34-013-21142

Well Details

Well ID: 34-013-21142
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001444
Farm/Lease Name: DOMINATOR
License Status: Producing
License Date: 2017-02-17
Spud Date: 2017-03-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-08-04
Well Total Depth: 22941.00 ft
Configuration: Horizontal
Latitude: 39.940000
Longitude: -80.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-07 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/7/2016, Expired Date:12/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-02-17 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/17/2017, Expired Date:2/17/2019 12:00:00 PM, Drilling unit acres:540.3007, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-08-04
Correction to Well 2017-09-15 UPDATE TARGET/TAKE PER AS-DRILLED PLAT RCVD 8-29-17- ALE.
Completion Report Received 2018-07-03
Record Last Modified 2018-07-10
Construction Permit Expires 2019-02-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-07-09 10060 10198 0
2018-07-09 22640 22778 0
10060 10198 0
22640 22778 0
10060 10198 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/02/2017 01/19/2018 9814.86 32,683,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KWBO-2 Keane Group Breaker Listed Below
KAI-12 Keane Group Acid inhibitor Listed Below
KWG-111L Keane Group Gelling agent Listed Below
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
Silver 7500 P.O.P. Keane Group Polymer Water 7732-18-5 89.7 0.0142439 44379.9
Water 7732-18-5 15 0.000220953 688.425
Water 7732-18-5 50 0.0453252 141220
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 50 0.0453252 141220
Water 7732-18-5 89.7 0.0142439 44379.9
Water 7732-18-5 15 0.000220953 688.425
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 87.5378 272,742,000.0
Sand (Proppant) Keane Group Proppant Listed Below
KSI-19 Keane Group Scale inhibitor Listed Below
Hydrochloric Acid Keane Group Acidizing Listed Below
KFR-23 Keane Group Friction Reducer Listed Below
Sodium persulfate 7775-27-1 99 0.00000445 13.86
Guar gum 9000-30-0 60 0.000290228 904.264
Prop-2-yn-1-ol 107-19-7 5 0.00001687 52.562
Lubricating oils (petroleum), C20-50,

hydrotreated neutral oil-based

72623-87-1 45 0.00066286 2065.28
Sodium hydroxide 1310-73-2 5 0.000793976 2473.8
Trade Secret Proprietary 15 0.000220953 688.425
Trade Secret Proprietary 10 0.00004837 150.711
Sodium persulfate 7775-27-1 99 0.00000445 13.86
Copolymer of 2-propenamide 69418-26-4 20 0.0181301 56487.9
Trade Secret Proprietary 40 0.000589209 1835.8
Methanol 67-56-1 90 0.000303659 946.113
Ethylbenzene 100-41-4 1 0.00000337 10.512
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000290228 904.264
Trade Secret Proprietary 40 0.000589209 1835.8
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000290228 904.264
Oleic acid diethanolamide 93-83-4 2 0.00181301 5648.79
Methanol 67-56-1 30 0.00625427 19486.5
Trade Secret Proprietary 10 0.00004837 150.711
Trade Secret Proprietary 1 0.00001473 45.895
Sodium hypochlorite 7681-52-9 16 0.00254072 7916.15
Trade Secret Proprietary 15 0.000220953 688.425
Copolymer of 2-propenamide 69418-26-4 20 0.0181301 56487.9
Xylene 1330-20-7 5 0.00001687 52.562
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001687 52.562
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00181301 5648.79
Sodium hydroxide 1310-73-2 5 0.000793976 2473.8
Fatty imidazoline 61790-69-0 5 0.00001687 52.562
Sodium hypochlorite 7681-52-9 16 0.00254072 7916.15
Isopropyl alcohol 67-63-0 5 0.00001687 52.562
Guar gum 9000-30-0 60 0.000290228 904.264
Hydrochloric Acid 7647-01-0 15 0.0365267 113806
Lubricating oils (petroleum), C20-50,

hydrotreated neutral oil-based

72623-87-1 45 0.00066286 2065.28
Silica Substrate 14808-60-7 100 12.0891 37,665,900.0
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0181301 56487.9
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0181301 56487.9
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00181301 5648.79
Methanol 67-56-1 30 0.00625427 19486.5
Trade Secret Proprietary 5 0.00007365 229.475
Trade Secret Proprietary 1 0.00001473 45.895
Oleic acid diethanolamide 93-83-4 2 0.00181301 5648.79
Trade Secret Proprietary 5 0.00007365 229.475

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-01-19 H2O 15 9284 Bbl 500222 Keane Frac STAGE 76 OF 76
2017-12-03 H2O 15 10625 Bbl 504650 Keane Frac STAGE 2 OF 76

