If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-005-24148 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.83,"lon":-82.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashland | |
| Municipality: Perry Township | |
| Operator Name: FAWN RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: L & S GILBERT(ERP #20) | |
| License Status: Active Injection | |
| License Date: 2010-06-15 | |
| Spud Date: 2010-02-22 | |
| Spud Drilling Contractor: H A D INC | |
| Final Drill Date: 2010-03-03 | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 40.830000 | |
| Longitude: -82.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2010-01-29 | Proposed Formations:BEREA, Issued Date:1/29/2010, Expired Date:1/29/2011 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2010-03-03 | |
| APP | 2010-06-15 | Proposed Formations:BEREA, Issued Date:6/15/2010, Expired Date:6/15/2011 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:EOR, Proposed Well Class:ERP |
| Last Compliance Report | 2010-11-10 | |
| Construction Permit Expires | 2011-06-15 | |
| Change of Owner | 2014-08-27 | Operator changed from 8182, MOHICAN RIVER ENERGY HOLDINGS to 9315, FAWN RESOURCES LLC |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2010-06-16 | 516 | 730 | 0 |
| 516 | 730 | 0 | |
| 516 | 730 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-09-02 | Other Treatment Type | 0 | 600 Gal | 0 | Operator pumped 600 gallons of Gupsolv into well with a pressure washer on a vaccum. The job was not notified or witnessed. |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1082868333 | 2013-2-13 0:00: | ER | No Violations | |
| -1232739091 | 2012-11-28 0:00 | ER | No Violations | |
| -1376771099 | 2015-11-17 0:00 | ER | No Violations | |
| -1391432908 | 2014-4-2 0:00:0 | ER | No Violations | |
| -1576140286 | 2010-12-30 0:00 | ER | No Violations | 1.00 |
| -1708413230 | 2013-6-19 0:00: | ER | No Violations | |
| -1834709134 | 2012-8-13 0:00: | ER | No Violations | |
| -1946917967 | 2019-7-15 0:00: | ER | No Violations | |
| -2093688392 | 2016-11-17 0:00 | ER | No Violations | |
| -2143641567 | 2011-5-10 0:00: | ER | No Violations | 1.00 |
| -238792997 | 2010-7-13 0:00: | ER | No Violations | 1.00 |
| -338709258 | 2018-8-15 0:00: | ER | No Violations | |
| -395738979 | 2011-6-29 0:00: | ER | No Violations | |
| -415580845 | 2015-11-5 0:00: | ER | No Violations | |
| -526532927 | 2020-1-17 0:00: | ER | No Violations | |
| -597665933 | 2014-12-24 0:00 | ER | No Violations | |
| -643913410 | 2013-8-19 0:00: | ER | No Violations | |
| -692743739 | 2012-3-14 0:00: | ER | No Violations | |
| -722487733 | 2015-7-1 0:00:0 | ER | No Violations | |
| -743052361 | 2019-4-24 0:00: | ER | No Violations | |
| -821973130 | 2018-3-15 0:00: | ER | No Violations | |
| -836831347 | 2013-10-17 0:00 | ER | No Violations | |
| -842897186 | 2015-9-2 0:00:0 | AM | No Violations | |
| 0137302595 | 2017-05-15 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017. REPORTS RECEIVED 7/5/2017 |
| 0238792997 | 2010-07-13 | Enhanced Recovery Project | No Violations | Pulled tubing and packer and replaced packer with new Parmaco compression packer. Tested annulus and it held at 360 psi for 15 minutes with 0% decline. |
| 0285836353 | 2015-11-19 | Enhanced Recovery Project | No Violations | Inspect well. Operator installed a flow meter and a pressure transducer on the injection tubing. The readings for this report are collected from the operators equipment. |
| 0338709258 | 2018-08-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. |
| 0395738979 | 2011-06-29 | Enhanced Recovery Project | No Violations | Inspect well. |
| 0415580845 | 2015-11-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0537606114 | 2017-08-03 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The pump house meter indicates 5233.7 barrels of water. The meter is reported in gallons. |
| 0555483133 | 2018-05-03 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Fawn Resources LLC is under Chief Order 2017-194, Notice of Material and Substantial Violation for Failure to File Annual Reports in Violation of Ohio Administrative Code 1501:9-5-10 (E) and (F) issued June 21, 2017; Chief Order 2017-319, Failure to Maintain Liability Insurance, Issued September 25, 2017; Chief Order 2017-396, Notice of Material and Substantial Violation for Failure to File Annual Statement of Production in Violation of Ohio Revised Code 1509.11. |
