If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-005-24153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.83,"lon":-82.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashland | |
| Municipality: Perry Township | |
| Operator Name: FAWN RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: L & S GILBERT(ERP#20) | |
| License Status: Active Injection | |
| License Date: 2010-09-08 | |
| Spud Date: 2010-09-20 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 40.830000 | |
| Longitude: -82.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2010-09-08 | Proposed Formations:BEREA, Issued Date:9/8/2010, Expired Date:9/7/2012 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:EOR, Proposed Well Class:ERP |
| Annulus Pressure Monitoring Approved | 2010-10-13 | |
| Last Compliance Report | 2010-10-13 | |
| Construction Permit Expires | 2012-09-07 | |
| Change of Owner | 2014-08-27 | Operator changed from 8182, MOHICAN RIVER ENERGY HOLDINGS to 9315, FAWN RESOURCES LLC |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-01-04 | 556 | 727 | 0 |
| 556 | 727 | 0 | |
| 556 | 727 | 0 |
For data sources see[3]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1035099381 | 2012-8-13 0:00: | ER | No Violations | |
| -1067528471 | 2018-8-15 0:00: | ER | No Violations | |
| -1149883478 | 2012-11-28 0:00 | ER | No Violations | |
| -1188288712 | 2017-11-9 0:00: | ER | No Violations | |
| -1207323495 | 2014-1-2 0:00:0 | ER | No Violations | |
| -1337354937 | 2019-7-15 0:00: | ER | No Violations | |
| -1470587208 | 2017-6-27 0:00: | ER | No Violations | |
| -1526018496 | 2018-5-4 0:00:0 | ER | No Violations | |
| -1720146388 | 2014-9-9 0:00:0 | ER | No Violations | |
| -1829849309 | 2016-3-7 0:00:0 | ER | No Violations | |
| -1858837669 | 2010-11-5 0:00: | ER | No Violations | 1.00 |
| -266718774 | 2013-10-17 0:00 | ER | No Violations | |
| -278452888 | 2016-5-25 0:00: | ER | No Violations | |
| -282478787 | 2011-4-19 0:00: | PL | No Violations | 0.50 |
| -319240148 | 2015-3-27 0:00: | ER | No Violations | |
| -399257671 | 2015-11-5 0:00: | ER | No Violations | |
| -47716665 | 2019-1-17 0:00: | ER | No Violations | |
| -534476083 | 2012-6-6 0:00:0 | ER | No Violations | |
| -571599753 | 2018-10-17 0:00 | ER | No Violations | |
| -726630400 | 2010-12-30 0:00 | ER | No Violations | 1.00 |
| -743596328 | 2016-9-22 0:00: | ER | No Violations | |
| -758565210 | 2016-11-17 0:00 | ER | No Violations | |
| -936817286 | 2018-5-3 0:00:0 | ER | No Violations | |
| 0256620580 | 2015-07-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is behind corn and is not connected Mini Pressure test of annulus will be conducted at a later date. |
| 0266718774 | 2013-10-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. Threads on annulus tap are going bad. |
| 0275523808 | 2017-08-03 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. There is not injection flow line installed for this well. The tubing pressure is wellhead formation pressure. |
| 0278452888 | 2016-05-25 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in and disconnected. |
| 0282478787 | 2011-04-19 | Preliminary Restoration | No Violations | Preliminary restoration approved. Crop field. |
| 0319240148 | 2015-03-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The operator has not initiated activities to conduct a mechanical integrity test to start injection activities. |
| 0399257671 | 2015-11-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. there are no flow lines to well. |
| 0430895034 | 2019-04-29 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
| 0534476083 | 2012-06-06 | Enhanced Recovery Project | No Violations | Inspect Well. Well is not in production. |
| 0571599753 | 2018-10-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The injection flow line has not been installed for this well. The tubing pressure is wellhead formation pressure. |
| 0583074885 | 2011-11-07 | Enhanced Recovery Project | No Violations | Shut in, no fittings. Well has gas pressure. |
| 0665480496 | 2015-07-01 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. location too wet to conduct MIT. Collect GPS Coordinates. |
| 0692105528 | 2014-12-24 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. |
| 0726630400 | 2010-12-30 | Enhanced Recovery Project | No Violations | Injection well. Shut in on tubing.. Drilling pits have been closed and chisel plowed location. Rain, 35 degrees. |
| 0743596328 | 2016-09-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in and disconnected. |
| 0758565210 | 2016-11-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in and disconnected. |
| 0924949922 | 2012-03-14 | Enhanced Recovery Project | No Violations | Inspect Well. |
| 0936817286 | 2018-05-03 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The injection flow line has not been installed for this well. The tubing pressure is wellhead formation pressure. The brass test valve on the well head tubing is cracked. Fawn Resources LLC is under Chief Order 2017-194, Notice of Material and Substantial Violation for Failure to File Annual Reports in Violation of Ohio Administrative Code 1501:9-5-10 (E) and (F) issued June 21, 2017; Chief Order 2017-319, Failure to Maintain Liability Insurance, Issued September 25, 2017; Chief Order 2017-396, Notice of Material and Substantial Violation for Failure to File Annual Statement of Production in Violation of Ohio Revised Code 1509.11. |
