If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-007-24561 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.53,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Colebrook Township | |
Operator Name: US ENERGY OH LLC | |
Well Pad ID: | |
Farm/Lease Name: GAAG | |
License Status: Producing | |
License Date: 2017-04-05 | |
Spud Date: 2017-05-04 | |
Spud Drilling Contractor: US ENERGY DRILLING LLC | |
Final Drill Date: 2017-05-22 | |
Well Total Depth: 5888.00 ft | |
Configuration: Horizontal | |
Latitude: 41.530000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-05 | Proposed Formations:CLINTON, Issued Date:4/5/2017, Expired Date:4/5/2019 12:00:00 PM, Drilling unit acres:420.38, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-05-22 | |
Correction to Well | 2017-05-26 | revised plat |
Correction to Well | 2017-09-15 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2019-04-05 | |
Record Last Modified | 2019-06-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-08-03 | 5857 | 0 | |
2017-08-03 | 4260 | 0 | |
5857 | 0 | ||
4260 | 0 | ||
4260 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-07-11 | H2O | 8 | 1340 Bbl | 220 | Reliance Well Service | STAGE 1/17
STAGES 2-16 SEE IMAGES |
2017-07-13 | H2O | 7 | 518 Bbl | 149 | Reliance Well Service | STAGE 17/17
STAGES 2-26 SEE IMAGES |
2017-07-12 | H2O | 0 | 919 Bbl | 22000 | Reliance Well Service |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | US ENERGY OH LLC | 2715.00 | 765.00 | 80 |
2018 | US ENERGY OH LLC | 6964.00 | 2820.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | US ENERGY OH LLC | Brine | 2045 | 80 |
2018 | US ENERGY OH LLC | Brine | 1998 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-101005725 | 2017-6-22 0:00: | CS | No Violations | |
-1122177051 | 2017-5-18 0:00: | DD | No Violations | |
-1688899504 | 2017-5-22 0:00: | DD | No Violations | |
-1754776497 | 2017-7-5 0:00:0 | PW | No Violations | |
-291471777 | 2017-8-28 0:00: | PL | No Violations | |
0101005725 | 2017-06-22 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 4.5 production casing. U S Energy reached a total depth of 5929 MD on the Gaag # 1-H. After lowering 141 joints of 4.5, 11.6# casing with 21 solid body centralizers to 5907 the well was circulated until the fluid was clear. Petroset Cementing Services cemented the casing with 400 sacks of 50/50 Pozmix, 2% gel, 10 % salt. Mix water temp. was 75 F and pH was 7. Four samples of cement slurry were weighed and ranged from 13.8 ppg to 14.0 ppg. The slurry was displaced with 92 barrels of water and plug. The plug landed at 700 psi and was increased to 1200 psi for five (5) minutes. I did not witness any pressure decline. Once release back the casing flowed back .5 barrel and stopped. The float held. No violations. |
0291471777 | 2017-08-28 | Preliminary Restoration | No Violations | I was on the Gaag pad to observe the pit closure. The pit system consisted of four (4) pits, a working and cuttings pit for each well. Petrowater Services ( UIC # 52 ) was the hauler of the pit fluids. Some of the fluid was transported to the Bates pad ( Brookfield Twp., Trumbull Cty. ) for use in the stimulation of those wells. The remainder fluid was disposed at the Shalelogic facility in New Lyme Twp., Ashtabula Cty. U S Energy was the contractor for the closing of the pits. After the pits were emptied the cuttings were equalized among the four (4) pits allowing the cuttings to be encapsulated at approximately eight (8) feet below grade. No violations identified during this inspection. |
0942931411 | 2017-09-18 | Production Wells | No Violations | Moore Well Service was removing the 2.375 tubing to clean the 4.5 casing free of sand and debris. Once the casing is clear Moore will replace the tubing and run sucker rods to complete as a pumping well. |
1039585609 | 2017-05-11 | Drill / Deepen / Reopen | No Violations | I was on site to witness the pressure test on the BOP. The company pressured up on the drill stem annulus to 360 psi then shut-in the annulus. They held the pressure for 15 minutes with no loss of pressure. The test passed. |
1122177051 | 2017-05-18 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig drilling in the horizontal portion of the well at a depth of 4242 feet. |
1150121366 | 2017-07-10 | Production Wells | No Violations | I was on location to check the status of the frac preparations for the Gaag # 1 well. The stimulation contractor was Reliance Well Services. Sure Shot Wireline was the contractor for perforating guns and plugs. The well was scheduled for 17 stages ( 100 length ), five (5) clusters of 10 shots each per stage. No violations identified during this inspection. |
1212607336 | 2017-05-10 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig drilling at 3420 feet. |
1235902422 | 2017-05-15 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig starting to run the drill stem into the well to begin drilling the main hole. |
1497270371 | 2017-05-04 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig was preparing to spud in the well. |
1499344387 | 2017-06-28 | Drill / Deepen / Reopen | No Violations | I performed a site inspection on this location. They are preparing to frac the well. There is ten 500 barrel frac tanks and various pieces of equipment on location. The pits are in good condition with ample room before over flowing. Location is well maintained and clean. |
1666671989 | 2017-09-26 | Production Wells | No Violations | Moore Well Service was on location to install the 2.375 tubing and .75 sucker rods in the Gaag # 1H. The access road and well pad was rocked and accessible. The disturbed area where the drilling pits previously existed was planted with oats and was beginning to grow. The 210 barrel stock tanks were properly identified. No violations identified during this inspection. |
1688899504 | 2017-05-22 | Drill / Deepen / Reopen | No Violations | I was on location to witness the cementing of the 4.5 casing. Petroset Cementing was the cementing contractor. They established circulation, they pumped a 30 barrel gel flush follow by 400 sacks of 50/50 poz and displaced to 5862 with 91 barrels of water. Plug landed with 1800 psi. released to tank plug held |
1754776497 | 2017-07-05 | Production Wells | No Violations | The Gaag pad was being configured for completion activities. Eleven (11) 500 barrel frac tanks were spotted on location. Ten (10) tanks were for frac water and one (1) tank to be used as a hydration tank. The pits has sufficient free board since the pit fluid will be the frac fluid. Plan Forward was to begin completion activities the week of 7/10/2017. No violations identified during this inspection. |
2114363634 | 2019-6-3 0:00:0 | PL | No Violations | |
942931411 | 2017-9-18 0:00: | PW | No Violations |
For data sources see[9]