X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21183

Well Details

Well ID: 34-013-21183
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001201
Farm/Lease Name: BOUNTY HUNTER
License Status: Producing
License Date: 2017-03-20
Spud Date: 2017-10-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-01-03
Well Total Depth: 23256.00 ft
Configuration: Horizontal
Latitude: 40.020000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-08 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/8/2017, Expired Date:2/8/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-20 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/20/2017, Expired Date:3/20/2019 12:00:00 PM, Drilling unit acres:399.9108, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-12-08 CORRECTION TO TARGET INFORMATION FROM AS DRILLED SURVEY PLAT. ADDITION TO SPECIAL PERMIT CONDITIONS (NO PERF ZONE).
Reached Total Depth 2018-01-03
Correction to Well 2018-03-09 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-09-17
Record Last Modified 2018-09-21
Construction Permit Expires 2019-03-20

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-09-20 9508 9677 0
2018-09-20 23108 23159 0
23108 23159 0
9508 9677 0
9508 9677 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/20/2018 07/14/2018 9149.78 30,006,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DireCT Newpark Drilling Fluids Lubricant Water 7732-18-5 89.7 0.0141446 41336.4
Sand (Proppant) FTS International Proppant Listed Below
Hydrochloric Acid FTS International Acidizing Listed Below
CS-1000-SI FTS International Scale inhibitor Listed Below
FRW-1450 FTS International Friction reducer Listed Below
CI-150 FTS International Acid Corrosion Inhibitor Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 89.7 0.0141446 41336.4
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 85.6832 250,402,000.0
Sodium hydroxide 1310-73-2 5 0.000788438 2304.15
Phosphonic Acid, {Nitrilotris (methylene)} Tris 6419-19-8 35 0.00819511 23949.5
Sodium hypochlorite 7681-52-9 16 0.002523 7373.27
Benzenesulfonic acid, dodecyl-,

compound with 2-aminoethanol (1:1)

26836-07-7 7 0.00001337 39.062
Quaternary ammonium compound Proprietary 10 0.00002233 65.266
Isopropanol 67-63-0 30 0.00006700 195.799
Hydrochloric Acid 7647-01-0 15 0.019847 58001.4
2,2,4-trimethylpentane-1,3-diol monoisobutyrate 25265-77-4 7 0.00001337 39.062
Phosphonic Acid, {Dimethylamino) Methylene} Bis - 29712-30-9 5 0.00117073 3421.36
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.0044735 13073.4
Ethylene Glycol 107-21-1 30 0.00006700 195.799
2,2,4-trimethylpentane-1,3-diol monoisobutyrate 25265-77-4 7 0.00001337 39.062
Ethylene Glycol 107-21-1 30 0.00006700 195.799
Benzenesulfonic acid, dodecyl-,

compound with 2-aminoethanol (1:1)

26836-07-7 7 0.00001337 39.062
Aromatic aldehyde Proprietary 10 0.00002233 65.266
Sodium hydroxide 1310-73-2 5 0.000788438 2304.15
Dimethylformamide 68-12-2 10 0.00002233 65.266
Sodium hypochlorite 7681-52-9 16 0.002523 7373.27
Organic amine resin salt Proprietary 30 0.00006700 195.799
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.0044735 13073.4
Silica Substrate 14808-60-7 100 14.0554 41,075,800.0
Phosphorous Acid 10294-56-1 2 0.000468292 1368.55
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.026841 78440.6
Phosphonic Acid, {Dimethylamino) Methylene} Bis - 29712-30-9 5 0.00117073 3421.36
Phosphorous Acid 10294-56-1 2 0.000468292 1368.55
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.026841 78440.6
Phosphonic Acid, {Nitrilotris (methylene)} Tris 6419-19-8 35 0.00819511 23949.5

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-14 H2O 15 10613 Bbl 600429 Frac Tech Services STAGE 69/69

