Well ID: 34-009-21597 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.31,"lon":-81.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Athens | |
Municipality: Rome Township | |
Operator Name: PDQ OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: MATHENY DONZEL | |
License Status: Producing | |
License Date: 1966-04-14 | |
Spud Date: 1966-04-19 | |
Spud Drilling Contractor: | |
Final Drill Date: 1966-05-19 | |
Well Total Depth: 1629.00 ft | |
Configuration: Vertical | |
Latitude: 39.310000 | |
Longitude: -81.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1966-04-19 | |
Completed | 1966-05-19 | |
Reached Total Depth | 1966-05-19 | |
Completion Report Received | 1966-06-10 | |
Change of Owner | 2001-05-07 | Operator changed from 1395, BEARDMORE OIL & GAS CO to 6986, C & N OIL & GAS COMPANY |
Change of Owner | 2012-10-02 | Operator changed from 6986, C & N OIL & GAS COMPANY to 9038, PDQ OIL & GAS LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-03-10 | 1586 | 1588 | 8 |
1586 | 1588 | 8 | |
1586 | 1588 | 8 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2000 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1999 | BEARDMORE OIL & GAS CO | 0.00 | 0.00 | 365 |
2000 | BEARDMORE OIL & GAS CO | 0.00 | 0.00 | 365 |
2001 | C & N OIL & GAS COMPANY | 0.00 | 25.00 | 306 |
2002 | C & N OIL & GAS COMPANY | 0.00 | 52.00 | 365 |
2003 | C & N OIL & GAS COMPANY | 0.00 | 32.00 | 365 |
2004 | C & N OIL & GAS COMPANY | 0.00 | 27.00 | 365 |
2005 | C & N OIL & GAS COMPANY | 0.00 | 0.00 | 365 |
2006 | C & N OIL & GAS COMPANY | 0.00 | 0.00 | 365 |
2007 | C & N OIL & GAS | 0.00 | 29.00 | 365 |
2008 | C & N OIL & GAS COMPANY | 0.00 | 0.00 | 365 |
2009 | C & N OIL & GAS COMPANY | 0.00 | 0.00 | 365 |
2010 | C & N OIL & GAS COMPANY | 0.00 | 48.00 | 365 |
2011 | C & N OIL & GAS COMPANY | 0.00 | 19.00 | 365 |
2012 | PDQ OIL & GAS LLC | 0.00 | 0.00 | 63 |
2013 | PDQ OIL & GAS LLC | 0.00 | 41.00 | 365 |
2014 | PDQ OIL & GAS LLC | 0.00 | 164.00 | 365 |
2015 | PDQ OIL & GAS LLC | 0.00 | 56.00 | 365 |
2016 | PDQ OIL & GAS LLC | 0.00 | 108.00 | 365 |
2017 | PDQ OIL & GAS LLC | 0.00 | 94.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1999 | BEARDMORE OIL & GAS CO | Brine | 0 | 365 |
2000 | BEARDMORE OIL & GAS CO | Brine | 0 | 365 |
2001 | C & N OIL & GAS COMPANY | Brine | 0 | 306 |
2002 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2003 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2004 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2005 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2006 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2007 | C & N OIL & GAS | Brine | 1 | 365 |
2008 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2009 | C & N OIL & GAS COMPANY | Brine | 0 | 365 |
2010 | C & N OIL & GAS COMPANY | Brine | 1 | 365 |
2011 | C & N OIL & GAS COMPANY | Brine | 1 | 365 |
2012 | PDQ OIL & GAS LLC | Brine | 0 | 63 |
2013 | PDQ OIL & GAS LLC | Brine | 7 | 365 |
2014 | PDQ OIL & GAS LLC | Brine | 12 | 365 |
2015 | PDQ OIL & GAS LLC | Brine | 9 | 365 |
2016 | PDQ OIL & GAS LLC | Brine | 12 | 365 |
2017 | PDQ OIL & GAS LLC | Brine | 10 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1104263872 | 2015-11-25 0:00 | PW | No Violations | 3.00 |
-1112370279 | 2015-11-3 0:00: | PW | No Violations | 0.20 |
-1154042855 | 2015-9-9 0:00:0 | PW | No Violations | 2.00 |
-117679592 | 2015-10-14 0:00 | AM | No Violations | 1.00 |
-1268309133 | 2015-9-3 0:00:0 | PW | No Violations | 1.50 |
-1327410359 | 2015-10-13 0:00 | PW | No Violations | 1.00 |
-1586754927 | 2015-10-1 0:00: | PW | No Violations | 1.50 |
-1814953188 | 2015-8-31 0:00: | PW | No Violations | 1.50 |
-2139580554 | 2015-9-14 0:00: | PW | No Violations | 0.20 |
-230893092 | 2015-8-3 0:00:0 | PW | No Violations | 9.00 |
-371448547 | 2015-9-16 0:00: | PW | No Violations | 0.30 |
-418530717 | 2015-10-13 0:00 | PW | No Violations | 1.00 |
0023454439 | 2015-08-04 | Production Wells | No Violations | |
0117679592 | 2015-10-14 | Administrative Inspection | No Violations | I received a phone call from Josh Garland letting me know the violations have been resolved and I could write it off on my end. |
