886 12256.7
Quaternary Ammonium chloride 68424-85-1 3 0.000896828 1838.5
Plexslick 957 Chemplex Friction Reducer Oleic Acid Diethanolamide 93-83-4 2 0.00202993 4161.35
Water 7732-18-5 60 0.0608979 124841
Ammonium Chloride 12125-02-9 2 0.00202993 4161.35
Petroleum Distillate 64742-47-8 20 0.0202993 41613.5
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00202993 4161.35
Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 10.2419 20,995,800.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Methanol 67-56-1 35 0.000495371 1015.51
Coconut oil acid diethanolamine 68603-42-9 5 0.00007077 145.073
2-Ethylhexanol 104-76-7 10 0.000141535 290.146
Olefin Proprietary 5 0.00007077 145.073
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007077 145.073
Acetic acid 64-19-7 65 0.000919974 1885.95
2-Propyn-1-ol 107-19-7 5 0.00007077 145.073
Fatty acids, tall oil 61790-12-3 5 0.00007077 145.073

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-27 H2O 15 10434 Bbl 375980 STINGRAY PRESSURE PUMPING LLC STAGE 61/61

STAGES 2-60 SEE IMAGES

2018-06-08 H2O 15 9086 Bbl 375580 STINGRAY PRESSURE PUMPING LLC STAGE 1/61

STAGES 2-60 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION 363809 0 20
2019 GULFPORT ENERGY CORPORATION 1947160 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 GULFPORT ENERGY CORPORATION Brine 5965 20
2019 GULFPORT ENERGY CORPORATION Brine 15889 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0103040130 2018-01-22 Completion Testing No Violations On the day of my inspection the well was equipped with 5.5-inch diameter casing. The operator was preparing the location for completion operations. They were currently laying down the mats that the equipment will be setting on. Once the mats are installed the company will begin mobilizing completion equipment to the site.
103040130 2018-1-22 0:00: CT No Violations 1.00
1509347307 2017-10-30 Casing String Witnessed No Violations On site inspection to witness the surface casing installation and cementing found Patterson Drilling rig 583 on location along with Costys Casing Service and Stingray Cementing. The rig has drilled a 24 diameter surface borehole from a drilling rig Kelly Bushing heigth of 26 above ground level. The last coal seam encountered was between the depths of 528 and 535with 8,000 # weight on the bit maintained through the seam. Upon reaching total depth the rig pumped several soap sweeps and cleaned the hole up before pulling the drill string and starting in the hole with the casing. The casing crew had several delays while running the casing causing a 3 hour total time delay. The last 2 casing joints were circulated in on fresh water before landing the 583 of 18.625 casing and turning the job over to Stingray Cement Service who cemented the casing using a 200 barrel cement mix consisting of 949 sacks of class A cement with the cement weight verified at 15.6 pound per gallon by weight of cement. The cement was displaced to the float collar with 164 barrels of recycled fluid with cement returns witnessed to surface at 115 barrels into displacement. The final displacement pressure was 170 psi and the casing was pressure tested at 670 psi upon the landing of the plug, casing floats held.
1534781562 2018-08-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed the well was currently shut in and was not producing. There was a 6800 pound per square inch manual master valve installed on the well head and annular pressure monitoring was in place for the 13.375-inch diameter casing, gauge reading was 500 pounds per square inch, and the 9.625-inch diameter deep intermediate casing, gauge reading was 0 pounds per square inch. Also, on location was six 500-barrel portable fluid storage tanks that were not hooked to any of the wells on the pad at the time of my inspection. Well heads were identified, and no production was reported for this well at the time of my inspection.
1537205487 2018-09-17 Completion Testing No Violations Status check inspection accompanied by ODNR Inspector Ryan Armstrong found 4 wells present on the well pad. All 4 wells have had the drilling and completion process complete and are awaiting a service rig to make the clean out The wells are equipped with 2 manually operated primary master valves. Attached to the well head A&B section outlet valves are gate valves with 2 riser pipes connected, attached to the riser pipes are valves and gauges. No production equipment has been set. The lease road and well pad are stone surface construction and in good repair.
1537209242 2018-09-17 Completion Testing No Violations On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed the well was currently shut in and was not producing. There was a 5800 pound per square inch manual frack valve installed on the well head and annular pressure monitoring was in place for the 13.375-inch diameter casing, gauge reading was 500 pounds per square inch, and the 9.625-inch diameter deep intermediate casing, gauge reading was 250 pounds per square inch. There were six 500-barrel portable fluid storage tanks that were not hooked to any of the wells on the pad at the time of my inspection. There were currently crews installing gravel on the well pad in preparation for the workover rig to move in. Well heads were identified, and no production was reported for this well at the time of my inspection.
1542211577 2018-11-14 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road and well pad surface is stone construction and in good repair. There is a 3rd party mid stream contractor installing a mid stream facility on the North slope of the well pad. All outward slopes are stable with good vegetation established. The restoration is sufficient with no violations noted but will need followed up on when the mid stream facility is complete and the remainder of the production equipment is installed on the well pad. The current operations on the pad finds a derrick style service rig owned by Hybrid Drilling is on location and rigging up on the # 3 well and preparing to drill out the completion plugs. The rig moved off the said well (#1) after drilling out the completion plugs, 2.875 diameter production tubing was set in the well at to a total depth of 10,757.
1551982662 2019-03-07 Production Wells No Violations Status check inspection found (4) wells present on the pad. The said well is equipped with a tubing head that is tied into a main sales line. The well head consists of a lower A and upper B section with 2 diameter riser pipes attached to both well head sections for the purpose of annular pressure monitoring. The 2 diameter riser pipes are equipped with valves and gauges with the A section gauge reads 400 pounds pressure and the B section gauge reads 800 pounds pressure, the 5.5 casing pressure is 2,000 pounds and the production flow line pressure downstream of the well head choke is 4,000 pounds. The company does have flow back iron and a choke manifold tied into the B section well head, the company field production supervisor Justin Hogue reported they have been bleeding the annular pressure down two times a week and not letting it build up over 1,200 pounds pressure. They B section is being blead down into a gas buster open top 500 barrel tank. Production equipment on location includes (4) gas processing units and a production fluid storage facility that consists of (6) steel 400 barrel tanks situated inside a polymer lined steel containment dike area. There is a third party mid stream pipeline take point on the North East side of the well pad.
739478235 2020-5-21 0:00: PL No Violations 0.30

For data sources see[10]

References