34-013-21215

Well Details

Well ID: 34-013-21215
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001517
Farm/Lease Name: DEL SCORCHO
License Status: Producing
License Date: 2017-11-09
Spud Date: 2017-10-03
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-04-21
Well Total Depth: 20813.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-27 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/9/2017, Expired Date:11/9/2019 12:00:00 PM, Drilling unit acres:467.3896, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-04-21
Correction to Well 2018-09-07 TAKE TARGET AS-DRILLED
Completion Report Received 2019-01-24
Record Last Modified 2019-01-29
Construction Permit Expires 2019-11-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-28 9783 9950 0
2019-01-28 20672 20722 0
20672 20722 0
9783 9950 0
9783 9950 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/21/2018 10/20/2018 9136.07 24,342,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 45 0.00347608 8239.39
ProHib 100 ProFrac Acid Corrosion Inhibitor Listed Below
ProFE 105 ProFrac Acid Chelating Agent Listed Below
ProBreak 100 ProFrac Gelling Agent Listed Below
Glut/Quat 268 BIOC1139A ProFrac Biocide Listed Below
Sand (Proppant) EQT Proppant Listed Below
Hydrochloric Acid (15%) ProFrac Acidizing Listed Below
ProVis 4.04 ProFrac Gel Breaker Water 7732-18-5 45 0.00347608 8239.39
ProChek 100 ProFrac Scale Inhibitor Listed Below
Water ProFrac Carrier/Base Fluid Water 7732-18-5 100 85.7013 203,139,000.0
Ethylbenzene 100-41-4 1 0.00001037 24.574
Petroleum Distillate 64742-47-8 20 0.0695215 164788
Oleic Acid Diethanolamide 93-83-4 2 0.0695215 164788
Ammonium chloride ((NH4)Cl) 12125-02-9 1 0.0695215 164788
Glutaraldehyde 111-30-8 10 0.0010585 2508.97
Silica Substrate 14808-60-7 100 14.0756 33,363,500.0
Formaldehyde 50-00-0 100 0.0206028 48835.2
Hydrotreated light distillate (petroleum) 64742-47-8 65 0.00008238 195.273
Gum guar 9000-30-0 50 0.00005950 141.031
Ammonium persulfate 7727-54-0 100 0.00001056 25.035
Xylene 1330-20-7 5 0.00001037 24.574
Copolymer of 2-propenamide proprietary 30 0.00347608 8239.39
Alcohols, C12-16, Ethoxylate 68551-12-2 2 0.0695215 164788
Propagyl Alcohol 107-19-7 5 0.00001037 24.574
Oleic Acid Diethanolamide 93-83-4 2 0.0695215 164788
Ethylbenzene 100-41-4 1 0.00001037 24.574
Citric acid 77-92-9 100 0.000420786 997.394
Methanol 67-56-1 90 0.000186616 442.338
Copolymer of 2-propenamide proprietary 30 0.00347608 8239.39
Propagyl Alcohol 107-19-7 5 0.00001037 24.574
Alcohols, C7-9-ISO, C8-RICH 68526-83-0 5 0.00002074 49.149
Hydrochloric Acid 7647-01-0 15 0.0182459 43248.5
Alcohols, C7-9-ISO, C8-RICH 68526-83-0 5 0.00002074 49.149
Petroleum Distillate 64742-47-8 20 0.0695215 164788
Alcohols, C12-16, Ethoxylate 68551-12-2 2 0.0695215 164788
Ammonium chloride ((NH4)Cl) 12125-02-9 1 0.0695215 164788
Xylene 1330-20-7 5 0.00001037 24.574
Imidazoline 61790-69-0 5 0.00006221 147.446
Gum guar 9000-30-0 50 0.00005950 141.031
Isopropanol 67-63-0 5 0.00001037 24.574
Imidazoline 61790-69-0 5 0.00006221 147.446
Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride 68424-85-1 30 0.00317549 7526.91
Ethanol 64-17-5 5 0.000529248 1254.48
Methanol 67-56-1 90 0.000186616 442.338
Hydrotreated light distillate (petroleum) 64742-47-8 65 0.00008238 195.273
ProSlick 700 ProFrac Friction Reducer Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-10-20 H2O 15 9593 Bbl 614480 PRO FRAC STAGE 56/56

