34-009-21597

Well Details

Well ID: 34-009-21597
Loading map...
Country: United States
State: Ohio
County: Athens
Municipality: Rome Township
Operator Name: PDQ OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: MATHENY DONZEL
License Status: Producing
License Date: 1966-04-14
Spud Date: 1966-04-19
Spud Drilling Contractor:
Final Drill Date: 1966-05-19
Well Total Depth: 1629.00 ft
Configuration: Vertical
Latitude: 39.310000
Longitude: -81.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1966-04-19
Completed 1966-05-19
Reached Total Depth 1966-05-19
Completion Report Received 1966-06-10
Change of Owner 2001-05-07 Operator changed from 1395, BEARDMORE OIL & GAS CO to 6986, C & N OIL & GAS COMPANY
Change of Owner 2012-10-02 Operator changed from 6986, C & N OIL & GAS COMPANY to 9038, PDQ OIL & GAS LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-03-10 1586 1588 8
1586 1588 8
1586 1588 8

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2000 Bbl 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1999 BEARDMORE OIL & GAS CO 0.00 0.00 365
2000 BEARDMORE OIL & GAS CO 0.00 0.00 365
2001 C & N OIL & GAS COMPANY 0.00 25.00 306
2002 C & N OIL & GAS COMPANY 0.00 52.00 365
2003 C & N OIL & GAS COMPANY 0.00 32.00 365
2004 C & N OIL & GAS COMPANY 0.00 27.00 365
2005 C & N OIL & GAS COMPANY 0.00 0.00 365
2006 C & N OIL & GAS COMPANY 0.00 0.00 365
2007 C & N OIL & GAS 0.00 29.00 365
2008 C & N OIL & GAS COMPANY 0.00 0.00 365
2009 C & N OIL & GAS COMPANY 0.00 0.00 365
2010 C & N OIL & GAS COMPANY 0.00 48.00 365
2011 C & N OIL & GAS COMPANY 0.00 19.00 365
2012 PDQ OIL & GAS LLC 0.00 0.00 63
2013 PDQ OIL & GAS LLC 0.00 41.00 365
2014 PDQ OIL & GAS LLC 0.00 164.00 365
2015 PDQ OIL & GAS LLC 0.00 56.00 365
2016 PDQ OIL & GAS LLC 0.00 108.00 365
2017 PDQ OIL & GAS LLC 0.00 94.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1999 BEARDMORE OIL & GAS CO Brine 0 365
2000 BEARDMORE OIL & GAS CO Brine 0 365
2001 C & N OIL & GAS COMPANY Brine 0 306
2002 C & N OIL & GAS COMPANY Brine 0 365
2003 C & N OIL & GAS COMPANY Brine 0 365
2004 C & N OIL & GAS COMPANY Brine 0 365
2005 C & N OIL & GAS COMPANY Brine 0 365
2006 C & N OIL & GAS COMPANY Brine 0 365
2007 C & N OIL & GAS Brine 1 365
2008 C & N OIL & GAS COMPANY Brine 0 365
2009 C & N OIL & GAS COMPANY Brine 0 365
2010 C & N OIL & GAS COMPANY Brine 1 365
2011 C & N OIL & GAS COMPANY Brine 1 365
2012 PDQ OIL & GAS LLC Brine 0 63
2013 PDQ OIL & GAS LLC Brine 7 365
2014 PDQ OIL & GAS LLC Brine 12 365
2015 PDQ OIL & GAS LLC Brine 9 365
2016 PDQ OIL & GAS LLC Brine 12 365
2017 PDQ OIL & GAS LLC Brine 10 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1104263872 2015-11-25 0:00 PW No Violations 3.00
-1112370279 2015-11-3 0:00: PW No Violations 0.20
-1154042855 2015-9-9 0:00:0 PW No Violations 2.00
-117679592 2015-10-14 0:00 AM No Violations 1.00
-1268309133 2015-9-3 0:00:0 PW No Violations 1.50
-1327410359 2015-10-13 0:00 PW No Violations 1.00
-1586754927 2015-10-1 0:00: PW No Violations 1.50
-1814953188 2015-8-31 0:00: PW No Violations 1.50
-2139580554 2015-9-14 0:00: PW No Violations 0.20
-230893092 2015-8-3 0:00:0 PW No Violations 9.00
-371448547 2015-9-16 0:00: PW No Violations 0.30
-418530717 2015-10-13 0:00 PW No Violations 1.00
0023454439 2015-08-04 Production Wells No Violations
0117679592 2015-10-14 Administrative Inspection No Violations I received a phone call from Josh Garland letting me know the violations have been resolved and I could write it off on my end.
0153695203 2015-09-01 Production Wells No Violations I left the site to follow up on other notices and left Trish Cartmell to witness the removal of the contaminated sand and gravel lense. When I returned the roll off box was gone and the area had all of the top soil replaced. I confirmed with Trish the company had removed all of the contaminated sand and gravel lense and taken it to a land fill. They then replaced the topsoil. The area still needs to be graded and have vegetative cover established.
0202563696 2015-08-10 Production Wells No Violations Booms and pads in places. Contamination leaching from sand lense into creek. Small test sumps dug in this area to gain a feel for extent of flow. The syphon dam appears to be in good working condition at the end of the site 39. 30995 -81. 92360.
0230893092 2015-08-03 Production Wells No Violations
0371448547 2015-09-16 Production Wells No Violations Booms and pads in place.
0418530717 2015-10-13 Production Wells No Violations Company has constructed a new dike and set a steel 100 Bbl tank. The contaminated soils along the creek bed have been removed and there is no longer any free standing product. The EPA has placed hard booms below the culvert but will remove them at their convenience. The area has been seeded and mulched and vegetative cover has been reestablished. Close violation.
1020950396 2015-08-11 Production Wells No Violations Met Trish Cartmell of ODNR emergency response and viewed the site. The syphon dam had been removed by this point.
1104263872 2015-11-25 Production Wells No Violations Meet Aaron Wolfe of OEPA and Trish Cartmell of ODNR Emergency Response to review clean up of spill.
1112370279 2015-11-03 Production Wells No Violations The EPAs hard booms are still in place, there is no sheen on the waters surface but there is a slight film.
1154042855 2015-09-09 Production Wells No Violations Booms and pads in place, the sumps are showing more oil is still leaching out of the contaminated creek bank.
1268309133 2015-09-03 Production Wells No Violations Stopped by site to check booms and pads. The water line has been clearly marked so the company may make a better decision about where to place the new tank battery.
1327410359 2015-10-13 Production Wells No Violations Met emergency response manager at site to review clean up and discuss closing violation.
1438616871 2015-08-02 Production Wells Violations Noted Got called by Kip Thompson about a spill in Athens County. Mark Hines contacted him about it. He is cleaning up the job for the owner. I will be heading out there asap. It is 8:30 Sunday night.

