X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-007-20926

Well Details

Well ID: 34-007-20926
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Monroe Township
Operator Name: CLARENCE K TUSSEL JR LTD
Well Pad ID:
Farm/Lease Name: DELL VERNON W JR& BETTY A
License Status: Producing
License Date: 1978-05-17
Spud Date: 1978-06-13
Spud Drilling Contractor:
Final Drill Date: 1978-09-27
Well Total Depth: 3249.00 ft
Configuration: Vertical
Latitude: 41.880000
Longitude: -80.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1978-05-17 12 TUSSELL CLARENCE JR GeoDate 5/17/78
Original Spud 1978-06-13
Completed 1978-09-27
Reached Total Depth 1978-09-27
Record Last Modified 2013-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3080 3143 0
3080 3143 0
3080 3143 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1680 Bbl 57500

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR 5363.00 0.00 0
1986 TUSSEL CLARENCE JR 6634.00 0.00 365
1987 TUSSEL CLARENCE JR 6190.00 0.00 365
1988 TUSSEL CLARENCE JR 6073.00 55.00 365
1990 TUSSEL CLARENCE JR 6238.00 0.00 365
1991 TUSSEL CLARENCE JR 5179.00 0.00 365
1992 TUSSEL CLARENCE JR 4701.00 0.00 365
1993 TUSSEL CLARENCE JR 5110.00 0.00 365
1995 TUSSEL CLARENCE JR 3303.00 0.00 365
1996 TUSSEL CLARENCE JR 1698.00 35.00 365
1997 TUSSEL CLARENCE JR 1360.00 0.00 365
1998 TUSSEL CLARENCE JR 4647.00 0.00 365
1999 TUSSEL CLARENCE JR 3668.00 0.00 365
2000 TUSSEL CLARENCE JR 4582.00 0.00 365
2001 TUSSEL CLARENCE JR 4376.00 35.00 365
2002 TUSSEL CLARENCE JR 4527.00 0.00 365
2003 TUSSEL CLARENCE JR 5016.00 0.00 365
2004 TUSSEL CLARENCE JR 4437.00 0.00 365
2005 TUSSEL CLARENCE JR 3879.00 0.00 365
2006 TUSSEL CLARENCE JR 5632.00 0.00 365
2007 TUSSEL CLARENCE JR 5512.00 0.00 365
2008 TUSSEL CLARENCE JR 5393.00 0.00 365
2009 TUSSEL CLARENCE JR 5334.00 0.00 365
2010 TUSSEL CLARENCE JR 5739.00 0.00 365
2011 TUSSEL CLARENCE JR 5299.00 0.00 365
2012 TUSSEL CLARENCE JR 4022.00 0.00 366
2013 TUSSEL CLARENCE JR 2561.00 0.00 365
2014 TUSSEL CLARENCE JR 2379.00 0.00 365
2015 TUSSEL CLARENCE JR 2327.00 0.00 365
2016 TUSSEL CLARENCE JR 1913.00 0.00 365
2017 TUSSEL CLARENCE JR 2818.00 0.00 365
2018 TUSSEL CLARENCE JR 2361.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR Brine 90 0
1986 TUSSEL CLARENCE JR Brine 206 365
1987 TUSSEL CLARENCE JR Brine 90 365
1988 TUSSEL CLARENCE JR Brine 130 365
1990 TUSSEL CLARENCE JR Brine 81 365
1991 TUSSEL CLARENCE JR Brine 0 365
1992 TUSSEL CLARENCE JR Brine 0 365
1993 TUSSEL CLARENCE JR Brine 66 365
1995 TUSSEL CLARENCE JR Brine 80 365
1996 TUSSEL CLARENCE JR Brine 45 365
1997 TUSSEL CLARENCE JR Brine 0 365
1998 TUSSEL CLARENCE JR Brine 0 365
1999 TUSSEL CLARENCE JR Brine 98 365
2000 TUSSEL CLARENCE JR Brine 26 365
2001 TUSSEL CLARENCE JR Brine 15 365
2002 TUSSEL CLARENCE JR Brine 0 365
2003 TUSSEL CLARENCE JR Brine 0 365
2004 TUSSEL CLARENCE JR Brine 0 365
2005 TUSSEL CLARENCE JR Brine 0 365
2006 TUSSEL CLARENCE JR Brine 0 365
2007 TUSSEL CLARENCE JR Brine 0 365
2008 TUSSEL CLARENCE JR Brine 0 365
2009 TUSSEL CLARENCE JR Brine 0 365
2010 TUSSEL CLARENCE JR Brine 0 365
2011 TUSSEL CLARENCE JR Brine 0 365
2012 TUSSEL CLARENCE JR Brine 0 366
2013 TUSSEL CLARENCE JR Brine 0 365
2014 TUSSEL CLARENCE JR Brine 0 365
2015 TUSSEL CLARENCE JR Brine 0 365
2016 TUSSEL CLARENCE JR Brine 0 365
2017 TUSSEL CLARENCE JR Brine 0 365
2018 TUSSEL CLARENCE JR Brine 0 365

For data sources see[7] [8]

References