X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21187

Well Details

Well ID: 34-013-21187
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001080
Farm/Lease Name: KRAZY TRAIN
License Status: Producing
License Date: 2018-02-21
Spud Date: 2017-11-02
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-10-27
Well Total Depth: 27875.00 ft
Configuration: Horizontal
Latitude: 40.000000
Longitude: -81.040000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-28 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/28/2017, Expired Date:2/28/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-02-21 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/21/2018, Expired Date:2/21/2020 12:00:00 PM, Drilling unit acres:351.1343, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-09-28 CHANGE TO UNIT SIZE AND TAKE-POINT INFORMATION FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2018-10-27
Correction to Well 2018-12-20 UPDATE TARGET/TAKE PER AS-DRILLED
Record Last Modified 2018-12-20
Construction Permit Expires 2020-02-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
27767 27816 0
9507 9688 0
9507 9688 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1075167469 2019-2-22 0:00: CT No Violations 0.50
-1527660060 2020-9-22 0:00: PW No Violations 0.60
-361496264 2019-4-8 0:00:0 CT No Violations 0.50
0361496264 2019-04-08 Completion Testing No Violations Status check inspection found 3 wells were recently drilled and completed on this pad identified as the # 1 -#3 @ #5 wells. The pressure pumping crews have moved off location and crews are on site preparing the well head and area for completion drill out operations. The well head is equipped with 2 primary master valves and is currently being fitted with a Wildcat Oil Tools completion stack that will be supported by a Wildcat Oil Tools Accumilator and completion drill out pumps. Deep Well Services tubing snubbing unit # 15 is mobilizing to the pad and will rig up on the said well. I did discuss with the company men on site the annular pressure monitoring requirements and they will install gauges on the A&B sections prior to the completion drill out process. No production tubing will be set in the well and the well will be produced off the casign flow cross section. Select Energys presure control choke manifold will be used for the drill out only. A total of (9) 500 barrel horizontal tanks will be used to support the completion drill out process, 4 will be for return fluid and 5 for clean fluid going down hole. There is a large above groiund storage (AST) tank on the left rear corner of the well pad.
0548048941 2018-10-04 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Rig 471 was currently drilling the 12.25-inch diameter well bore at 6460 feet. I spoke with company man Roger Leger who informed me that they intend on cementing the 9.625-inch diameter casing on the evening of 10/6/2018. I spoke with Roger about annular pressure monitoring and he informed me that 34013208180000 had been building pressure on the 13.375-inch diameter casing and they hooked up a line to the Mathena to release the increasing pressure. Roger Leger informed me that pressure had reached 1330 pounds per square inch and was bled down to 30 pounds per square inch. At the time of my inspection pressure had increased to 1220 pounds per square inch in just over 3 hours. EQT production department intends on releasing pressure daily into the Mathena. I informed Roger that they need to continue to closely monitor all annular pressures on the pad.
1075167469 2019-02-22 Completion Testing No Violations Status check inspection found the well drilling process complete and completion crews on location stimulating the #5 well on location. 3 wells were recently drilled identified as the #1-#3 @ #5 wells. The said well is currently on hold and not being stimulated. The B section well head pressure is 1,286 pounds pressure and the company is reporting they are bleeding the well down to 900 pounds pressure every 3 to 4 days.
1233054979 2017-11-08 Drill / Deepen / Reopen No Violations On the day of my inspection I arrived onsite to verify that the 30 inch diameter conductor was cemented to surface over the weekend. The cellar has not been set on this well. A large steel plate is covering the well and I am unable to verify that it was cemented to surface, but was told by George Durington with Rice that it was. Conductor was spudded on 11/2/17 and cemented 11/3/17 by Express.
170478626 2020-9-17 0:00: CT No Violations 1.70
1853949083 2019-7-11 0:00: PW No Violations 0.20
266677264 2020-2-21 0:00: PW No Violations 0.20
548048941 2018-10-4 0:00: DD No Violations 1.00
696842856 2020-7-9 0:00:0 PL No Violations 0.30

For data sources see[4]

References