X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21008

Well Details

Well ID: 34-013-21008
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001341
Farm/Lease Name: KRNYAICH UNIT A
License Status: Producing
License Date: 2015-11-17
Spud Date: 2015-11-21
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2016-02-12
Well Total Depth: 22894.00 ft
Configuration: Horizontal
Latitude: 39.960000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-11-17 Proposed Formations:POINT PLEASANT, Issued Date:11/17/2015, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:307.093, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-02-12
Correction to Well 2016-03-18 change target/takepoint/acreage as-drilled plat-ALE
Completion Report Received 2017-03-01
Construction Permit Expires 2017-11-16
Record Last Modified 2017-12-29
Correction to Well 2018-01-05 UPDATE ACREAGE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-03-01 10836 20739 0
2017-03-01 20990 22490 0
20990 22490 0
10836 20739 0
10836 20739 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/22/2016 11/10/2016 10122 23,414,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
MC S-2510T Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
KCL POTASSIUM CHLORIDE Halliburton Additive Listed Below Listed Below 0 0 0
AccessFrac LT material Halliburton Diverter Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.862751 1,897,650.0
SAND-COMMON WHITE-100 MESH, SSA-2, 100 LB SACK (100002158) Halliburton Proppant Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
WG-36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0230199 50633
Polylactide resin Proprietary 100 0.000181857 400
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000171814 378
Inorganic salt Proprietary 30 0.0230199 50633
Neutralized Polyacrylic Emulsion Proprietary 10 0.00224055 4929
Sodium sulfate 7757-82-6 0.1 0.00000011 1
Ethylene Glycol 107-21-1 60 0.0134433 29570
Ethanol 64-17-5 1 0.000210969 465
Guar gum 9000-30-0 100 0.00888461 19542
Acrylamide acrylate copolymer Proprietary 30 0.0230199 50633
Propargyl alcohol 107-19-7 10 0.00005727 126
Phosphoric acid 7664-38-2 0.1 0.00002110 47
Olefins Proprietary 5 0.00006873 152
Hydrochloric acid 7647-01-0 15 0.11786 259245
Sodium persulfate 7775-27-1 100 0.000108659 239
Potassium chloride 7447-40-7 100 0.00620586 13650
Ethoxylated alcohols Proprietary 30 0.000171814 378
Fatty acids, tall oil Proprietary 30 0.000171814 378
Methanol 67-56-1 60 0.000373163 821
Crystalline silica, quartz 14808-60-7 100 11.0142 24,226,100.0
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00105484 2321
Glutaraldehyde 111-30-8 30 0.00632906 13921
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.0638 193,699,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-09-22 H2O 8 12783 Bbl 477613 Halliburton STAGE 1/45

OPEN HOLE STAGES 2-3,6-40 SEE IMAGES STAGES 4-5 N/A

2016-11-09 H2O 8 13000 Bbl 474201 Halliburton STAGE 45/45

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 XTO ENERGY INC. 0 0 0
2017 XTO ENERGY INC. 3211664 0 340
2018 XTO ENERGY INC. 1669037 0 214
2019 XTO ENERGY INC. 0 0 0

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 XTO ENERGY INC. Brine 0 0
2017 XTO ENERGY INC. Brine 48903 340
2018 XTO ENERGY INC. Brine 19038 214
2019 XTO ENERGY INC. Brine 0 0

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1417539506 2019-8-27 0:00: PW No Violations 0.20
-1743872620 2016-1-26 0:00: PL No Violations 1.00
-1890914847 2019-1-15 0:00: PW No Violations 0.20
-334391749 2017-6-7 0:00:0 CT No Violations 0.50
0334391749 2017-06-07 Completion Testing No Violations On the day of my inspection the well appeared to be in the flow back phase. The well was connected to a sand separator and a 500 barrel fluid holding tank. The tank battery consisted of five 400 barrel production fluid holding tanks and gas processing units.
0459426102 2018-08-01 Production Wells No Violations On the day of my inspection I witnessed that KLX energy, Starett Energy Services, and Shale Pro were currently on location. After speaking with Matt Thomas, Completions Foreman for XTO Energy he informed me that they had set a retrievable plug at 9330 feet inside the 2.875-inch diameter tubing as well as a Valve Removal plug on the B section of the well head. There was also a 2-way check valve installed on the tubing hanger. Matt informed me that once SIMOPS was completed they will be covering the wellheads with steel cages. XTO Energy plans to move the Auger rig on to set cellars and conductors on 8/2/2018.
1743872620 2016-01-26 Preliminary Restoration No Violations On this day I was on site to witness a casing job. During my visit I reviewed the sites preliminary restoration efforts. The site was appeared to be in satisfactory condition with proper erosion and sediment controls in place. This sites preliminary restoration is passed.
1808484357 2015-11-21 Casing String Witnessed No Violations
1890914847 2019-01-15 Production Wells No Violations Status check inspection found the said well currently shut in with a Back Pressure valve in the tubing hanger and VR plugs in both B section 2 outlet ports. The well is equipped with a production tree. The flow line has been disconnected and a steel cage is over the well while the newer 4 wells on the pad is being completed.
459426102 2018-8-1 0:00:0 PW No Violations 0.50
886942439 2020-4-16 0:00: PW No Violations 0.20

For data sources see[10]

References