Well ID: 34-013-20883 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Somerset Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001171 | |
Farm/Lease Name: FRANCIS 210045 | |
License Status: Producing | |
License Date: 2015-01-30 | |
Spud Date: 2015-02-03 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-09-08 | |
Well Total Depth: 17353.00 ft | |
Configuration: Horizontal | |
Latitude: 39.880000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-06 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/6/2014, Expired Date:11/5/2016 12:00:00 PM, Drilling unit acres:422.622, Proposed Well Type:OG, Proposed Well Class:EW |
APP | 2015-01-30 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/30/2015, Expired Date:1/29/2017 12:00:00 PM, Drilling unit acres:422.622, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-09-08 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Correction to Well | 2016-03-25 | change in target/takepoint/acreage per as drilled plat-ALE |
Completion Report Received | 2016-12-16 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Construction Permit Expires | 2017-01-29 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Record Last Modified | 2019-06-07 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-19 | 9999 | 0 | |
9999 | 0 | ||
9999 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-06-12 | H2O | 0 | 272856 Gal | 272840 | Halliburton | STAGE 46/46
40 SHOTS |
2016-05-20 | H2O | 0 | 284689 Gal | 275600 | Halliburton | STAGE 1/46
40 SHOTS STAGES 2-45 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | 2259172 | 2442 | 181 |
2017 | GULFPORT ENERGY CORPORATION | 1918260 | 129 | 365 |
2018 | GULFPORT ENERGY CORPORATION | 902467 | 0 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 156611 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | Brine | 21542 | 181 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 15106 | 365 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 7389 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1429 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1428777207 | 2015-1-22 0:00: | DD | No Violations | 0.50 |
-549964966 | 2020-2-20 0:00: | PW | No Violations | 0.20 |
-655225495 | 2017-10-17 0:00 | PW | No Violations | 1.00 |
-664050141 | 2015-9-2 0:00:0 | DD | No Violations | |
0049148950 | 2019-03-18 | Production Wells | No Violations | On site inspection accompanied by ODNER Engineers Paul Logan, Mark Atkinson and Anthony Carson. On site to represent Gulfport was Blake Arthur. The reason for the on site meeting was to review 2 separate earthen slips on the outward slopes of the well pad. The company had submitted material modifications and is working with the ODNR Engineering staff to address the slips. There is 3 wells present on the pad that are producing, the production equipment and production flow lines are on the opposite side of the pad from the earthen slip. The wells are producing. |
0655225495 | 2017-10-17 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400- |
0664050141 | 2015-09-02 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig, Patterson Drilling 257, is drilling an 8.5 hole at a depth of 12,444 in the horizontal section of the well. |
1235533272 | 2018-11-29 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control in place and vegetation established. Previously a slip occurred on the west side of the well pad shortly after the initial excavation construction phase, this area was inspected and no earthen movement was observed. The lease road and well pad surface is stone construction and in good repair. The well pad entrance does have a gate present. 3 wells are present on the well pad with the said well being equipped with a lower A and upper B section, attached to the A&B section well head ports is 2 diameter riser pipes that are equipped with valves and gauges for annular pressure monitoring purposes. The 13,375 well head ( A) section gauge reads 325 pounds pressure. The 9.625 well head (B) section gauge reads 1,300 pounds pressure. The 5.5 diameter casing internal pressure is 400 pounds pressure. The well head assembly does have a tubing production tree and the flow line pressure down stream from the well head choke is 200 pounds pressure. The well is producing into a gas processing unit. The production fluid storage area consists of (4) steel construction 400 barrel fluid capacity tanks and one 50 barrel tank situated inside a polymer lined steel containment dike area. |
1428777207 | 2015-01-22 | Drill / Deepen / Reopen | No Violations | Operator plans to mobilize Rocky Mountain Drilling to this site and start setting the cellars. They anticipate to commence drilling the open hole section after. |
1439895212 | 2015-08-18 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing cementing operations. Patterson Drilling 257 drilled 394 of 24 borehole then ran 393 of J-55 18.625 casing. Stingray cemented the casing in place with 590 sacks of class H cement. I witnessed 30 barrels of cement circulate to surface. |
49148950 | 2019-3-18 0:00: | PW | No Violations | 1.00 |
66324181 | 2020-10-19 0:00 | PW | No Violations | 0.20 |
For data sources see[9]