STAGES 2-55 SEE IMAGES

2018-09-20 H2O 15 5545 Bbl 246860 Producers Service Corporation STAGE 1/56

STAGES 2-55 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 287063 0 27
2019 RICE DRILLING D LLC 1701261 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 70353 27
2019 RICE DRILLING D LLC Brine 37456 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1360666552 2020-5-7 0:00:0 PW No Violations 0.20
-1367861767 2020-1-16 0:00: PW No Violations 0.30
-1567352799 2017-9-28 0:00: DD No Violations 4.00
-2027803769 2018-12-20 0:00 PW No Violations 0.40
-2076043146 2020-7-1 0:00:0 PW No Violations 0.50
1507131536 2017-10-04 Casing String Witnessed No Violations physical address: 62827 johnson south road, bethesda oh 43719. On the day of my inspection I witnessed Express energy had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. Cement was displaced with 70 barrels of fresh water. 15 barrels of cement returned to surface.
1522330279 2018-03-26 Drill / Deepen / Reopen No Violations H&P Rig 471 was drilling in the 17.5-inch diameter open hole section of the well bore at 1550 feet. Once the total depth of the well is reached the company will run the 13.375-inch diameter casing string into the well bore. B&J will perform the cementing procedures for this casing string.
1567352799 2017-09-28 Drill / Deepen / Reopen No Violations Express Energy services was on site drilling the cellar for this well bore. During my visit the total depth of 8 feet was reached and the plastic cellar was put into the bore hole and Express Energy grouted the backside of the cellar with cement.
1735738273 2018-10-29 Completion Testing No Violations On site inspection found the well drilling and stimulation process is now complete and crews are on site preparing for the completion drill out process. The Service rig owned by CWS will arrive tonight and rig up on the H-6 well. A company identified as Tecton will handle the flow back operations with the company men indication no wells will be put into flow back until the drill out operations are complete. 56 total stages were complete. The fluid to be used to drill out was weighed and is 9:1 pound per gallon brine from other production operations in the area. The polymer containment that that the service rig will be situated on appears to be in good repair and free of well bore material. The well pad boundary does have a sound barrier in place on 3 sides. There is a above ground storage tank on location that does have bring water in it. The production fluid facility has been erected and consists of a total of 6-500 barrel capacity steel tanks situated inside a polymer lined steel containment dike area. All 3 wells present that were recently completed have annular pressure monitoring in place on the 13.375 and 9.625 well head sections along with an additional gauge present to monitor the well head B section seal area between the 5.5 and 9.625 diameter casing strings.
1985667635 2019-03-04 Production Wells No Violations Status check inspection found 6 wells present on the location with all 6 being drilled, however only (3) have been recently stimulated and are in the flow back production stages. The (3) producing wells are the # 2-#4 and #6 wells. The wells are producing through choke manifold systems into a gas processing unit. The said well is producing off the 5.5 diameter production casing through a primary master valve with a in line emergency shut down valve present between the well head and choke valve. The 5.5 casing on the said well is equipped with an electronic transducer only with no manual gauges present on any portion of the well head to confirm pressure. No annular pressure monitoring is in place on the well head A or B sections. I have informed the company men on site to install annular pressure monitoring on all 6 wells present on the pad. Production equipment on location consists of (4) gas processing units along with a production facility that consists of (6) steel 500 barrel capacity tanks situated inside a polymer lined steel containment dike area. Addressing the preliminary restoration- The well pad surface and lease road are stone surface construction and in good repair. There is a large above ground storage tank on location that is reported to contain fresh water only that will need removed along with the sound wall barrier that is erected on the earthen berm before the restoration can be signed off on.
2027803769 2018-12-20 Production Wells No Violations Status check inspection found the well drilling and stimulation complete and the well currently in the production flow back stages. The well is selling through a sand trap separator and choke manifold into a gas processing unit. The production fluid is going into (2) 500 barrel horizontal frack tanks. (6) wells are present on the pad that have been drilled however only (2) are producing. A sound wall barrier is present around the well pad location and the pad surface along with the lease road are stone construction and in good repair.

For data sources see[10]