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 4684854 0 234
2019 RICE DRILLING D LLC 1993050 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 165831 234
2019 RICE DRILLING D LLC Brine 31819 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1708994255 2017-4-28 0:00: CS No Violations
-1857238926 2017-3-15 0:00: DD No Violations
-1872445599 2020-7-22 0:00: PL No Violations 0.20
-487407748 2019-3-19 0:00: PL No Violations 0.20
-567188183 2020-1-2 0:00:0 PW No Violations 0.20
-663317108 2018-10-28 0:00 PW No Violations 0.20
-926653863 2017-3-17 0:00: CS No Violations 2.00
-951017132 2020-3-25 0:00: PW No Violations 0.20
0487407748 2019-03-19 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR Engineer Tech Anthony Carson found that the area affected by the well pad construction stable with vegetation established and erosion control in place. There is a area of the well pad that has fluid being recovered on the outward slope. To date 11 monitoring wells have been installed on the well pad surface and a 3rd party contract company identified as SE Technologies is on site sampling fluid from the monitoring wells. The employee from SE identified as Steve Gerritsen indicated he would be on site the next 2 days sampling. The Preliminary Restoration will be addressed once the area disturbed by the fluid recover is remediated and all fluid recovery has ceased. Addressing the wells. 5 wells are present on the pad and in production. All have annular pressure monitoring in place. The annular pressure is being monitored by the means of electronic transducers installed on the riser pipes attached to the well head A&B sections. The riser pipes are plumbed into a sales line that is fitted with a choke valve.
0663317108 2018-10-28 Production Wells No Violations Status check inspection found 5 wells on location all in the production flow back stages. All 5 wells were equipped to produce off the 5.5 production casing through 2 primary master valves with a single additional emergency shut down valve present in the production tree. All 5 wells are producing through sand trap separators with a production fluid temporary storage are set up on location consisting of (4) 500 barrel horizontal mobile tanks. Of the 5 wells present one annular pressure gauge is present and in order to indicate annular pressure monitoring is in place. No surface casing pressure relief devices are present on any of the 5 wells. During the last inspection on 08/27/2018 the DNR Inspector Ryan Armstrong noted to absence of proper well identification and on this day no well identification has been posted, also noted was the condition of the annular pressure gauges. Polymer containment is present around the well heads that the production flow back equipment is situated on, also present on the polymer containment is a diesel engine powered electrical light plant with no earthen ground present. Also present on location is a production facility consisting of (7) steel production tanks capable of holding 500 barrels fluid volume each. Multiple water trucks were present on location and in question to the destination of the produced water it was indicated they were hauling to the Goliath Well pad and staging at the Razing Kane.
0840278279 2018-08-27 Production Wells No Violations On the day of my inspection I witnessed that the well was currently in flowback operations with 2 flowback sand traps, and a choke manifold, the sand traps were tied directly to the production fluid tanks. The well appeared to have gauges monitoring annular pressure but at the time of my inspection I was unable to read them. Production equipment included an additional sand trap, an individual Gas Processing unit and 6- 500-barrel production fluid tanks, and a 100-barrel production fluid tank that was tied directly into the production sand trap all tanks were shared with the other producing wells on the pad. The well pad and all equipment were within earthen containment with secondary containment around the production tanks. There was also a small excavator on location that had replaced a well pad drain. There were multiple Emergency Shutoff Devices on location, Identification tag were not present, and production was current.
0926653863 2017-03-17 Casing String Witnessed No Violations
1058068222 2020-1-2 0:00:0 PW No Violations 0.20
1411465126 2017-03-17 Casing String Witnessed No Violations
1541539411 2018-11-06 Production Wells No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong along with Supervisors Brent Bear and Mark Atkinson. The purpose of the inspection was to review the water being recovered from the North outward slope of the well pad. It was observed that a 3rd party contractor was on site with portable pumps set up at 4 locations recovering surface fluid from both on and off the well pad, the fluid was being stored in (2) steel construction 500 barrel capacity portable tanks situated on the well pad. I titrate tested the fluid found present in the recovery station points directly on the North side of the well pad at 3 different locations and found no chlorides over 496 parts per million. Addressing the well head assembly, the well is equipped with a lower A and upper B section with no pressure gauges manual or electronic visible on either well head section service outlet ports. There are (2) 7.0625 diameter completion valves install horizontally in line with each other atop the well head B section. Down stream from the master valves is an emergency shut down device. The well is being produced through temporary installed sand trap separators before the product enters the sales line point next to the well head. No pressure gauge was visible on the well head to indicate the 5.5 casing pressure. The well was producing off the 5.5 casing.
1544789884 2018-12-13 Production Wells No Violations On site inspection accompanied by Division Hydrology and Engineering Staff along with Supervisors Brent Bear and Mark Atkinson. Also present was representatives with EQT and Rice Drilling. The purpose of the meeting was to discuss the fluid recover efforts on the well pad slope and well pad surface along with a remediation and stabilization plan moving forward. Currently 5 wells are present in production on the well pad. Since my last inspection the company has installed annular pressure monitoring on the well head A&B sections. The pressure is being monitored with electronic gauges attached to 2 diameter riser pipes. The riser pipes are tied into 2 diameter flow lines that are plumed into the production tanks. Also present at the well head is proper identification. The wells are still producing through a 3rd party contractor choke manifold and sand trap separator. The sand trap separators are being evacuated into (2) 500 barrel production tanks separate from the production facility. Additional production equipment on site is 5 gas processing units and a production fluid facility that consists of (7) 500 barrel vertical production tanks along with one horizontal 100 barrel tank, all situated inside a polymer lined steel containment dike area. The identification on the tank battery reflected EQT as the owner however the well head identification read Rice Drilling. The well pad surface is of stone construction.
1708994255 2017-04-28 Casing String Witnessed No Violations ON location to witness the cementing of the 20 surface casing. The rig ran the casing with all the required float equipment to 509. O-Tex pumping cemented it with 760 sacks of Class H cement. Good cement was returned to the surface. The pressure test of the casing passed. See the cement ticket for the details.
1857238926 2017-03-15 Drill / Deepen / Reopen No Violations I went to find access to this pad. Express Energy was drilling the holes for the cellers at the time of the inspection. No conductor has yet been set. Nomac Drilling Rig # 82 will move on this location after they finish the last two wells on Son-uva Digger pad.
840278279 2018-8-27 0:00: PW No Violations 0.50

For data sources see[10]