34-005-24192

Well Details

Well ID: 34-005-24192
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Mifflin Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: RHEA E HARTMAN ET VIR
License Status: Storage Well
License Date: 2016-10-03
Spud Date: 2016-10-12
Spud Drilling Contractor: H A D INC
Final Drill Date: 2016-11-28
Well Total Depth: 5828.00 ft
Configuration: Horizontal
Latitude: 40.810000
Longitude: -82.380000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-10-03 Proposed Formations:CLINTON SANDSTONE, Issued Date:10/3/2016, Expired Date:10/3/2018 12:00:00 PM, Drilling unit acres:141, Proposed Well Type:SO, Proposed Well Class:STOR
Reached Total Depth 2016-11-28
Completion Report Received 2017-07-18
Correction to Well 2017-08-25 UPDATE TAKE TARGET AS-DRILLED PLAT ALE
Record Last Modified 2017-11-14
Construction Permit Expires 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-07 3010 3030 120
2017-08-07 5717 5737 120
5717 5737 120
3010 3030 120
3010 3030 120

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-12-12 H2O 0 519 Bbl 30128 Reliance Well Service Reliance Well Service pumped all stages of the stimulation job for Columbia Gas. The job utilized 16/30 sand and cross linked fresh water gel. Acid was spotted at each stage prior to perforating. Key Energy Services coil tubing rig set bridge plugs and perforated the intervals. The coil rig was also used to clean the production casing following screen outs. Stages 1 and 6 were witnessed. Stages 2 through 5 and 7 were not observed during pumping. No problems were observed. For all stages,
2016-12-15 H2O 0 473 Bbl 26461 Reliance Well Service This stage was not witnessed. The job was pumped at 2:30 AM.
2016-12-13 H2O 0 495 Bbl 29128 Reliance Well Service This stage was not witnessed. The job was pumped at about 11:30 PM. The well screened out and had to be cleaned out by the coil rig.
2016-12-14 H2O 0 503 Bbl 26220 Reliance Well Service This stage was not witnessed. The job was pumped about 7 PM. This stage did not screen out.
2016-12-13 H2O 0 421 Bbl 23680 Reliance Well Service Stage 2 was pumped at 2 am and was not witnessed. Stage 1 screened out and the job was delayed waiting on the coil rig to clean out the well and set the bridge plug.
2016-12-16 H2O 0 450 Bbl 26048 Reliance Well Service This stage was not witnessed. The stage was completed at 12:02 AM.
2016-12-15 H2O 0 468 Bbl 26208 Reliance Well Service This stage was witnessed. No problems observed.

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1150399302 2017-12-11 0:00 SO No Violations
-1393552605 2016-11-6 0:00: DD No Violations
-1485126863 2016-12-12 0:00 DD No Violations 6.00
-525095040 2017-10-6 0:00: SO No Violations
-531012443 2016-11-10 0:00 DD No Violations 1.50
-547815140 2017-1-31 0:00: DD No Violations 1.00
-558794282 2017-1-17 0:00: DD No Violations 1.00
-622476938 2016-10-25 0:00 DD No Violations 0.50
-868717549 2017-9-20 0:00: SO No Violations
-90029557 2016-12-14 0:00 DD No Violations 0.50
0089547365 2016-10-13 Drill / Deepen / Reopen No Violations HAD is drilling and installing conductor casing with a dual rotary rig.
0090029557 2016-12-14 Drill / Deepen / Reopen No Violations The operator is conducting fracture stimulation of the well. 3 of 7 stages have been completed. Key Energy Service coil tubing rig is on the well. The bridge plug has been set and they are preparing to perforate the fourth stage.
0129328880 2017-02-23 Drill / Deepen / Reopen No Violations The well is shut in. ID is posted at the well. Columbia personnel were on location loading up pipeline maintenance equipment.
0178390134 2019-03-11 Storage Well No Violations Performed annual inspection for Columbia Gas Storage Well #12595 on 03/11/2019. The well is equipped with a flanged wellhead with 1-master valve and 3-wing valves, and a drip. Well identification is clearly displayed. No problems were noted at the time of the inspection.