| 0597665933 | 2014-12-24 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. |
| 0643913410 | 2013-08-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well shut in system is not in operation. |
| 0674652540 | 2012-06-06 | Enhanced Recovery Project | No Violations | Inspect Well. |
| 0692743739 | 2012-03-14 | Enhanced Recovery Project | No Violations | Inspect Well. |
| 0722196879 | 2015-07-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Conducted Mini Pressure test. Pressure held for 15 minutes within parameters. Mechanical integrity form completed. |
| 0722487733 | 2015-07-01 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. location too wet to conduct MIT. Collect GPS Coordinates. |
| 0811432193 | 2014-04-16 | Production Wells | No Violations | The well is equipped with tubing. The well is an injection well on the enhanced recovery project. Mohican River is not operating currently. No ID at the well. The well is located in a shed. |
| 0821973130 | 2018-03-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Fawn Resources LLC is under Chief Order 2017-194, Notice of Material and Substantial Violation for Failure to File Annual Reports in Violation of Ohio Administrative Code 1501:9-5-10 (E) and (F) issued June 21, 2017; Chief Order 2017-319, Failure to Maintain Liability Insurance, Issued September 25, 2017; Chief Order 2017-396, Notice of Material and Substantial Violation for Failure to File Annual Statement of Production in Violation of Ohio Revised Code 1509.11. |
| 0836831347 | 2013-10-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is shut in. |
| 0842897186 | 2015-09-02 | Administrative Inspection | No Violations | Operator acidized the well with 600 gallons of Gypsolv on a vacuum. |
| 0856120161 | 2018-10-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The meter is reported in gallons. |
| 0953826808 | 2014-01-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Injection System shut down indefinitely. Annulus Valve frozen shut. |
| 1025889085 | 2019-04-29 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
| 1082868333 | 2013-02-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1085585713 | 2019-1-17 0:00: | ER | No Violations | |
| 1219628215 | 2014-09-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity. Well is Shut in. Well under new ownership Identification will be posted. |
| 1232739091 | 2012-11-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1238448385 | 2020-4-14 0:00: | ER | No Violations | |
| 1266592026 | 2010-02-19 | Drill / Deepen / Reopen | No Violations | Moving drilling rig in on location. Flood plain area. Will test ground conditions for earthen pits. No equipment operator present. Met with Rod Robison on location. Call inspector before digging pit. Sun, 20 degrees. |
| 1266924628 | 2010-02-22 | Drill / Deepen / Reopen | No Violations | Drilling pit construction. Dug surface pit 8 x 30 x 5 and did not encounter any ground water. Lined pit with 7 mill plastic liner. Pit will be closed when production casing is cemented. Fog, rain, 40 degrees. 1 of mud on location. |
| 1267058421 | 2019-11-21 0:00 | ER | No Violations | |
| 1274705365 | 2010-05-24 | Production Wells | No Violations | Requested by UIC section to inspect site. Well was drilled as a production well. Mohican River wants to convert to injection well for enhanced recovery project. Well is located in a flood plain and is idle at this time. Shut in on 8 5/8 casing. P# 20648 is in production. P# 20594 is in production. Injection well 1G is idle. Injection well 3G-A is idle. Muddy Fork river is closet body of water 700 to west of well location. Well is in a crop field. Sun, 70 degrees. |
| 1278760777 | 2010-07-09 | Enhanced Recovery Project | Violations Noted | Shut down injection. Trip out 2 7/8 tubing and packer. Strip shoot open hole Berea formation. Ran tubing and packer back in well, but could not get packer to hold annulus pressure. Trip out tubing and packer. Packer rubber is torn. Replace packer before running. Shut down well until 7-12-2010. Rain, 74 degrees. |
