Well Details

Well ID: 34-013-20915
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001193
Farm/Lease Name: KURTH UNIT C
License Status: Producing
License Date: 2015-10-09
Spud Date: 2015-07-06
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-10-22
Well Total Depth: 19354.00 ft
Configuration: Horizontal
Latitude: 40.030000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-01-16 Proposed Formations:POINT PLEASANT, Issued Date:1/16/2015, Expired Date:1/15/2017 12:00:00 PM, Drilling unit acres:472.9487, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2015-07-17 CORRECTION TO CASING PROGRAM.
APP 2015-10-09 Proposed Formations:POINT PLEASANT, Issued Date:10/9/2015, Expired Date:10/8/2017 12:00:00 PM, Drilling unit acres:196.175, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2015-10-22
COMBINATION WELL 2016-01-04 ASDRILLED PLAT. CORRECTIONS TO TARGET AND TAKE POINT.
Completion Report Received 2016-07-05
Construction Permit Expires 2016-10-08
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/14/2016 04/09/2016 9694 17,744,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00468534 7782.3
Other - (non-hazardous) NA 70 0.0109325 18158.7
Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Water 7732-18-5 15 0.00153259 2545.61
Other - (non-hazardous) NA 85 0.00868466 14425.1
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.04713 78282.4
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0201986 33549.6
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.1504 148,078,000.0
AP Breaker Clearwater International Gel Breaker
AP Breaker Universal Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00006984 116
Ammonium Persulfate 7727-54-0 100 0.0054016 8972
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.74281 16,182,700.0
Unigel 5F Universal Viscosifier Guar Gum NA 95 0.00513152 8523.4
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00204733 3400.59
Ethoxylated alcohol 68002-97-1 35 0.000306619 509.291
Other - (non-hazardous) NA 30 0.00307099 5100.88
Acetophenone 98-86-2 1 0.00000876 14.551
Methanol 67-56-1 5 0.00004380 72.756
Formaldehyde 50-00-0 1 0.00000876 14.551
Polyethylene Glycol 25322-68-3 50 0.00511832 8501.47
Thiourea 62-56-6 1 0.00000876 14.551
Short chained glycol ether 112-34-5 60 0.000525633 873.071
KCl, Muirate of Potash IMC Salt Calcium and Magnesium Chlorides and Sulfates NA 0.2 0.00000014 0.232
Sodium Chloride 7647-14-5 0.3 0.00000021 0.348
Potassium Chloride 7447-40-7 99.5 0.00006949 115.42
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0792648 131658
Hydrochloric Acid 7647-01-0 15 0.0373891 62102.8
Other - (non-hazardous) NA 85 0.847486 1,407,660.0
Hydrochloric Acid 7647-01-0 15 0.0329024 54650.5

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 11737 Bbl 479300 Universal Well Services Inc. STAGE 34/34

60 SHOTS

H2O 0 11569 Bbl 440200 Universal Well Services Inc. STAGE 1/34

60 SHOTS STAGES 2-33 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 XTO ENERGY INC. 2008763 0 171
2017 XTO ENERGY INC. 2892639 0 256
2018 XTO ENERGY INC. 2559928 0 365
2019 XTO ENERGY INC. 241416 0 80

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 XTO ENERGY INC. Brine 17384 171
2017 XTO ENERGY INC. Brine 8839 256
2018 XTO ENERGY INC. Brine 10058 365
2019 XTO ENERGY INC. Brine 1113 80

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1753037383 2015-7-11 0:00: CS No Violations 5.00
-367916076 2018-4-24 0:00: PW No Violations 0.50
-426350696 2015-7-6 0:00:0 CS No Violations 4.00
-824596906 2018-4-23 0:00: PW No Violations 0.50
0283362850 2018-08-23 Production Wells No Violations On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 3 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing and was open flowing through a manual master valve. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open. Production equipment included a gas processing unit and 6 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current.
0367916076 2018-04-24 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing and was open flowing with valves in the open position. Annular pressure monitoring was in place but had no digital readouts available for reference. Production equipment included a sand trap, a Gas Processing unit, line heater, and 6- 400 barrel purge tanks shared with 3401320914, 3401321141, 3401321147. Roustabout crew was currently on location and installing lines for annular pressure release. Identification tags were present and production was up to date.
0426350696 2015-07-06 Casing String Witnessed No Violations On this day Express Energy had reached a total depth of 100. The 30 casing was ran and cemented into the 36 open hole. Express Energy was on site to cement the casing with 275 sacks of Class A cement. Cement to surface was established. See cement ticket for details.
0824596906 2018-04-23 Production Wells No Violations The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains six 400-barrel production fluid holding tanks. Annular pressures readings supplied by the company were 915 pounds in between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 238 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. The production records within RBDMS are currently updated to 2017.
0825101652 2019-03-25 UrbanProduction Wells No Violations Status check inspection found a 3rd party contractor identified as Shale Pro on location and currently on site installing the production tree assembly on the well head B section. The company man on site identified as Tracy Vanscoy indicated the company recently had 2.875 production tubing installed on all 4 wells on the pad. The wells were previously produced through the 5.5 production casing. Production equipment on site includes a production facility consisting of (6) 500 barrel steel tanks situated inside a polymer lined steel containment dike area. Also present is (4) gas processing units. Proper well identification is posted at the well pad entry point and tank battery, once the well heads are assembled the identification will be put back up on the wells. The lease road and well pad surface is stone construction and in good repair, no earthen berm is present. Also noted on 11/03/2016 the said Company XTO Energy submitted a waiver to the Division asking for a variance pertaining to fencing, screening and landscaping, the language pertaining to the waiver is found in OAC 1501:9-9-05.
1286076151 2019-9-9 0:00:0 PW No Violations 0.20
1753037383 2015-07-11 Casing String Witnessed No Violations On this day First Class Rig #1 had reached a total depth of 439. The 18.625 casing string was ran and cemented into a 26 open hole to a depth of 397. Nabors (C and J) Cementing was on site and cemented the casing with 890 sacks of Class A cement. Cement to surface was established following top out job. See cement ticket for details.
283362850 2018-8-23 0:00: PW No Violations 0.80
825101652 2019-3-25 0:00: UP No Violations 0.20
853111994 2020-3-4 0:00:0 PW No Violations 0.20