Well Details

Well ID: 34-013-20754
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Somerset Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000884
Farm/Lease Name: BROTHERS
License Status: Producing
License Date: 2014-03-13
Spud Date: 2014-03-27
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-06-17
Well Total Depth: 15546.00 ft
Configuration: Horizontal
Latitude: 39.950000
Longitude: -81.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-02-14 Proposed Formations:POINT PLEASANT, Issued Date:2/14/2014, Expired Date:2/14/2016 12:00:00 PM, Drilling unit acres:595.833, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2014-03-13 Proposed Formations:POINT PLEASANT, Issued Date:3/13/2014, Expired Date:3/12/2016 12:00:00 PM, Drilling unit acres:595.833, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-06-17
Completion Report Received 2015-06-15
Construction Permit Expires 2016-03-12
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/21/2014 09/23/2014 8509 9,219,000.0 0

Fluid Composition Data

-65 Scale Inhibitor
Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Methanol 67-56-1 60 0.000277187 0
Propargyl alcohol 107-19-7 10 0.00004620 0
LCA-1 Halliburton Solvent Paraffinic solvent Confidential 100 0.00202323 0
FE-2A Halliburton Additive Citric acid 77-92-9 60 0.00385456 0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 90.9671 0
Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00106492 0
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00087539 0
Other Purpose Organic phosphonate Confidential 0 0.00638952 0
Olefins Confidential 0 0.00002369 0
Fatty acids, tall oil Confidential 0 0.000138594 0
Formaldehyde 50-00-0 0 0.00010661 0
Water 7732-18-5 0 0.0189909 0
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 0 0.000138594 0
Alcohols, C14-C15, ethoxylated 68951-67-7 0 0.000138594 0
Olefins Confidential 0 0.00000474 0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Acetic anhydride 108-24-7 100 0.00557454 0
Acetic acid 64-19-7 60 0.0033452 0
40/70 White Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 8.88562 0
FRA 405 Operator Friction Reducer Alcohol, C12-16, Ethoxilated 68551-12-2 7 0.00497 0
Ammonium chloride 12125-02-9 7 0.00497 0
Sodium Chloride 7647-14-5 10 0.0071 0
Petroleum Distillate 64742-47-8 40 0.0284 0
Water 7732-18-5 36 0.02556 0
OptiKleen- Halliburton Concentrate Sodium perborate tetrahydrate 10486-00-7 100 0.00509065 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-09-22 H2O 8 238353 Bbl 260177 Halliburton STAGE 32/32

SHOTS

2014-08-24 H2O 15 46350 Bbl 352900 STAGE 1/32

45 SHOTS STAGES 2-31 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION 761723 1290 76
2015 GULFPORT ENERGY CORPORATION 2640139 727 364
2016 GULFPORT ENERGY CORPORATION 1192433 0 362
2017 GULFPORT ENERGY CORPORATION 747991 1 361
2018 GULFPORT ENERGY CORPORATION 533581 1 340
2019 GULFPORT ENERGY CORPORATION 98004 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION Brine 7062 76
2015 GULFPORT ENERGY CORPORATION Brine 15729 364
2016 GULFPORT ENERGY CORPORATION Brine 6647 362
2017 GULFPORT ENERGY CORPORATION Brine 4588 361
2018 GULFPORT ENERGY CORPORATION Brine 3666 340
2019 GULFPORT ENERGY CORPORATION Brine 711 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1214006937 2020-1-27 0:00: PW No Violations 0.50
-1264918859 2018-9-13 0:00: PW No Violations 0.50
-1275315499 2015-1-23 0:00: PL No Violations 0.50
-1344922108 2018-9-13 0:00: PW No Violations 0.60
-1661242823 2014-7-29 0:00: DD No Violations 0.50
-1802293900 2014-6-18 0:00: CS No Violations 3.00
-294395456 2018-6-5 0:00:0 PW No Violations 0.50
-701432656 2017-5-30 0:00: PW No Violations 0.50
0153424038 2014-04-27 Administrative Inspection No Violations Call from operator for spudding the 18.625 section.
0289219571 2014-04-28 Casing String Witnessed No Violations On the day of my inspection the 18.625 casing was ran and cemented. See cement ticket for details. No violations noted.
0294395456 2018-06-05 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing with a plunger lift system. Annular pressure monitoring was in place for the intermediate casing gauge read 0 pounds per square inch, the surface casing gauge read 250 pounds per square inch. Production equipment included a Separator, Gas Processing unit, production equipment was shared with 34013207520000, 34013207530000. There are 6- 400 barrel purge tanks and a 50 barrel brine storage tank shared with 34013207520000, 34013207530000. Identification tags were present, and production was up to date. No violations were found at the time of my inspection.
0701432656 2017-05-30 Production Wells No Violations An inspection of this site revealed the well was equipped in a manner that made it appear to have the capability of producing. The location included a gas processing unit and a tank battery that consisted of six 400 barrel production tanks.
1034203076 2016-05-26 Production Wells No Violations The well currently appears to be equipped properly to be considered capable of production. The well site appears to be in satisfactory condition.
1264918859 2018-09-13 Production Wells No Violations On site inspection found 3 wells present on the pad. A third party contractor identified as Integrity Services is on location and rigged up on the well with a slick line truck broaching the production tubing on the # 1well preparing the well to be equipped with a plunger lift system. The 2 additional wells on the pad the Brothers # 2 & #3 are equipped with a plunger lift production system. The production equipment consists of a single gas processing unit and production fluid facility consisting of 6 steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels posted. Identification is posted at each well head and signage is posted at the entry point of the lease road. The entry point of the well pad is gated. There is a third party mid stream operation at the entry point of the well pad on the right side. The lease road and well pad surface are of stone construction and in good repair. The Divisions Engineering section is addressing a slip on the South slope of the well pad.
1275315499 2015-01-23 Preliminary Restoration No Violations The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed.
1344922108 2018-09-13 Production Wells No Violations On site inspection found 3 wells present on the pad. A third party contractor identified as Integrity Services is on location and rigged up on the well with a slick line truck broaching the production tubing on the # 1well preparing the well to be equipped with a plunger lift system. The 2 additional wells on the pad the Brothers # 2 & #3 are equipped with a plunger lift production system. The production equipment consists of a single gas processing unit and production fluid facility consisting of 6 steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels posted. Identification is posted at each well head and signage is posted at the entry point of the lease road. The entry point of the well pad is gated. There is a third party mid stream operation at the entry point of the well pad on the right side. The lease road and well pad surface are of stone construction and in good repair. The Divisions Engineering section is addressing a slip on the South slope of the well pad.
1520621514 2018-03-01 Production Wells No Violations The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains six 400-barrel production fluid holding tanks. The production records within RBDMS are currently updated to 2017.
153424038 2014-4-27 0:00: AM No Violations 0.50
1661242823 2014-07-29 Drill / Deepen / Reopen No Violations On the day of my inspection the rig had mobilized and the containment was being removed and disposed of. The rig mats were being sanitized and moved to another location. No violations noted.
1802293900 2014-06-18 Casing String Witnessed No Violations On the day of my inspection Nomac 310 had reached total depth and the 5.5 casing was being run and would be cemented soon. No violations noted.
288926585 2020-2-10 0:00: PW No Violations 0.20
289219571 2014-4-28 0:00: CS No Violations
343458092 2020-10-26 0:00 PW No Violations 0.20

For data sources see[9]

References