I arrived on the site shortly after 10pm. Mark Hines has 2 workers with him doing the cleanup. The estimated loss from measuring the tank is 23bbl. I talked with the owner of the well and he thinks they got it contained at its furthest point. Barry Bowers arrived shortly after I did with his water truck. The tank is being emptied at this time. They are planning on sucking the pools of oil out of the creek. They have diapers and booms spread throughout the contaminated area to soak up what they can. I will send an update in the morning.

1438725182 2015-08-03 Production Wells No Violations 8:00 am: I arrived on location to relieve Inspector Justin Smith. Upon arrival, Mark Hines and Mark Abdella were using two track hoes to finish up soil excavation from underneath the tank pad location. All contaminated soil has been stockpiled on pit liner material and covered until it can be hauled away for disposal. A hard boom and underflow dam was installed in the creek approximately 1/3 mile downstream from the spill origin, no fluid was being released from the underflow dam as of yet, but likely will if a rain event occurs. Booms and oil absorbent pads are in the creek in several spots beyond the underflow dam to catch any product that gets past. Huffman-Bowers has two vac-trucks on location and are recovering oil from two temporary pooling/collection areas in the creek. SW Region ER Manager Trisha Cartmell arrived on location at 9:30 am and remained there to direct cleanup upon my departure. As I was leaving, one vac-truck was preparing to dump a load of water in the creek to flush free product to a common collection point where the other vac-truck could recover it. I will stop by this location again on my way home to check cleanup status.

