If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21183 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.02,"lon":-81.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Goshen Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001201 | |
Farm/Lease Name: BOUNTY HUNTER | |
License Status: Producing | |
License Date: 2017-03-20 | |
Spud Date: 2017-10-23 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-01-03 | |
Well Total Depth: 23256.00 ft | |
Configuration: Horizontal | |
Latitude: 40.020000 | |
Longitude: -81.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-02-08 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/8/2017, Expired Date:2/8/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-03-20 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/20/2017, Expired Date:3/20/2019 12:00:00 PM, Drilling unit acres:399.9108, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2017-12-08 | CORRECTION TO TARGET INFORMATION FROM AS DRILLED SURVEY PLAT. ADDITION TO SPECIAL PERMIT CONDITIONS (NO PERF ZONE). |
Reached Total Depth | 2018-01-03 | |
Correction to Well | 2018-03-09 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-09-17 | |
Record Last Modified | 2018-09-21 | |
Construction Permit Expires | 2019-03-20 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-09-20 | 9508 | 9677 | 0 |
2018-09-20 | 23108 | 23159 | 0 |
23108 | 23159 | 0 | |
9508 | 9677 | 0 | |
9508 | 9677 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/20/2018 | 07/14/2018 | 9149.78 | 30,006,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | DireCT | Newpark Drilling Fluids | Lubricant | Water | 7732-18-5 | 89.7 | 0.0141446 | 41336.4 |
Sand (Proppant) | FTS International | Proppant | Listed Below | |||||
Hydrochloric Acid | FTS International | Acidizing | Listed Below | |||||
CS-1000-SI | FTS International | Scale inhibitor | Listed Below | |||||
FRW-1450 | FTS International | Friction reducer | Listed Below | |||||
CI-150 | FTS International | Acid Corrosion Inhibitor | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 89.7 | 0.0141446 | 41336.4 | |
Sodium Hypochlorite | Dirk Thomas Solutions | Biocide | Listed Below | |||||
Water | FTS International | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.6832 | 250,402,000.0 | |
Sodium hydroxide | 1310-73-2 | 5 | 0.000788438 | 2304.15 | ||||
Phosphonic Acid, {Nitrilotris (methylene)} Tris | 6419-19-8 | 35 | 0.00819511 | 23949.5 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.002523 | 7373.27 | ||||
Benzenesulfonic acid, dodecyl-,
compound with 2-aminoethanol (1:1) |
26836-07-7 | 7 | 0.00001337 | 39.062 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00002233 | 65.266 | ||||
Isopropanol | 67-63-0 | 30 | 0.00006700 | 195.799 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.019847 | 58001.4 | ||||
2,2,4-trimethylpentane-1,3-diol monoisobutyrate | 25265-77-4 | 7 | 0.00001337 | 39.062 | ||||
Phosphonic Acid, {Dimethylamino) Methylene} Bis - | 29712-30-9 | 5 | 0.00117073 | 3421.36 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.0044735 | 13073.4 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.00006700 | 195.799 | ||||
2,2,4-trimethylpentane-1,3-diol monoisobutyrate | 25265-77-4 | 7 | 0.00001337 | 39.062 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.00006700 | 195.799 | ||||
Benzenesulfonic acid, dodecyl-,
compound with 2-aminoethanol (1:1) |
26836-07-7 | 7 | 0.00001337 | 39.062 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00002233 | 65.266 | ||||
Sodium hydroxide | 1310-73-2 | 5 | 0.000788438 | 2304.15 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00002233 | 65.266 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.002523 | 7373.27 | ||||
Organic amine resin salt | Proprietary | 30 | 0.00006700 | 195.799 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.0044735 | 13073.4 | ||||
Silica Substrate | 14808-60-7 | 100 | 14.0554 | 41,075,800.0 | ||||
Phosphorous Acid | 10294-56-1 | 2 | 0.000468292 | 1368.55 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.026841 | 78440.6 | ||||
Phosphonic Acid, {Dimethylamino) Methylene} Bis - | 29712-30-9 | 5 | 0.00117073 | 3421.36 | ||||
Phosphorous Acid | 10294-56-1 | 2 | 0.000468292 | 1368.55 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.026841 | 78440.6 | ||||
Phosphonic Acid, {Nitrilotris (methylene)} Tris | 6419-19-8 | 35 | 0.00819511 | 23949.5 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-14 | H2O | 15 | 10613 Bbl | 600429 | Frac Tech Services | STAGE 69/69
STAGES 2-68 SEE IMAGES |
2018-03-03 | H2O | 15 | 7627 Bbl | 201604 | Frac Tech Services | STAGE 1/69
STAGES 2-68 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | 3107094 | 0 | 137 |
2019 | RICE DRILLING D LLC | 2084758 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | Brine | 57197 | 137 |
2019 | RICE DRILLING D LLC | Brine | 22197 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-323694715 | 2020-6-24 0:00: | PW | No Violations | 0.40 |
-552859394 | 2018-8-8 0:00:0 | CT | No Violations | 0.20 |
0050354391 | 2018-08-08 | Completion Testing | No Violations | On site inspection accompanied by ODNR Inspector Ryan Armstrong. Currently there are 4 producing wells on the pad and 3 new wells that the company has service crews on location and completing. The said well is equipped with a lower A section and upper B section with a completion stack present owned by Cameron well company, the well will initially produce through this stack. The production equipment includes 4 gas processing units and 2 glycol heaters. Upon entering the location on the left side of the well pad is the production fluid facility consisting of 6 steel construction 400 barrel fluid capacity production tanks situated inside a polymer lined steel containment dike area. The well has had the completion plugs drilled out with a total of 70 plugs set during the completion process. No tubing will be set in the well only a tubing hanger. The company is monitoring annular pressure. |