| 0975258077 | 2016-03-17 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. |
| 1013868488 | 2017-05-15 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017. REPORTS RECEIVED 7/5/2017 |
| 1030896171 | 2019-11-21 0:00 | ER | No Violations | |
| 1035099381 | 2012-08-13 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
| 1067528471 | 2018-08-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The injection flow line has not been installed for this well. The tubing pressure is wellhead formation pressure. |
| 1149883478 | 2012-11-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Shut in. |
| 1171733140 | 2018-03-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The injection flow line has not been installed for this well. The tubing pressure is wellhead formation pressure. Fawn Resources LLC is under Chief Order 2017-194, Notice of Material and Substantial Violation for Failure to File Annual Reports in Violation of Ohio Administrative Code 1501:9-5-10 (E) and (F) issued June 21, 2017; Chief Order 2017-319, Failure to Maintain Liability Insurance, Issued September 25, 2017; Chief Order 2017-396, Notice of Material and Substantial Violation for Failure to File Annual Statement of Production in Violation of Ohio Revised Code 1509.11. |
| 1188288712 | 2017-11-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. There is not injection flow line installed for this well. The tubing pressure is wellhead formation pressure. |
| 1207323495 | 2014-01-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Injection System shut down indefinitely. Threads on Annulus 0.25 inch tap are bad. No pressure on annulus. |
| 1208927993 | 2014-04-16 | Production Wells | No Violations | No ID at the well. The well is an injection well in the enhanced recovery field. |
| 1286373718 | 2010-10-06 | Enhanced Recovery Project | No Violations | New injection well. Drilled out cement and packer shoe and lost drill bit. Fish for bit. Log Berea formation. Run 2 7/8 tubing and packer in 5.5 casing, set at 556. Test at minimum 300 psi on annulus when drilling is completed. Cloudy, 50 degrees. |
| 1287498902 | 2010-10-19 | Enhanced Recovery Project | No Violations | Pressure test injection lines @ 205 psi for 15 minutes with 0 psi decline. Solidified drilling pits with 12 tons of lime and fly ash from Chem-Tech. Sun, 35 degrees. |
| 1324899880 | 2017-03-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Inspect well. The well is shut in and disconnected. Tubing pressure is formation pressure. |
| 1335321816 | 2013-02-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Shut in. |
| 1470587208 | 2017-06-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. There is not injection flow line installed for this well. The tubing pressure is formation pressure. |
| 1526018496 | 2018-05-04 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. |
| 1567401687 | 2020-1-17 0:00: | ER | No Violations | |
| 1718711271 | 2013-08-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Shut in and not connected to the injection system. Well is in corn field. |
| 1720146388 | 2014-09-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity. Well is Shut in and is not connected to injection lines. Well under new ownership Identification will be posted. |
| 1829849309 | 2016-03-07 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in and injection flow line has been disconnected. |
| 1858837669 | 2010-11-05 | Enhanced Recovery Project | No Violations | Test injection pressure and annular pressure. Injecting fluid at 160 psi in 2 7/8 tubing. Annular side is reading 400 psi. Rain 40 degrees. |
| 1933469419 | 2013-06-20 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Shut in and not connected to the injection system. |
| 2052630938 | 2011-06-29 | Enhanced Recovery Project | No Violations | Inspect well. Well idle. Anticipated to be plugged. |
| 2110887042 | 2014-04-02 | Enhanced Recovery Project | No Violations | Inspect well. System is shut down and not in operation. Well does not have any production lines connected. The pressure is formation pressure. |
| 256620580 | 2015-7-29 0:00: | ER | No Violations | |
| 264484029 | 2019-4-24 0:00: | ER | No Violations | |
| 275523808 | 2017-8-3 0:00:0 | ER | No Violations | |
| 430895034 | 2019-4-29 0:00: | ER | No Violations | |
| 583074885 | 2011-11-7 0:00: | ER | No Violations | |
| 665480496 | 2015-7-1 0:00:0 | ER | No Violations | |
| 692105528 | 2014-12-24 0:00 | ER | No Violations | |
| 924949922 | 2012-3-14 0:00: | ER | No Violations | |
| 949088774 | 2020-4-14 0:00: | ER | No Violations | |
| 975258077 | 2016-3-17 0:00: | ER | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0430895034 | US-OH-124615 | 2019-05-09 | Failure to file enhanced recovery annual report | |
| 0975258077 | US-OH-131204 | 2016-11-21 | Failure to monitor pressures or volumes/failure to file | |
| 1013868488 | US-OH-100521 | 2017-07-13 | 9-5-10E | Failure to file enhanced recovery annual report |
| 1526018496 | US-OH-114586 | 2018-12-31 | 9-5-10E | Failure to file enhanced recovery annual report |
For data sources see[4]