Well Details

Well ID: 34-013-20882
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Somerset Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001171
Farm/Lease Name: FRANCIS 210045
License Status: Producing
License Date: 2015-01-30
Spud Date: 2015-02-03
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-08-14
Well Total Depth: 17532.00 ft
Configuration: Horizontal
Latitude: 39.880000
Longitude: -81.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-06 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/6/2014, Expired Date:11/5/2016 12:00:00 PM, Drilling unit acres:422.622, Proposed Well Type:OG, Proposed Well Class:EW
APP 2015-01-30 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/30/2015, Expired Date:1/29/2017 12:00:00 PM, Drilling unit acres:422.622, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-08-14 Status/TD depth based on Drill Survey 11-6-2015 ALE
Correction to Well 2016-03-25 change in target/takepoint/acreage per as-drilled plat-ALE
Completion Report Received 2016-12-16 Status/TD depth based on Drill Survey 11-6-2015 ALE
Construction Permit Expires 2017-01-29 Status/TD depth based on Drill Survey 11-6-2015 ALE
Record Last Modified 2017-10-23 Status/TD depth based on Drill Survey 11-6-2015 ALE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-19 8993 17369 0
8993 17369 0
8993 17369 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/20/2016 06/12/2016 8608 13,520,400.0 55000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Base Fluid NA Confidential 0 0 0
Hazardous and Non-Hazardous Ingredients Hydrotreated light petroleum distillate 64742-47-8 30 0.0261679 33004
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.00009694 123
Propargyl alcohol 107-19-7 10 0.00003231 41
Methanol 67-56-1 60 0.000193881 245
Fatty acids, tall oil Confidential 30 0.00009694 123
Olefins Confidential 5 0.00003878 52
Sodium chloride 7647-14-5 30 0.0261679 33004
Water 7732-18-5 100 0.436152 550092
Acrylamide acrylate polymer Confidential 30 0.0261679 33004
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.00009694 123
Hydrochloric acid 7647-01-0 10 0.0383816 48409
Crystalline silica, quartz 14808-60-7 100 10.2319 12,904,900.0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 89.2967 112,624,000.0
FR-76, HAI-OS ACID INHIBITOR, SAND-COMMON

WHITE - 100 MESH, 3307 LB BAG, SAND-PREMIUM WHITE-40/70, BULK

Halliburton Corrosion Inhibitor, Friction Reducer, Proppant NA Confidential 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-05-20 H2O 15 301665 Gal 275600 Halliburton STAGE 1/47

40 SHOTS STAGES 2-46

2016-06-14 H2O 10 272966 Gal 275600 Halliburton STAGE 47/47

40 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 2239633 4200 181
2017 GULFPORT ENERGY CORPORATION 2093746 197 365
2018 GULFPORT ENERGY CORPORATION 1019650 1 363
2019 GULFPORT ENERGY CORPORATION 180192 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 26437 181
2017 GULFPORT ENERGY CORPORATION Brine 17183 365
2018 GULFPORT ENERGY CORPORATION Brine 9150 363
2019 GULFPORT ENERGY CORPORATION Brine 1722 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1291838812 2020-10-19 0:00 PW No Violations 0.20
0847605497 2018-11-29 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control in place and vegetation established. Previously a slip occurred on the west side of the well pad shortly after the initial excavation construction phase, this area was inspected and no earthen movement was observed. The lease road and well pad surface is stone construction and in good repair. The well pad entrance does have a gate present. 3 wells are present on the well pad with the said well being equipped with a lower A and upper B section, attached to the A&B section well head ports is 2 diameter riser pipes that are equipped with valves and gauges for annular pressure monitoring purposes. The 13,375 well head ( A) section gauge reads 375 pounds pressure. The 9.625 well head (B) section gauge reads 1,250 pounds pressure. The 5.5 diameter casing internal pressure is 500 pounds pressure. The well head assembly does have a tubing production tree and the flow line pressure down stream from the well head choke is 200 pounds pressure. The well is producing into a gas processing unit. The production fluid storage area consists of (4) steel construction 400 barrel fluid capacity tanks and one 50 barrel tank situated inside a polymer lined steel containment dike area.
1004260360 2017-10-17 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400-
1421942824 2015-01-22 Drill / Deepen / Reopen No Violations Operator plans to mobilize Rocky Mountain Drilling to this site and start setting the cellars. They anticipate to commence drilling the open hole section on 01/26/2015.
1438690666 2015-08-04 Drill / Deepen / Reopen No Violations
1688185823 2019-03-18 Production Wells No Violations On site inspection accompanied by ODNER Engineers Paul Logan, Mark Atkinson and Anthony Carson. On site to represent Gulfport was Blake Arthur. The reason for the on site meeting was to review 2 separate earthen slips on the outward slopes of the well pad. The company had submitted material modifications and is working with the ODNR Engineering staff to address the slips. There is 3 wells present on the pad that are producing, the production equipment and production flow lines are on the opposite side of the pad from the earthen slip. The wells are producing.
1974534556 2015-02-03 Casing String Witnessed No Violations On this day the 26 conductor pipe was ran and cemented to a depth of 110 in a 30 open hole. 288 sks were pumped and cement to surface established. See cement ticket for details. No violations noted.
803277149 2020-2-20 0:00: PW No Violations 0.20
847605497 2018-11-29 0:00 PL No Violations 0.40

For data sources see[10]

References