Well Details

Well ID: 34-007-24559
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Colebrook Township
Operator Name: US ENERGY OH LLC
Well Pad ID:
Farm/Lease Name: DUMITRAS UNIT
License Status: Producing
License Date: 2017-02-14
Spud Date: 2017-02-27
Spud Drilling Contractor: US ENERGY DRILLING LLC
Final Drill Date: 2017-04-24
Well Total Depth: 6291.00 ft
Configuration: Horizontal
Latitude: 41.520000
Longitude: -80.720000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-14 Proposed Formations:WHITE CLINTON, Issued Date:2/14/2017, Expired Date:2/14/2019 12:00:00 PM, Drilling unit acres:346.8, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-04-07 UPDATE ACREAGE/DRILL UNIT-ALE
Reached Total Depth 2017-04-24
Correction to Well 2017-05-26 unit size changed
Correction to Well 2017-06-01 UPDATE TARGET/TAKEPOINT-ALE
Construction Permit Expires 2019-02-14
Record Last Modified 2019-06-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-06-06 6190 6250 30
2017-06-06 4590 4653 30
6190 6250 30
4590 4653 30
4590 4653 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-05-18 GEL 8 657 Bbl 0 Reliance Well Service SATGE 1/19

STAGES 2-18 SEE IMAGES

2017-05-21 GEL 8 449 Bbl 0 Reliance Well Service STAGE 19/19

STAGES 2-18 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 US ENERGY OH LLC 2715.00 920.00 74
2018 US ENERGY OH LLC 6964.00 3301.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 US ENERGY OH LLC Brine 2433 74
2018 US ENERGY OH LLC Brine 4441 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1190050035 2017-2-14 0:00: DD No Violations
-1455355513 2017-2-10 0:00: DD No Violations
-153151485 2017-2-21 0:00: DD No Violations
-1615809688 2017-2-6 0:00:0 DD No Violations
-2055853722 2017-8-22 0:00: PL No Violations
-809241710 2017-9-26 0:00: PL No Violations
0109701768 2017-02-27 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was drilling at 42 feet on the conductor bore.
0153151485 2017-02-21 Drill / Deepen / Reopen No Violations I arrived on site to find the road to the wellsite has been rocked and 90 percent of the wellsite has been rocked. A earthen pit has been established at the south-east corner of the wellsite area. There has been a silt fence established on the south and west sides of the wellsite location.
0673413666 2017-10-03 Production Wells No Violations Moore Well Service was lowering .75 inch sucker rods into the 2.375 tubing in order to initiate production. The pump jack was powered with electric. I walked the pad and did not see any contamination or leaks. The seeded area requires additional time for growth and stabilizing prior to qualifying for preliminary restoration classification.
0767424188 2017-02-13 Drill / Deepen / Reopen No Violations I arrived on site to find the company was grading the wellsite area. A silt fence had been established on the south side of the wellsite location.
0809241710 2017-09-26 Preliminary Restoration No Violations Personnel from U S Energy were constructing and positioning the pumping unit on the Dumitras Unit # 2-H well. The well still lacked sucker rods and downhole pump, which were on location. The lease road afforded good access to the stone pad. The tank battery had the I D signage posted. An earthen dike surrounded the tank battery and GPU. Grass was growing on the dike. The load lines were locked. The seeded were starting to grow, but there were bare areas remaining that have yet to fill in. The erosional controls were still in place and effective. I spoke with Cary LeShock concerning the water trucks not having the required U I C registration and told him that brine cannot be haul until the trucks are registered. No violations identified during this inspection.
109701768 2017-2-27 0:00: DD No Violations
1190050035 2017-02-14 Drill / Deepen / Reopen No Violations I arrived on site to find the company was preparing the wellsite for the drilling rig.
1335206521 2017-04-19 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was at a depth of 4142. They were in the process in running a survey of the well bore.
1344219978 2017-02-16 Drill / Deepen / Reopen No Violations I arrived on site to find the company was hauling stone for the lease road.
1403517040 2019-6-3 0:00:0 PW No Violations
1455355513 2017-02-10 Drill / Deepen / Reopen No Violations I arrived on site to find company was in the process in removing the trees from the wellsite area.
1461809129 2017-06-28 Drill / Deepen / Reopen No Violations I performed a site inspection on this location. They are preparing to frac the well. The well are fraced. The pits are in good condition with ample room before over flowing. Location is well maintained and clean.
1496234334 2017-02-09 Drill / Deepen / Reopen No Violations I arrived on site to find company was hauling stone for the entrance to the wellsite.
1503936571 2017-08-28 Preliminary Restoration No Violations I conducted a follow up inspection after being contacted by U S Energy ( Harry) that the requested items for restoration had been completed. My inspection revealed that the disturbed areas had been reseeded and the small brush in the woods was removed. The area requires time to allow vegetation. I will re - inspect this location to assess compliance for preliminary restoration.
1526309086 2018-05-01 Production Wells No Violations The Dumitras 2- H well is equipped with electric pumping well. The tank battery was shared with the Dumitras 1- H well ( 34-007-2-4560 ). The tank battery was comprised of three (3) 210 barrel stock tanks and a Gas Production Unit ( GPU ). The tank pad was surrounded by a earthen dike.
1615809688 2017-02-06 Drill / Deepen / Reopen No Violations I met with Harry Mills and Mark Anderson with U S Energy on site to discuss construction of well site and drilling of a horizontal clinton well in Ashtabula county.
1626707866 2017-04-04 Drill / Deepen / Reopen No Violations I was on site to witness the testing of the BOP. The company pressured up the annulus of the drill stem to 450 psi then shut-in the annulus. They held the pressure for 15 minutes with no loss of pressure. The test passed.
2055853722 2017-08-22 Preliminary Restoration No Violations I inspected this pad for preliminary restoration compliance. Access was gained on a gravel lease road to the stone pad. I found that the tank battery was constructed, the disturbed areas were graded and seeded. The electric service for the pumping units was installed. The tank battery consisted of three (3) - 210 barrel stock tanks and one - (1) Gas Production Unit ( GPU ). The tank battery was surrounded with an earthen dike which was seeded and strawed. The GPU was diked. There was one (1) 500 barrel frac tank that needed to be removed from location. The disturbed areas had spotty vegetative growth and would require reseeding east and south of the tank battery. There was small brush in the woods that requires removal and placement with the rest of the brush previously stockpiled. I will speak with U S Energy to resolve. Preliminary Restoration was not passed during this inspection.
2147315544 2017-04-07 Drill / Deepen / Reopen No Violations I was on site to witness the testing of the pipe rams and the blind rams. The company pressured up on the annulus of the drill stem to 400 psi. They then closed in the annulus. They held the pressure for 15 minutes with no loss of pressure. The test passed.
673413666 2017-10-3 0:00: PW No Violations
767424188 2017-2-13 0:00: DD No Violations

For data sources see[9]