X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21119

Well Details

Well ID: 34-013-21119
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001448
Farm/Lease Name: SMASHOSAURUS
License Status: Producing
License Date: 2017-03-15
Spud Date: 2017-06-16
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-10-14
Well Total Depth: 21195.00 ft
Configuration: Horizontal
Latitude: 39.930000
Longitude: -80.880000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-01 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/1/2016, Expired Date:11/1/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-15 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/15/2017, Expired Date:3/15/2019 12:00:00 PM, Drilling unit acres:450.7347, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-10-14
Correction to Well 2017-12-29 UPDATE TAKE/TARGET/ACREAGE PER PLAT.
Completion Report Received 2018-09-12
Record Last Modified 2018-09-18
Construction Permit Expires 2019-03-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-09-17 10170 10308 0
2018-09-17 21049 21000 0
21049 21000 0
10170 10308 0
10170 10308 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/10/2018 05/12/2018 10029 27,402,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 APB-1 FTS International Gel breaker Water 7732-18-5 89.7 0.0144567 37861
HVG-1 4.0 FTS International Water gelling agent Listed Below
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
FRW-1450 FTS International Friction reducer Listed Below
Ammonium persulfate 7727-54-0 95 0.00000544 14.25
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0291849 76433.2
Ethylene Glycol 107-21-1 10 0.00238963 6258.26
Ethylene Glycol 107-21-1 10 0.00238963 6258.26
Silica Substrate 14808-60-7 100 12.2912 32,189,700.0
Sodium hypochlorite 7681-52-9 16 0.00257867 6753.35
Ethylene Glycol 107-21-1 30 0.00012776 334.593
Guar gum 9000-30-0 50 0.000172819 452.599
Sodium hydroxide 1310-73-2 5 0.000805836 2110.42
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00486416 12738.9
Quaternary ammonium compound Proprietary 10 0.00004259 111.531
Raffinates, sorption process 64741-85-1 55 0.000190101 497.859
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0291849 76433.2
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00486416 12738.9
Sodium hypochlorite 7681-52-9 16 0.00257867 6753.35
Ammonium persulfate 7727-54-0 95 0.00000544 14.25
Hydrochloric Acid 7647-01-0 15 0.0380698 99701.9
Raffinates, sorption process 64741-85-1 55 0.000190101 497.859
Isotridecanol, ethoxylated 9043-30-5 2 0.00000691 18.104
Isotridecanol, ethoxylated 9043-30-5 2 0.00000691 18.104
Organic amine resin salt Proprietary 30 0.00012776 334.593
Quartz 14808-60-7 4 0.00001383 36.208
Guar gum 9000-30-0 50 0.000172819 452.599
Sodium hydroxide 1310-73-2 5 0.000805836 2110.42
Aromatic aldehyde Proprietary 10 0.00004259 111.531
Dimethylformamide 68-12-2 10 0.00004259 111.531
Quartz 14808-60-7 4 0.00001383 36.208
Isopropanol 67-63-0 30 0.00012776 334.593
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 87.3169 228,676,000.0
CS-500 SI FTS International Scale inhibitor Listed Below
CI-150 FTS International Acid corrosion inhibitor Listed Below
Hydrochloric Acid FTS International Acidizing Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 89.7 0.0144567 37861
Sand (Proppant) FTS International Proppant Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-11 H2O 15 9613 Bbl 502531 Frac Tech Services STAGE 65/65

STAGES 2-64 SEE IMAGES

2018-02-10 H2O 15 4772 Bbl 201233 Frac Tech Services STAGE 1/63

STAGES 2-62 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 2238566 0 114
2019 RICE DRILLING D LLC 1748559 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 51679 114
2019 RICE DRILLING D LLC Brine 24792 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1145017325 2017-9-19 0:00: CS No Violations
-1376079197 2017-10-11 0:00 DD No Violations
-29153199 2020-4-2 0:00:0 PW No Violations 0.30
-379789162 2017-6-18 0:00: CS No Violations
0359288112 2017-09-21 Casing String Witnessed No Violations On location to witness the cementing of the 18-5/8 mine string. The rig ran the casing and all the required float equipment to 445. 39 below the mine void (390-406). O-Tex Pumping balanced the bottom of the casing with 41 bbls ( 190 sacks) of cement and grouted the casing above the mine in two stages with 76 bbls (355 sacks) of cement. Good cement was returned to the surface.
0379789162 2017-06-18 Casing String Witnessed No Violations 06/18/2017 On site at 8:30 am to witness the conductor cement jobs on the # 3 & # 7 wells with Express Energys Conductor rigs (2) and Express Energy Cement Service. The conductor rig has drilled a 36 diameter borehole to a measured depth of 100 and ran 32 diameter x .375 wall pipe to 100. The casing was cemented using a 48 barrel cement mix consisting of 275 sacks of class A cement weighing 15.6 pound per gallon with 2% calcium and 1/2 pound per sack loss circulation material. The cement was displaced to 90 from surface with 75 barrels of fresh water with cement returns witnessed to surface at 65 barrels into displacement with 1 of cement left inside the cellar to cause a liquid tight seal.
0663896919 2018-07-18 Completion Testing No Violations Status check inspection found the well drilling and stimulation process complete with 65 total stages completed during the stimulation process. A service rig company identified as CWS is on site and has completed drilling out the plugs on the said well. Silver Creek flow back service is on site handing the well pressure control. Annular pressure monitoring is in place.
1145017325 2017-09-19 Casing String Witnessed No Violations The rig set weld 24 LP with all the required flaot equipment at 300. Otex Pumping cemented the well with 465 sacks of Class H cement. There were good cement returns to the surface. The pressure test of the casing passed.
1325710531 2017-06-28 Drill / Deepen / Reopen No Violations This is the pad that Nomac 82 will move on after completing the laterals on Dominator pad. Just finding the pad prior to the move.
1376079197 2017-10-11 Drill / Deepen / Reopen No Violations On location to do a walk-a-round inspection of the pad. No issued were noted.
1547055342 2019-01-09 Production Wells No Violations Status check inspection found 4 wells present on the pad with all 4 wells being in production. All 4 wells are producing off the 5.5 diameter production casing through 2 primary master valves. The wells are still selling through sand trap separators with 2 500 barrel portable tanks present to service the sand trap separators when they are evacuated. There is a emergency shut down device installed in the production flowline at the well head. Annular pressure monitoring riser pipes are in place on the well head A&B sections, however no gauges are present. Additional production equipment is 4 gas processing units along with a production facility consisting of 4 steel tanks capable of holding 400 barrels fluid volume each.
1565635057 2019-8-12 0:00: PL No Violations 0.20
1690192074 2017-10-13 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson rig 582 running their 5.5 inch production casing towards their total depth of 21194 feet. All containment appears to be visual free of any tears or punctures. All of the chemicals were within containment. The pad is surrounded by an earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
1918816424 2018-01-23 Completion Testing No Violations On the day of my inspection I was accompanied by Anthony Carson and Luke Saunders. We were on site to witness the construction of the above ground, open top, fluid holding tanks that the operator was installing to utilize during the completion phase of the wells. The operator had a service rig on site during our inspection.
359288112 2017-9-21 0:00: CS No Violations
663896919 2018-7-18 0:00: CT No Violations 0.30

For data sources see[10]

References