If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-23591 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Jackson Township | |
Operator Name: RALPH E SHORTS DRILLING | |
Well Pad ID: | |
Farm/Lease Name: WRIGHT WILLIAM & JOYCE | |
License Status: Producing | |
License Date: 1984-07-27 | |
Spud Date: 1984-10-26 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1984-10-29 | |
Well Total Depth: 697.00 ft | |
Configuration: Vertical | |
Latitude: 40.940000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-05-05 | Issued Date 5/5/83 Expired Date 11/1/83 Acres 0075000 Tool Type CRAF Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-07-27 | 270 SHORTS RALPH E DRILLING GeoDate 7/27/84 |
Oil and Gas | 1984-07-27 | Issued Date 7/27/84 Expired Date 1/23/85 Acres 0075000 Tool Type RTAF Proposed Formation BEREA Proposed Depth 00697 Proposed Drill Depth 00697 |
Original Spud | 1984-10-26 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
Completed | 1984-10-29 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
Reached Total Depth | 1984-10-29 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
CO | 1984-11-01 | 270 SHORTS RALPH E DRILLING GeoDate 5/5/83 |
Completion Report Received | 1984-11-07 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
Construction Permit Expires | 1985-01-23 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
Record Last Modified | 2017-02-15 | R.I. 7-28-84 IPN. OIL = 1/2 BBL. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 622 | 670 | 0 |
622 | 670 | 0 | |
622 | 670 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 2 Qts | 0 | SHOT: 2 QT/FT NITRO, 635-670 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | RALPH E SHORTS DRILLING | 0.00 | 110.00 | 365 |
1993 | RALPH E SHORTS DRILLING | 0.00 | 124.00 | 365 |
1995 | RALPH E SHORTS DRILLING | 0.00 | 114.00 | 300 |
1996 | RALPH E SHORTS DRILLING | 0.00 | 115.00 | 365 |
1999 | RALPH E SHORTS DRILLING | 0.00 | 115.00 | 365 |
2000 | RALPH E SHORTS DRILLING | 0.00 | 135.00 | 365 |
2001 | RALPH E SHORTS DRILLING | 0.00 | 140.00 | 365 |
2002 | RALPH E SHORTS DRILLING | 0.00 | 125.00 | 365 |
2003 | RALPH E SHORTS DRILLING | 0.00 | 104.00 | 365 |
2004 | RALPH E SHORTS DRILLING | 0.00 | 126.00 | 365 |
2005 | RALPH E SHORTS DRILLING | 0.00 | 117.00 | 365 |
2006 | RALPH E SHORTS DRILLING | 0.00 | 139.00 | 365 |
2007 | RALPH E SHORTS DRILLING | 0.00 | 114.00 | 365 |
2009 | RALPH E SHORTS DRILLING | 0.00 | 80.00 | 365 |
2010 | RALPH E SHORTS DRILLING | 0.00 | 60.00 | 365 |
2011 | RALPH E SHORTS DRILLING | 0.00 | 72.00 | 365 |
2012 | RALPH E SHORTS DRILLING | 0.00 | 73.00 | 366 |
2013 | RALPH E SHORTS DRILLING | 0.00 | 73.00 | 365 |
2014 | RALPH E SHORTS DRILLING | 0.00 | 66.00 | 335 |
2015 | RALPH E SHORTS DRILLING | 0.00 | 71.00 | 335 |
2016 | RALPH E SHORTS DRILLING | 0.00 | 92.00 | 365 |
2017 | RALPH E SHORTS DRILLING | 0.00 | 62.00 | 352 |
2018 | RALPH E SHORTS DRILLING | 0.00 | 116.00 | 352 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2048848206 | 2018-4-12 0:00: | PW | No Violations | |
-740749733 | 2017-3-15 0:00: | PW | No Violations | 0.50 |
0740749733 | 2017-03-15 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. ID is posted. There are 3-100 barrel tanks in the tank battery. |
2048848206 | 2018-04-12 | Production Wells | No Violations | A water sample was collected for analysis. The specific gravity was field tested at 1.05 units. |
For data sources see[9]