| 1289242351 | 2010-11-08 | Enhanced Recovery Project | No Violations | Fracturing Berea Sandstone from 700 to 512. ERP# 20. Pulled 2 7/8 tubing and packer due to plugged perforations in 5.5 casing. Universal Well Services is doing the frac job. Sun, 50 degrees. |
| 137302595 | 2017-5-15 0:00: | ER | No Violations | |
| 1376771099 | 2015-11-17 | Enhanced Recovery Project | No Violations | The operator ran in the hole with one inch tubing to spot hydrochloric acid into the well bore due to the apparent lack of water being injected. Prior to spotting the acid the operator discovered the flow meter was not working property and replaced the meter. The well was taking water and an acid job was not required. |
| 1391432908 | 2014-04-02 | Enhanced Recovery Project | No Violations | Inspect well. System is shut down and not in operation. The pressure is formation pressure. |
| 1457527085 | 2016-03-07 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The operators well head Digital Tubing Pressure gauge indicated 164.3 psi. The flow meter is reported in gallons. |
| 1458227510 | 2016-03-17 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. |
| 1464869674 | 2016-05-25 | Enhanced Recovery Project | No Violations | The operators pressure transducer at the well head has an errored report of 192 psi on the injection tubing. The flow meter is reported in gallons. |
| 1474566938 | 2016-09-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Meter is reported in gallons. |
| 1489493482 | 2017-03-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The operator has shut down the injection system this winter. The master meter indicates 3862 barrels at 0 barrels per day. The wellhead meter is reported in gallons. |
| 1498583034 | 2017-06-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The meter is reported in gallons. The operator Installed new fittings on wellhead. The Pump house meter is 4256 barrels. |
| 1510933626 | 2017-11-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The meter is reported in gallons. |
| 1576140286 | 2010-12-30 | Enhanced Recovery Project | No Violations | Drilling pits are closed. Needs finished graded. Injection well is shut in on tubing. Rain, 36 degrees. |
| 1645868727 | 2015-03-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. The operator has not initiated activities to conduct a mechanical integrity test to start injection activities. |
| 1708413230 | 2013-06-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well shut in system is not in operation. |
| 1834709134 | 2012-08-13 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
| 1914631596 | 2011-04-19 | Preliminary Restoration | No Violations | Preliminary restoration approved. Crop field. |
| 2074924443 | 2018-05-04 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. |
| 2093688392 | 2016-11-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Meter is reported in gallons. |
| 2119918548 | 2011-11-07 | Enhanced Recovery Project | No Violations | Inspect well. |
| 2143641567 | 2011-05-10 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 285836353 | 2015-11-19 0:00 | ER | No Violations | |
| 537606114 | 2017-8-3 0:00:0 | ER | No Violations | |
| 555483133 | 2018-5-3 0:00:0 | ER | No Violations | |
| 674652540 | 2012-6-6 0:00:0 | ER | No Violations | |
| 722196879 | 2015-7-29 0:00: | ER | No Violations | |
| 811432193 | 2014-4-16 0:00: | PW | No Violations | 0.30 |
| 856120161 | 2018-10-17 0:00 | ER | No Violations | |
| 953826808 | 2014-1-2 0:00:0 | ER | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0137302595 | US-OH-111058 | 2017-07-13 | 9-5-10E | Failure to file enhanced recovery annual report |
| 1025889085 | US-OH-100522 | 2019-05-09 | Failure to file enhanced recovery annual report | |
| 1278760777 | US-OH-107750 | 2010-07-10 | Failure to conduct or pass mech. integrity test | |
| 1458227510 | US-OH-113275 | 2017-03-06 | 9-5-10(E) | Failure to monitor pressures or volumes/failure to file |
| 2074924443 | US-OH-121178 | 2018-12-31 | 9-5-10E | Failure to file enhanced recovery annual report |
For data sources see[5]