STAGES 2-68 SEE IMAGES

2018-03-03 H2O 15 7627 Bbl 201604 Frac Tech Services STAGE 1/69

STAGES 2-68 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 3107094 0 137
2019 RICE DRILLING D LLC 2084758 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 57197 137
2019 RICE DRILLING D LLC Brine 22197 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-323694715 2020-6-24 0:00: PW No Violations 0.40
-552859394 2018-8-8 0:00:0 CT No Violations 0.20
0050354391 2018-08-08 Completion Testing No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong. Currently there are 4 producing wells on the pad and 3 new wells that the company has service crews on location and completing. The said well is equipped with a lower A section and upper B section with a completion stack present owned by Cameron well company, the well will initially produce through this stack. The production equipment includes 4 gas processing units and 2 glycol heaters. Upon entering the location on the left side of the well pad is the production fluid facility consisting of 6 steel construction 400 barrel fluid capacity production tanks situated inside a polymer lined steel containment dike area. The well has had the completion plugs drilled out with a total of 70 plugs set during the completion process. No tubing will be set in the well only a tubing hanger. The company is monitoring annular pressure.
0113744596 2018-07-24 Completion Testing No Violations On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed that mountain state pressure services snubbing rig was currently on location and rigging up to drill out isolation plugs. There was a completion stack on the well head with a manual master valve and hydraulic master valve present. Annular pressure monitoring was in place and the 13.375-inch diameter casing had 800 pounds per square inch and the 9.625-inch diameter casing was open to atmosphere, the 18.625-inch diameter casing was also being monitored and was at 0 pounds per square inch.
0423526596 2018-05-24 Completion Testing No Violations Status check inspection found FTS stimulation and wireline service on location and currently stimulating the Bounty Hunter # H-1 and H-3 wells on the pad. The well head lower A and B sections are GE (General Electric) and the completion stack is a company identified as Silver Creek. The 5.5 diameter production casing was set at 23,157 and the well bore stimulation plan calls for a total of 62 stages.
0552859394 2018-08-08 Completion Testing No Violations On the day of my inspection I witnessed that the well was setting static with annular pressure monitoring in place. After speaking with company man Matt Bradford, he informed me that the all 69 isolation plugs on the well had been drilled out and the well was waiting to commence flowback operations. Mountain State Pressure Systems was currently on location drilling out isolation plugs on 34013211820000. There were 4 producing wells on location that were covered with steel cages.
113744596 2018-7-24 0:00: CT No Violations 0.50
1514389344 2017-12-27 Drill / Deepen / Reopen No Violations
1529589597 2018-06-21 Completion Testing No Violations Status check inspection found FTS International on site perforating stage 3 of 69 proposed total stages to be stimulated. The stage was perforated in 6 clusters of 6 shots between the depths of 22,875 and 22,708 with a completion plug being set at 22,892. The completion well head stack is rented from a company identified as Silver Creek and consists of a lower master valve bolted to the B section well head followed by a hydraulic master valve then a flow cross, atop the flow cross is one final master valve before the pressure lines connection point attachment head. Both the 13.375 and 9.625 casing head sections are being monitored electronically with the 5.5 x 9.625 annulis being hooked up to the choke manifold through flow back iron. This is the last of 3 wells to be stimulated that were recently drilled.
1532441472 2018-07-24 Completion Testing No Violations Status check inspection accompanied by ODNR Inspector Ryan Armstrong found the drilling and stimulation process now complete and a service rig company identified as Mount State Pressure Service on location and rigging up on the hole with their rig and snubbing unit preparing to drill out the 68 completion plugs. The well head completion stack consists of a lower manual and upper hydraulic primary master valve followed by a flow cross then the snubbing unit blow out preventer consisting of a set of blind rams followed by a set of shear rams and a 2nd set of blind rans before the snubbing unit pressure control assembly. No tubing will be set in the well bore at the time of completion only a tubing hanger. Annular pressure monitoring is in place with 800 psi on the 13.375 well head section (between the 13.375 and 9.625 diameter casing strings and zero pressure on the 9.625 well head section (between the 5.5 and 9.625 diameter casing strings.
1548357082 2019-01-24 Production Wells No Violations On site inspection found the said well now in production and selling off the 5.5 diameter production casing through (2) primary master valves. The casing pressure is being monitored off a electronic transducer. No annular pressure monitoring is in place. 2 Crew Men from EQT are on site replacing the emergency shut down master valve hydraulic fluid. 3 wells were recently drilled and completed and 4 pre existing wells. Production equipment consists of 5 gas processing units along with a (6) steel 400 barrel capacity steel tanks situated inside a polymer lined steel containment dike area. The well pad perimeter is protected by an earthen berm however one section was removed near the mid stream equipment and not put back. At the rear of the pad is the mid stream operation operated by EQT. I contacted ODNR Engineer Technician Anthony Carson and he will address the issue with the perimeter berm. We have addressed this issue one before and it was addressed. The Preliminary Restoration is due however recent disturbance around the well pad caused by mid stream installation shall delay the restoration until proper vegetation is established. The well pad and lease road surface is stone and in good repair.
1553082343 2020-9-25 0:00: CT No Violations 0.20
2005470917 2017-10-25 Casing String Witnessed No Violations On location with Inspector Bryan Sefcik. Express energy had reached the total depth of the 36-inch diameter open hole section of the well bore. The 32-
335173531 2020-7-9 0:00:0 PL No Violations 0.30
407058121 2020-2-21 0:00: PW No Violations 0.20
423526596 2018-5-24 0:00: CT No Violations 0.20
50354391 2018-8-8 0:00:0 CT No Violations 0.20

For data sources see[10]

References