0153695203 | 2015-09-01 | Production Wells | No Violations | I left the site to follow up on other notices and left Trish Cartmell to witness the removal of the contaminated sand and gravel lense. When I returned the roll off box was gone and the area had all of the top soil replaced. I confirmed with Trish the company had removed all of the contaminated sand and gravel lense and taken it to a land fill. They then replaced the topsoil. The area still needs to be graded and have vegetative cover established. |
0202563696 | 2015-08-10 | Production Wells | No Violations | Booms and pads in places. Contamination leaching from sand lense into creek. Small test sumps dug in this area to gain a feel for extent of flow. The syphon dam appears to be in good working condition at the end of the site 39. 30995 -81. 92360. |
0230893092 | 2015-08-03 | Production Wells | No Violations | |
0371448547 | 2015-09-16 | Production Wells | No Violations | Booms and pads in place. |
0418530717 | 2015-10-13 | Production Wells | No Violations | Company has constructed a new dike and set a steel 100 Bbl tank. The contaminated soils along the creek bed have been removed and there is no longer any free standing product. The EPA has placed hard booms below the culvert but will remove them at their convenience. The area has been seeded and mulched and vegetative cover has been reestablished. Close violation. |
1020950396 | 2015-08-11 | Production Wells | No Violations | Met Trish Cartmell of ODNR emergency response and viewed the site. The syphon dam had been removed by this point. |
1104263872 | 2015-11-25 | Production Wells | No Violations | Meet Aaron Wolfe of OEPA and Trish Cartmell of ODNR Emergency Response to review clean up of spill. |
1112370279 | 2015-11-03 | Production Wells | No Violations | The EPAs hard booms are still in place, there is no sheen on the waters surface but there is a slight film. |
1154042855 | 2015-09-09 | Production Wells | No Violations | Booms and pads in place, the sumps are showing more oil is still leaching out of the contaminated creek bank. |
1268309133 | 2015-09-03 | Production Wells | No Violations | Stopped by site to check booms and pads. The water line has been clearly marked so the company may make a better decision about where to place the new tank battery. |
1327410359 | 2015-10-13 | Production Wells | No Violations | Met emergency response manager at site to review clean up and discuss closing violation. |
1438616871 | 2015-08-02 | Production Wells | Violations Noted | Got called by Kip Thompson about a spill in Athens County. Mark Hines contacted him about it. He is cleaning up the job for the owner. I will be heading out there asap. It is 8:30 Sunday night.
I arrived on the site shortly after 10pm. Mark Hines has 2 workers with him doing the cleanup. The estimated loss from measuring the tank is 23bbl. I talked with the owner of the well and he thinks they got it contained at its furthest point. Barry Bowers arrived shortly after I did with his water truck. The tank is being emptied at this time. They are planning on sucking the pools of oil out of the creek. They have diapers and booms spread throughout the contaminated area to soak up what they can. I will send an update in the morning. |
1438725182 | 2015-08-03 | Production Wells | No Violations | 8:00 am: I arrived on location to relieve Inspector Justin Smith. Upon arrival, Mark Hines and Mark Abdella were using two track hoes to finish up soil excavation from underneath the tank pad location. All contaminated soil has been stockpiled on pit liner material and covered until it can be hauled away for disposal. A hard boom and underflow dam was installed in the creek approximately 1/3 mile downstream from the spill origin, no fluid was being released from the underflow dam as of yet, but likely will if a rain event occurs. Booms and oil absorbent pads are in the creek in several spots beyond the underflow dam to catch any product that gets past. Huffman-Bowers has two vac-trucks on location and are recovering oil from two temporary pooling/collection areas in the creek. SW Region ER Manager Trisha Cartmell arrived on location at 9:30 am and remained there to direct cleanup upon my departure. As I was leaving, one vac-truck was preparing to dump a load of water in the creek to flush free product to a common collection point where the other vac-truck could recover it. I will stop by this location again on my way home to check cleanup status.