3:30 pm: Back on location to check progress of cleanup. Mark Abdella of PDQ O&G was using a track hoe to remove oily round straw bales from the creek and placing them in a roll-off box. Huffman-

1438878198 2015-08-05 Production Wells No Violations The clean up at the site is continuing. The contaminated soils are being removed and a sump has been dug and filled with water to flush the oil out of the sand lense in the soil.
1441158940 2015-09-01 Production Wells No Violations Met Mark Abdella and Trish Cartmell. The contaminated stockpile was not on site and it was possible to see where the company had excavated down to the contaminated sand and gravel lense over the weekend. The hard boom in the creek seems to have been topped by a small amount of contaminate and has moved down stream a bit but is being held by the soft booms in place. There still appears to be some contamination leaching from the soil along the bank. We spoke with Aaron Wolfe with OEPA over the phone to get an idea of his questions and concerns about the clean up in the creek itself. He was fine with allowing the small amount of contaminate to leach through the bank and into the creek as long as the booms were being maintained. The contaminated sand and gravel lense under the stock pile area will be excavated and taken to an EPA approved landfill.
1441299066 2015-09-02 Production Wells No Violations I stopped by the site to check the booms and pads in the creek. The Water authority is locating the water line that runs through the site.
1441906362 2015-09-04 Production Wells No Violations Cleaning oil from water and changing out booms and pads.
1441996761 2015-09-11 Production Wells No Violations Booms and pads in place. Oil still leaching from sand and gravel lense in creek bed.
1442921895 2015-09-21 Production Wells No Violations Met Mark Abdella at wellsite to review clean up and discuss placement of new tank battery.
153695203 2015-9-1 0:00:0 PW No Violations 1.00
1586754927 2015-10-01 Production Wells No Violations Met Trish Cartmell and Aaron Wolfe of OEPA at site to review clean up. There is still a small amount of oil leaching from the streambed. The hard boom was in place although the soft booms had been dislodged because of a severe rain event the night before. The clean up will continue as planned.
1722867845 2015-08-06 Production Wells No Violations The large sump has been emptied and has been backfilled. There does not appear to be any oil leaching through sand lenses into the creek. The booms and pads are in place and collecting small amounts of contamination effectively. The contaminated soil stock pile is still onsite and the are under the pile still needs to be excavated.
1814953188 2015-08-31 Production Wells No Violations Met Mark Abdella and Trish Cartmell on site to discuss clean up. Booms and pads still in place, the stockpile has been removed and a small excavated area underneigth revealed there is still more soil to remove. The sumps will be widened and booms will be replaced.
1843578183 2015-08-11 Production Wells No Violations Met Aaron Wolfe of OEPA and Mark Abdella of PDQ to review clean up at the site. The small sumps I dug had filled with oil and there appeared to still be contamination leaching from the soil towards the creek bed. The booms and pads were replaced and repositioned. A large rain event had washed out the syphon dam but a boom downstream had captured any contamination lost in the event. We discussed removing the syphon dam later today.
1850895429 2015-08-17 Production Wells No Violations The soil stockpile remains on site. The company is waiting to hear from the landfill regarding TENORM testing requirements. Booms in place.
202563696 2015-8-10 0:00: PW No Violations 2.50
2139580554 2015-09-14 Production Wells No Violations Booms and pads in place, the sumps are collecting oil from the sand lenses.
23454439 2015-8-4 0:00:0 PW No Violations 4.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1438616871 US-OH-112689 2015-10-19 Well operation causing pollution and contamination

For data sources see[9]

References