If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20850 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.92,"lon":-80.86,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: York Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001102 | |
Farm/Lease Name: NORTH WEST UNIT | |
License Status: Producing | |
License Date: 2016-04-29 | |
Spud Date: 2015-12-04 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-07-08 | |
Well Total Depth: 19911.00 ft | |
Configuration: Horizontal | |
Latitude: 39.920000 | |
Longitude: -80.860000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-28 | Proposed Formations:POINT PLEASANT, Issued Date:8/28/2014, Expired Date:8/27/2016 12:00:00 PM, Drilling unit acres:704, Proposed Well Type:OG, Proposed Well Class:NWC |
APP | 2015-10-19 | Proposed Formations:POINT PLEASANT, Issued Date:10/19/2015, Expired Date:10/18/2017 12:00:00 PM, Drilling unit acres:703.33, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2016-04-29 | Proposed Formations:POINT PLEASANT, Issued Date:4/29/2016, Expired Date:4/29/2018 12:00:00 PM, Drilling unit acres:259.0888, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-07-08 | |
Correction to Well | 2016-08-12 | UPDATED TAKE POINT AND TARGET LOCATION PER AS DRILLED SURVEY |
Completion Report Received | 2017-01-26 | |
Record Last Modified | 2018-02-21 | |
Construction Permit Expires | 2018-04-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-01-26 | 10661 | 19702 | 0 |
10661 | 19702 | 0 | |
10661 | 19702 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/06/2016 | 09/16/2016 | 10221 | 19,017,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.79075 | 1,393,240.0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
Cla-Web(TM) II | Halliburton | Clay Stabilizer | Listed Below | Listed Below | 0 | 0 | 0 | |
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.00232457 | 4096 | ||||
Inorganic salt | Proprietary | 30 | 0.0241368 | 42528 | ||||
Guar gum | 9000-30-0 | 100 | 0.00656559 | 11568 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.0241368 | 42528 | ||||
Quaternary amine | Proprietary | 1 | 0.00007998 | 142 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.67776 | 17,051,400.0 | ||||
Olefins | Proprietary | 5 | 0.00007015 | 126 | ||||
Amine | Proprietary | 0.1 | 0.00000400 | 8 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000010 | 1 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005846 | 103 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0241368 | 42528 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002223 | 40 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000175376 | 309 | ||||
Sodium chloride | 7647-14-5 | 1 | 0.00003999 | 71 | ||||
Chlorine compound | Proprietary | 30 | 0.00119969 | 2114 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000175376 | 309 | ||||
Amine salts | Proprietary | 1 | 0.00004399 | 79 | ||||
Methanol | 67-56-1 | 60 | 0.000381878 | 673 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00009932 | 175 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000175376 | 309 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00666993 | 11752 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.10591 | 186607 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00111166 | 1959 | ||||
Ammonium compound | Proprietary | 30 | 0.00119969 | 2114 | ||||
Ethanol | 64-17-5 | 1 | 0.000222331 | 392 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.0139474 | 24575 | ||||
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 89.479 | 157,654,000.0 | |
MC S-2510T | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-09-16 | H2O | 15 | 13345 Bbl | 564384 | Halliburton | STAGE 34/34
60 SHOTS |
2016-09-08 | H2O | 15 | 14476 Bbl | 449739 | Halliburton | STAGE 1/34
60 SHOTS STAGES 2-33 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 310347 | 0 | 60 |
2017 | XTO ENERGY INC. | 3546594 | 0 | 310 |
2018 | XTO ENERGY INC. | 499415 | 0 | 59 |
2019 | XTO ENERGY INC. | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 5014 | 60 |
2017 | XTO ENERGY INC. | Brine | 16264 | 310 |
2018 | XTO ENERGY INC. | Brine | 2249 | 59 |
2019 | XTO ENERGY INC. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1326401712 | 2019-6-24 0:00: | PW | No Violations | 1.50 |
-1480968331 | 2015-1-13 0:00: | CS | No Violations | 4.00 |
-1689609185 | 2018-10-16 0:00 | PW | No Violations | 0.80 |
-321996334 | 2019-8-12 0:00: | PL | No Violations | 0.40 |
-388170379 | 2016-5-24 0:00: | CS | No Violations | 9.00 |
0388170379 | 2016-05-24 | Casing String Witnessed | No Violations | |
1007824152 | 2018-07-18 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector Ryan Armstrong found the well head isolated while stimulation operations are taking place on the # 7 and # 5 wells on the well pad. The well head has had VR isolation plugs set in being the production valves and a back pressure valve in the tubing hanger. A cage is installed over the well head. A production facility is present on the rear left corner of the well pad. |
1114129032 | 2019-7-9 0:00:0 | PW | No Violations | 1.00 |
1322232722 | 2016-05-26 | Production Wells | No Violations | The well currently appears to be equipped properly to be considered capable of production. The well site appears to be in satisfactory condition. |
1480968331 | 2015-01-13 | Casing String Witnessed | No Violations | On the date of inspection I am on site to witness the cementing of the conductor pipe. I was informed by XTO consultant, Paul Hahn, that Express Energy Services drilled a 36 inch diameter hole to a depth of 100 feet. Express set 100 feet of 106lbs/ft, 29.25 ID casing. Express pumped 275sk of Class A cement, 15.6ppg, 1.18 yield, 2% CaCl2, 0.25lbs/sk of flake. Express displaced with 64.8bbl of fresh water. 25bbl of cement returned to surface and stayed at surface while I was on site. |
1483192222 | 2016-12-31 | Production Wells | No Violations | On site inspection as a follow up to a call received by the Divisions Emergency Response Supervisor Trish Cartmell at 5:20 am on this day in regards to a Glycol Heater fire on the well pad. Upon my arrival the fire had been extinguished and all active wells on the pad shut in and isolated. XTO Company Man Tracy VanScoy was on site and reported the well drilling and completion process has be completed and the well is in its initial flow back production stages. Mr. VanScoy pointed out the dump valve on the line heater had washed out and allowed gas to escape. The escaping gas was then ignited by the internal flame on the line heater. The rear area of the line heater was damaged by the fire along with a 2nd line heater next to it servicing the other operating well on the pad. The fire appeared to be contained only to the area of the heaters with only the line heaters and polymer containment damaged by the fire. The line heater for the 2-H well was leaking glycol. The glycol was being recovered by placing a bucket under the damaged area that was leaking. The company has vacuum trucks enroot to recover the remainder of the glycol in the heater. There is also (3) 400 barrel production tanks inside the containment with the glycol heaters that were not affected by the event. A preliminary boundary inspection was conducted and no product was observed outside the production containment area. |
1689609185 | 2018-10-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently shut in and annular pressure monitoring was in place, at the time of my inspection Key Energy Services had pressure pumping equipment hooked up to the well head. Annular pressures were monitored with transducers without a digital readout so could not be verified. Both the 9.625-inch diameter casing and 13.375-inch diameter casing were tied to a pressure bleed down line and the 13.375-inch diameter casing was open at the time of my inspection. Production Equipment included a gas processing unit and 6- 400-barrel steel production fluid tanks. There was a Key Energy Services coil tubing rig and pressure pumping truck on location at the time of my inspection. After speaking with XTO Production superintendent Tracy Vanscoy he informed me that Key Coil Tubing Rigs blow out preventer malfunctioned, and they were currently waiting on a new Blow Out Preventer which is scheduled to arrive on Friday 10/19/2018. |
3758265 | 2020-9-10 0:00: | PW | No Violations | 0.20 |
718792958 | 2020-6-17 0:00: | PW | No Violations | 0.30 |
For data sources see[10]