3:30 pm: Back on location to check progress of cleanup. Mark Abdella of PDQ O&G was using a track hoe to remove oily round straw bales from the creek and placing them in a roll-off box. Huffman- |
1438878198 | 2015-08-05 | Production Wells | No Violations | The clean up at the site is continuing. The contaminated soils are being removed and a sump has been dug and filled with water to flush the oil out of the sand lense in the soil. |
1441158940 | 2015-09-01 | Production Wells | No Violations | Met Mark Abdella and Trish Cartmell. The contaminated stockpile was not on site and it was possible to see where the company had excavated down to the contaminated sand and gravel lense over the weekend. The hard boom in the creek seems to have been topped by a small amount of contaminate and has moved down stream a bit but is being held by the soft booms in place. There still appears to be some contamination leaching from the soil along the bank. We spoke with Aaron Wolfe with OEPA over the phone to get an idea of his questions and concerns about the clean up in the creek itself. He was fine with allowing the small amount of contaminate to leach through the bank and into the creek as long as the booms were being maintained. The contaminated sand and gravel lense under the stock pile area will be excavated and taken to an EPA approved landfill. |
1441299066 | 2015-09-02 | Production Wells | No Violations | I stopped by the site to check the booms and pads in the creek. The Water authority is locating the water line that runs through the site. |
1441906362 | 2015-09-04 | Production Wells | No Violations | Cleaning oil from water and changing out booms and pads. |
1441996761 | 2015-09-11 | Production Wells | No Violations | Booms and pads in place. Oil still leaching from sand and gravel lense in creek bed. |
1442921895 | 2015-09-21 | Production Wells | No Violations | Met Mark Abdella at wellsite to review clean up and discuss placement of new tank battery. |
153695203 | 2015-9-1 0:00:0 | PW | No Violations | 1.00 |
1586754927 | 2015-10-01 | Production Wells | No Violations | Met Trish Cartmell and Aaron Wolfe of OEPA at site to review clean up. There is still a small amount of oil leaching from the streambed. The hard boom was in place although the soft booms had been dislodged because of a severe rain event the night before. The clean up will continue as planned. |
1722867845 | 2015-08-06 | Production Wells | No Violations | The large sump has been emptied and has been backfilled. There does not appear to be any oil leaching through sand lenses into the creek. The booms and pads are in place and collecting small amounts of contamination effectively. The contaminated soil stock pile is still onsite and the are under the pile still needs to be excavated. |
1814953188 | 2015-08-31 | Production Wells | No Violations | Met Mark Abdella and Trish Cartmell on site to discuss clean up. Booms and pads still in place, the stockpile has been removed and a small excavated area underneigth revealed there is still more soil to remove. The sumps will be widened and booms will be replaced. |
1843578183 | 2015-08-11 | Production Wells | No Violations | Met Aaron Wolfe of OEPA and Mark Abdella of PDQ to review clean up at the site. The small sumps I dug had filled with oil and there appeared to still be contamination leaching from the soil towards the creek bed. The booms and pads were replaced and repositioned. A large rain event had washed out the syphon dam but a boom downstream had captured any contamination lost in the event. We discussed removing the syphon dam later today. |
1850895429 | 2015-08-17 | Production Wells | No Violations | The soil stockpile remains on site. The company is waiting to hear from the landfill regarding TENORM testing requirements. Booms in place. |
202563696 | 2015-8-10 0:00: | PW | No Violations | 2.50 |
2139580554 | 2015-09-14 | Production Wells | No Violations | Booms and pads in place, the sumps are collecting oil from the sand lenses. |
23454439 | 2015-8-4 0:00:0 | PW | No Violations | 4.50 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1438616871 | US-OH-112689 | 2015-10-19 | Well operation causing pollution and contamination |
For data sources see[9]