0350487323 2016-10-14 Drill / Deepen / Reopen No Violations HAD moved the drilling rig off location. Support equipment was being hauled out. The conductor hole is completed.
0461326742 2016-11-01 Drill / Deepen / Reopen No Violations HAD Drilling has rigged up and they are preparing to drill surface hole. Driling will be done on fluid.
0525095040 2017-10-06 Storage Well No Violations The location is being prepared for drilling a second well on the pad. Excavating equipment and portable tanks are on site. A tin horn is on site. No personnel working at this time.
0531012443 2016-11-10 Drill / Deepen / Reopen No Violations HAD Drilling is drilling on fluid at 800 feet. Intermediate casing cement is planned for Saturday, 11/12/16.
0547815140 2017-01-31 Drill / Deepen / Reopen No Violations The well has been painted. All drilling equipment has been removed from the location. Gravel parking areas remain. The liner installed on the location for drilling remains and sediment controls remain. The well is shut in and has not been connected to the pipeline yet. Columbia is waiting until warm weather to tie the well in because they may need to shut the line down, which they dont want to do during the heating season. ID is posted at the well.
0558794282 2017-01-17 Drill / Deepen / Reopen No Violations There was no work on the well or surface location during insepection. Company representatives were on site. The well is identified.
0622476938 2016-10-25 Drill / Deepen / Reopen No Violations The excavating contractor is still working on location. Timber mats have been placed for the drilling rig. Soil piles are seeded and mulched. The drill permit is posted at the entrance to the location.
0687649631 2016-11-08 Drill / Deepen / Reopen No Violations The rig crew is rigging up the BOP on the surface casing. The BOP test was delayed due to problems rigging up and was not witnessed. The test occurred after 1 AM and the BOP passed testing.
0868717549 2017-09-20 Storage Well No Violations The well is shut in and identified. Concrete barricades have been installed around the wellhead. Well Service Group is on location installing mud mats and spill containment curbing. The location is being prepared for a drill rig to drill a second well on the pad. The well is not connected to the pipeline yet.
0956547747 2016-11-29 Casing String Witnessed No Violations The operator requested inspection to witness production casing cement. Casing was cemented by C&J Energy Service. No problems were observed. See the casing ticket for details.
1139773971 2017-12-13 Storage Well No Violations Key Energy Services coil tubing is on the well. The well is being acidized.
1150399302 2017-12-11 Storage Well No Violations Hagen Well Service is on the well attempting to retrieve a junk basket and bridge plug. The well was deactivated prior to drilling 2-4195 on the pad. Key Energy Service was unable to fish the basket with a coil tubing rig.
1159782495 2019-02-25 Storage Well No Violations Inspect well, identification is posted. A drip is located in line.
1208239644 2016-10-11 Drill / Deepen / Reopen No Violations HAD Drilling has equipment on location. The excavating contractor is on site building the drilling location.
129328880 2017-2-23 0:00: DD No Violations 0.50
1307916809 2016-11-06 Drill / Deepen / Reopen No Violations The operator requested inspection to witness surface casing cement. The rig was having difficulty running the surface casing pipe. The cement was witnessed later by Tom Benko due to the length of time installation of the pipe was taking.
1393552605 2016-11-06 Drill / Deepen / Reopen No Violations Witness Surface casing cement job for Tom Zacharyasz. Good cement returns.
1476727768 2016-10-17 Drill / Deepen / Reopen No Violations All of the drilling equipment is off location. Timber mats have been placed around the well and a tinhorn has been installed. There is a plate welded on the conductor casing. The excavating contractor is grading the drill location.
1479225128 2016-11-14 Casing String Witnessed No Violations The operator requested inspection to witness cementing the intermediate casing. See the casing ticket for details.
