If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21432 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.366861105,"lon":-81.07850913,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: North Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-001016 | |
Farm/Lease Name: KLODT 29-11-5 | |
License Status: Producing | |
License Date: 2014-12-18 | |
Spud Date: 2014-12-21 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-03-20 | |
Well Total Depth: 16024 ft | |
Configuration: Horizontal | |
Latitude: 40.366861105 | |
Longitude: -81.07850913 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-18 | Proposed Formations:POINT PLEASANT, Issued Date:12/18/2014, Expired Date:12/17/2016 12:00:00 PM, Drilling unit acres:1245.1, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-03-20 | |
Correction to Well | 2015-09-04 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-03-02 | |
Construction Permit Expires | 2016-12-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-04 | 8513 | 15894 | 825 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/17/2015 | 06/26/2015 | 8152 | 6,650,700.0 | 573541 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 82.3684 | 0 |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.21232 | 0 | |
A264, J218, J475, J580, J609, J610,
L058, Acid, Hydrochloric 7.5pct, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Acid, Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 15.9468 | 0 | |
Hydrogen Chloride | 007647-01-0 | 15 | 0.06335 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01483 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00023 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00031 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.54551 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00022 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00741 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00008000 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.0027 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00887 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00054 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.02324 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00023 | 0 | ||||
Water | 007732-18-5 | 93 | 0.28661 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.08632 | 0 | ||||
Water | 007732-18-5 | 85 | 0.35898 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00887 | 0 | ||||
TS-30 | X CHEM | Scale Inhibitor | Proprietary Sodium Polycarboxylate | TRADE SECRET | 100 | 0.01682 | 0 | |
Water | 007732-18-5 | 0 | 0.02014 | 0 | ||||
Chlorine Dioxide | TERRA SERVICES | Anti-Bacterial Agent | Chlorine Dioxide | 010049-04-4 | 100 | 0.00837 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-22 | H2O | 0 | 4387 Bbl | 338350 | Schlumberger | STAGE 33/33
25 SHOTS |
2015-06-01 | H2O | 0 | 4999 Bbl | 336360 | Schlumberger | STAGE 1/33
25 SHOTS STAGES 2-31 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 183356 | 14272 | 62 |
2016 | CHESAPEAKE EXPLORATION LLC | 815413 | 31852 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 428182 | 9087 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 307320 | 4623 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 64550 | 1054 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 4131 | 62 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 14326 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 8530 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 4393 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 177 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0298896752 | 2015-03-10 | Casing String Witnessed | No Violations | I was on location at 7:45am to witness the cementing of the 13.375 surface casing. Nomac Rig #73 drilled a 17.5 hole to a total depth of 543 and Wyoming Casing set 533 of surface casing in the hole. Baker-Hughes rigged up, tested the lines, and cemented the casing with 105 barrels of Class A cement slurry. They released the plug and displaced the plug to the float collar with 75.8 barrels of freshwater. The plug landed at 270psi and the pressure was increased and held at 877psi for 5 minutes. The pressure was released and 0.5 barrels flowed back to the truck. 25 barrels of cement circulated to surface. No violations. See cement ticket for more details on this job. |
0474168944 | 2016-02-18 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 5 compressors There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0739099428 | 2015-03-16 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Nomac Rig #73. They are currently at a depth of 8,399 with the 8.5 drill bit and are tripping drill pipe out of the hole to change out the motor and bit in the curve section or they will miss the projected landing point of 8,662. The mud-up-point was 7,156 and the kick-off-point was 7,256. The location is in good condition and all drilling equipment is on containment. No violations. |
1392710870 | 2015-03-11 | Casing String Witnessed | No Violations | I was on location at 8:40pm to witness the cementing of the 9.625 intermediate casing. Nomac #73 drilled a 12.25hole to a depth of 2431 and Wyoming Casing ran 2421 of intermediate casing into the hole. Baker-Hughes rigged up, tested the lines, and pumped 10 barrels of water, 30 barrels of gel, and another 10 barrels of water spacer ahead of the slurry. They then mixed and pumped 186.2 barrels of cement dropped the plug and displaced the plug to the collar with 176.8 barrels of water. The plug landed at 1000psi and the pressure was increased and held at 1500psi for 5 minutes. The pressure was released and the floats held with 1 barrel flowing back to the truck. 40 barrels of cement circulated to surface. No violations. See cement ticket for more details on this job. |
2113432835 | 2016-01-11 | Preliminary Restoration | No Violations | On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap, a gas production unit and a line heater. Production equipment that was shared with permitted wells 34067212280000, 34067212290000, 34067212300000, 34067212310000, 34067212320000, 34067212330000, and 34067214310000 included a vapor recovery system, 5 gas compressors, a gas combustor and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
For data sources see[10]