If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-007-20070 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.84,"lon":-80.56,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashtabula | |
| Municipality: Monroe Township | |
| Operator Name: CLARENCE K TUSSEL JR LTD | |
| Well Pad ID: | |
| Farm/Lease Name: TINKER KENNETH | |
| License Status: Producing | |
| License Date: 1959-07-17 | |
| Spud Date: 1959-07-15 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1959-09-10 | |
| Well Total Depth: 3389.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.840000 | |
| Longitude: -80.560000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Original Spud | 1959-07-15 | |
| Completed | 1959-09-10 | |
| Reached Total Depth | 1959-09-10 | |
| Record Last Modified | 2013-10-03 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3273 | 3277 | 0 |
| 3273 | 3277 | 0 | |
| 3273 | 3277 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 0 | 0 | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | TUSSEL CLARENCE JR | 3391.00 | 0.00 | 0 |
| 1986 | TUSSEL CLARENCE JR | 2598.00 | 40.00 | 365 |
| 1987 | TUSSEL CLARENCE JR | 3779.00 | 52.00 | 365 |
| 1990 | TUSSEL CLARENCE JR | 638.00 | 61.00 | 365 |
| 1991 | TUSSEL CLARENCE JR | 3158.00 | 55.00 | 365 |
| 1992 | TUSSEL CLARENCE JR | 3147.00 | 55.00 | 365 |
| 1993 | TUSSEL CLARENCE JR | 3096.00 | 75.00 | 365 |
| 1995 | TUSSEL CLARENCE JR | 3191.00 | 69.00 | 365 |
| 1996 | TUSSEL CLARENCE JR | 2668.00 | 59.00 | 365 |
| 1997 | TUSSEL CLARENCE JR | 2901.00 | 0.00 | 365 |
| 1998 | TUSSEL CLARENCE JR | 3336.00 | 84.00 | 365 |
| 1999 | TUSSEL CLARENCE JR | 3175.00 | 44.00 | 365 |
| 2000 | TUSSEL CLARENCE JR | 3326.00 | 0.00 | 365 |
| 2001 | TUSSEL CLARENCE JR | 3708.00 | 74.00 | 365 |
| 2002 | TUSSEL CLARENCE JR | 3656.00 | 0.00 | 365 |
| 2003 | TUSSEL CLARENCE JR | 3945.00 | 41.00 | 365 |
| 2004 | TUSSEL CLARENCE JR | 3874.00 | 0.00 | 365 |
| 2005 | TUSSEL CLARENCE JR | 3867.00 | 0.00 | 365 |
| 2006 | TUSSEL CLARENCE JR | 3863.00 | 0.00 | 365 |
| 2007 | TUSSEL CLARENCE JR | 3843.00 | 0.00 | 365 |
| 2008 | TUSSEL CLARENCE JR | 3830.00 | 36.00 | 365 |
| 2009 | TUSSEL CLARENCE JR | 2865.00 | 29.00 | 365 |
| 2010 | TUSSEL CLARENCE JR | 3752.00 | 0.00 | 365 |
| 2011 | TUSSEL CLARENCE JR | 3725.00 | 0.00 | 365 |
| 2012 | TUSSEL CLARENCE JR | 3162.00 | 0.00 | 366 |
| 2013 | TUSSEL CLARENCE JR | 2752.00 | 0.00 | 365 |
| 2014 | TUSSEL CLARENCE JR | 2342.00 | 36.00 | 365 |
| 2015 | TUSSEL CLARENCE JR | 2580.00 | 0.00 | 365 |
| 2016 | TUSSEL CLARENCE JR | 2554.00 | 17.00 | 365 |
| 2017 | TUSSEL CLARENCE JR | 2398.00 | 0.00 | 365 |
| 2018 | TUSSEL CLARENCE JR | 2249.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | TUSSEL CLARENCE JR | Brine | 859 | 0 |
| 1986 | TUSSEL CLARENCE JR | Brine | 675 | 365 |
| 1987 | TUSSEL CLARENCE JR | Brine | 656 | 365 |
| 1990 | TUSSEL CLARENCE JR | Brine | 788 | 365 |
| 1991 | TUSSEL CLARENCE JR | Brine | 677 | 365 |
| 1992 | TUSSEL CLARENCE JR | Brine | 530 | 365 |
| 1993 | TUSSEL CLARENCE JR | Brine | 548 | 365 |
| 1995 | TUSSEL CLARENCE JR | Brine | 375 | 365 |
| 1996 | TUSSEL CLARENCE JR | Brine | 573 | 365 |
| 1997 | TUSSEL CLARENCE JR | Brine | 534 | 365 |
| 1998 | TUSSEL CLARENCE JR | Brine | 450 | 365 |
| 1999 | TUSSEL CLARENCE JR | Brine | 335 | 365 |
| 2000 | TUSSEL CLARENCE JR | Brine | 395 | 365 |
| 2001 | TUSSEL CLARENCE JR | Brine | 408 | 365 |
| 2002 | TUSSEL CLARENCE JR | Brine | 437 | 365 |
| 2003 | TUSSEL CLARENCE JR | Brine | 411 | 365 |
| 2004 | TUSSEL CLARENCE JR | Brine | 376 | 365 |
| 2005 | TUSSEL CLARENCE JR | Brine | 444 | 365 |
| 2006 | TUSSEL CLARENCE JR | Brine | 446 | 365 |
| 2007 | TUSSEL CLARENCE JR | Brine | 380 | 365 |
| 2008 | TUSSEL CLARENCE JR | Brine | 340 | 365 |
| 2009 | TUSSEL CLARENCE JR | Brine | 223 | 365 |
| 2010 | TUSSEL CLARENCE JR | Brine | 302 | 365 |
| 2011 | TUSSEL CLARENCE JR | Brine | 255 | 365 |
| 2012 | TUSSEL CLARENCE JR | Brine | 285 | 366 |
| 2013 | TUSSEL CLARENCE JR | Brine | 370 | 365 |
| 2014 | TUSSEL CLARENCE JR | Brine | 335 | 365 |
| 2015 | TUSSEL CLARENCE JR | Brine | 252 | 365 |
| 2016 | TUSSEL CLARENCE JR | Brine | 416 | 365 |
| 2017 | TUSSEL CLARENCE JR | Brine | 334 | 365 |
| 2018 | TUSSEL CLARENCE JR | Brine | 280 | 365 |