0113744596 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed that mountain state pressure services snubbing rig was currently on location and rigging up to drill out isolation plugs. There was a completion stack on the well head with a manual master valve and hydraulic master valve present. Annular pressure monitoring was in place and the 13.375-inch diameter casing had 800 pounds per square inch and the 9.625-inch diameter casing was open to atmosphere, the 18.625-inch diameter casing was also being monitored and was at 0 pounds per square inch. |
0423526596 | 2018-05-24 | Completion Testing | No Violations | Status check inspection found FTS stimulation and wireline service on location and currently stimulating the Bounty Hunter # H-1 and H-3 wells on the pad. The well head lower A and B sections are GE (General Electric) and the completion stack is a company identified as Silver Creek. The 5.5 diameter production casing was set at 23,157 and the well bore stimulation plan calls for a total of 62 stages. |
0552859394 | 2018-08-08 | Completion Testing | No Violations | On the day of my inspection I witnessed that the well was setting static with annular pressure monitoring in place. After speaking with company man Matt Bradford, he informed me that the all 69 isolation plugs on the well had been drilled out and the well was waiting to commence flowback operations. Mountain State Pressure Systems was currently on location drilling out isolation plugs on 34013211820000. There were 4 producing wells on location that were covered with steel cages. |
113744596 | 2018-7-24 0:00: | CT | No Violations | 0.50 |
1514389344 | 2017-12-27 | Drill / Deepen / Reopen | No Violations | |
1529589597 | 2018-06-21 | Completion Testing | No Violations | Status check inspection found FTS International on site perforating stage 3 of 69 proposed total stages to be stimulated. The stage was perforated in 6 clusters of 6 shots between the depths of 22,875 and 22,708 with a completion plug being set at 22,892. The completion well head stack is rented from a company identified as Silver Creek and consists of a lower master valve bolted to the B section well head followed by a hydraulic master valve then a flow cross, atop the flow cross is one final master valve before the pressure lines connection point attachment head. Both the 13.375 and 9.625 casing head sections are being monitored electronically with the 5.5 x 9.625 annulis being hooked up to the choke manifold through flow back iron. This is the last of 3 wells to be stimulated that were recently drilled. |
1532441472 | 2018-07-24 | Completion Testing | No Violations | Status check inspection accompanied by ODNR Inspector Ryan Armstrong found the drilling and stimulation process now complete and a service rig company identified as Mount State Pressure Service on location and rigging up on the hole with their rig and snubbing unit preparing to drill out the 68 completion plugs. The well head completion stack consists of a lower manual and upper hydraulic primary master valve followed by a flow cross then the snubbing unit blow out preventer consisting of a set of blind rams followed by a set of shear rams and a 2nd set of blind rans before the snubbing unit pressure control assembly. No tubing will be set in the well bore at the time of completion only a tubing hanger. Annular pressure monitoring is in place with 800 psi on the 13.375 well head section (between the 13.375 and 9.625 diameter casing strings and zero pressure on the 9.625 well head section (between the 5.5 and 9.625 diameter casing strings. |
1548357082 | 2019-01-24 | Production Wells | No Violations | On site inspection found the said well now in production and selling off the 5.5 diameter production casing through (2) primary master valves. The casing pressure is being monitored off a electronic transducer. No annular pressure monitoring is in place. 2 Crew Men from EQT are on site replacing the emergency shut down master valve hydraulic fluid. 3 wells were recently drilled and completed and 4 pre existing wells. Production equipment consists of 5 gas processing units along with a (6) steel 400 barrel capacity steel tanks situated inside a polymer lined steel containment dike area. The well pad perimeter is protected by an earthen berm however one section was removed near the mid stream equipment and not put back. At the rear of the pad is the mid stream operation operated by EQT. I contacted ODNR Engineer Technician Anthony Carson and he will address the issue with the perimeter berm. We have addressed this issue one before and it was addressed. The Preliminary Restoration is due however recent disturbance around the well pad caused by mid stream installation shall delay the restoration until proper vegetation is established. The well pad and lease road surface is stone and in good repair. |
1553082343 | 2020-9-25 0:00: | CT | No Violations | 0.20 |
2005470917 | 2017-10-25 | Casing String Witnessed | No Violations | On location with Inspector Bryan Sefcik. Express energy had reached the total depth of the 36-inch diameter open hole section of the well bore. The 32- |
335173531 | 2020-7-9 0:00:0 | PL | No Violations | 0.30 |
407058121 | 2020-2-21 0:00: | PW | No Violations | 0.20 |
423526596 | 2018-5-24 0:00: | CT | No Violations | 0.20 |
50354391 | 2018-8-8 0:00:0 | CT | No Violations | 0.20 |
For data sources see[10]