1479744055 2016-11-16 Drill / Deepen / Reopen No Violations HAD drilling has drilled out cement from the intermediate casing. The operator was running a survey on the well bore. They are preparing to start the turn for the horizontal directional phase of drilling.
1480439147 2016-11-28 Drill / Deepen / Reopen No Violations The operator had production casing cement scheduled for 8 AM. Cement was delayed until 1 PM. At noon, the rig was only about halfway through running the production casing in. At 4:30 PM, the rig was still running production casing. The Columbia representative on site indicated that the casing was installing smoothly but it was taking longer than expected. The casing collars had to be torqued and a different power tong service was being used.
1480704834 2016-12-01 Drill / Deepen / Reopen No Violations Some support equipment has been removed from the location. The rig is still on the well.
1481901013 2016-12-15 Drill / Deepen / Reopen No Violations The operator is conducting fracture stimulation of the well. Stages 4 and 5 were completed. Stage 6 was witnessed and completed with no issues. The operator is going to complete stage 7 tonight.
1484072758 2017-01-09 Drill / Deepen / Reopen No Violations The well is equipped with a wellhead and is shut in. WHAN Incorporated is moving mud mats from the drill pad. There was no work on the well during inspection.
1485126863 2016-12-12 Drill / Deepen / Reopen No Violations The operator is conducting fracture stimulation of the well. The first stage was pumped. Key Energy Service has a coil rig on the well. The rig was attempting to set the bridge plug for stage 2. The plug got stuck running in. The plug was recovered and the well was washed out. The plug was successfully ran in and set. By close of business the coil rig had not completed perforating of stage 2. The operator decided they would work 24 hours as opposed to the planned daylights only to get back on schedule.
1486135290 2016-12-08 Drill / Deepen / Reopen No Violations Baker Hughes is on the well running wireline equipment. Hagan Well Service is off location.
1579226475 2017-03-09 Drill / Deepen / Reopen No Violations The well is shut in and identified. The well has not yet been connected to the pipeline. A report was received stating the liner on the pad location was damaged and blown across State Route 603 by strong wind overnight. On arrival there was no debris in the roadway. No damage to the liner was observed and no portions were missing or ripped. There is a black tarp over a stone pile on location. Two vehicle barriers were blown over on location. The barriers were set back up. A second well location is marked on the pad.
1587128631 2020-4-13 0:00: SO No Violations
1637580272 2016-12-13 Drill / Deepen / Reopen No Violations The operator is conducting fracture stimulation of the well. Stage 2 was pumped overnight. The coil rig completed cleanout of the wellbore and was setting the bridge plug for stage 3.
178390134 2019-3-11 0:00: SO No Violations
1799875681 2016-12-05 Drill / Deepen / Reopen No Violations Hagan Well Service is on the well. The rig is running tubing. HAD Drilling has moved off location.
1848607697 2018-03-23 Storage Well No Violations ID is posted. The well has been connected to the pipeline. The well is equipped with a separator. The operator is working on restoring the location. The location is shared with 2-4195. The location has been rough graded and the lease road has been surfaced with limestone. All of the rig mats and liner have been removed. Topsoil remains to be spread on the site.
1885531906 2016-11-15 Drill / Deepen / Reopen No Violations HAD Drilling is preparing to drill out from the intermediate casing. They did not have a correct sub for the drill bit and they are waiting on delivery of the part.
2052252084 2016-11-09 Drill / Deepen / Reopen No Violations HAD Drilling is preparing to drill out cement. A bond log was ran on the surface casing prior to rigging up the BOP.
2059238125 2016-10-12 Drill / Deepen / Reopen No Violations HAD Drilling is rigging up the conductor casing rig. The rig is a dual rotary style. The well will be spudded today or tomorrow.
350487323 2016-10-14 0:00 DD No Violations 1.00
461326742 2016-11-1 0:00: DD No Violations 0.50
687649631 2016-11-8 0:00: DD No Violations 4.00
89547365 2016-10-13 0:00 DD No Violations 1.50
956547747 2016-11-29 0:00 CS No Violations 5.00