If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 15: | Line 15: | ||
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | ||
|- | |- | ||
− | | Well Pad ID: [[001277]] | + | | Well Pad ID: [[US-OH-001277]] |
|- | |- | ||
| Farm/Lease Name: SADIE 33-10-4 | | Farm/Lease Name: SADIE 33-10-4 | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2017-10-18 |
|- | |- | ||
| Spud Date: 2017-10-15 | | Spud Date: 2017-10-15 |
Well ID: 34-067-21508 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.332349902,"lon":-80.97878629,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-001277 | |
Farm/Lease Name: SADIE 33-10-4 | |
License Status: Producing | |
License Date: 2017-10-18 | |
Spud Date: 2017-10-15 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-02-06 | |
Well Total Depth: 20059 ft | |
Configuration: Horizontal | |
Latitude: 40.332349902 | |
Longitude: -80.97878629 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-07-15 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:7/15/2015, Expired Date:7/14/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-06-19 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:6/19/2017, Expired Date:6/19/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-10-18 | Proposed Formations:POINT PLEASANT, Issued Date:10/18/2017, Expired Date:10/18/2019 12:00:00 PM, Drilling unit acres:877.64, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-02-06 | |
Correction to Well | 2018-07-13 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-08-03 | |
Record Last Modified | 2018-08-15 | |
Construction Permit Expires | 2019-10-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-08-14 | 9032 | 9153 | 0 |
2018-08-14 | 19827 | 19929 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/22/2018 | 05/09/2018 | 8584 | 13,169,800.0 | 1,531,450.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00001000 | 0 |
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.08789 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00023 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00138 | 0 | ||||
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00158 | 0 | |
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00047 | 0 | ||||
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.5139 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.43967 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 68.892 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 9.81184 | 0 | |
BC-140 X2, FE-2A, FR-76, HAI-OS
OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Polyacrylamide copolymer | Trade Secret | 30 | 0.01492 | 0 | |
Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | ||||
BC-140 X2 | HALLIBURTON | Cross Linker | Monoethanolamine borate | 026038-87-9 | 60 | 0.03145 | 0 | |
Ethylene Glycol | 000107-21-1 | 30 | 0.01573 | 0 | ||||
FE-2A | HALLIBURTON | Iron Control Agent | Citric Acid | 000077-92-9 | 60 | 0.00481 | 0 | |
FR-76 | HALLIBURTON | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.0122 | 0 | |
Proprietary Inorganic Salt | Trade Secret | 30 | 0.0122 | 0 | ||||
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 93 | 0.02813 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.00228 | 0 | ||||
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00025 | 0 | |
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.0016 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-09 | H2O | 15 | 286151 Gal | 326690 | Halliburton | STAGE 73/73
STAGES 2-72 SEE IMAGES |
2018-04-22 | H2O | 15 | 155579 Gal | 199775 | Halliburton | STAGE 1/73
STAGES 2-72 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 2601624 | 2189 | 210 |
2019 | CHESAPEAKE EXPLORATION LLC | 975302 | 45 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 24994 | 210 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 2425 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0407112230 | 2018-01-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 580 tripping back into the hole after a bit trip. 8.75 inch diameter hole is currently drilled to 6416 feet. |
0652056697 | 2017-10-16 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed express energy cement the 20 inch diameter conductor casing. A 30 inch diameter casing was set to 40 feet and the backside was ready-mixed. The pad is on strip ground and they had to stabilize the unconsolidated material to reach total depth. A 26 inch diameter hole was augered to 120 feet. Express cemented the 20 inch diameter casing with 237 sacks of class A cement. Cement displaced with 39 barrels of water. Cement weighed 15.6 with mud scale and has a yield of 1.18. Additives include 2% cacl and .5#/sk celloflake. 50% excess ran in open hole from 40 to 120. 10 barrels of cement returned to surface. |
0845215546 | 2018-01-02 | Production Wells | No Violations | On the day of my inspection I witnessed Patterson 580 had just finished cementing their 13.375 inch diameter casing. The rig drilled a 17.5 inch diameter hole to a depth of 521 feet. Wyoming casing ran 514 feet of casing; j-55, 54.5 lbs. per foot. Casing centralized with 12 centralizers. Shoe track is 39 feet long. Previous casing cemented was 20 inch diameter conducter to 120 feet. O-tex was onsite with 525 sacks of class H cement and displaced the cement with 74 barrels of water. 50% excess ran in open hole. Cement crew says 19 barrels of cement returned to surface and floats held with 0.5 barrel back to the truck. |
0906248909 | 2018-03-12 | Preliminary Restoration | No Violations | On the day of my inspection I found the pad to include 5 wells. During my inspection the wells were having their wellheads built. Patterson 580 moved off of the pad last week and these wells have not been stimulated. The pad is stable and vegetated. Site meets requirements of ORC 1509.072A for preliminary restoration. |
1503814719 | 2018-01-29 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 580 was drilling their 8.75 inch diameter hole at 6950 feet. They are drilling with oil base mud and are in the clinton. They got stuck in the hole and had to sidetrack last week. A cement plug and whipstock were set from 5,675 to 5,069 feet. Bottom hole assembly consisting of 4 drill collars, directional tool, mud motor, 2 crossover subs, stabilizer, and bit was left in the hole along with 7,935 feet of 5.875 inch diameter drill pipe. |
1516129089 | 2018-01-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 580 was drilling their 8.5 inch diameter lateral section at a depth of 13932. |
1941247529 | 2018-05-07 | Completion Testing | No Violations | On the day of my inspection I found a halliburton frac crew rigged up on the 1H and this well. During my inspection, I witnessed frac stage 63 of 75 on this well. 9.625 inch diameter annular pressure is 184 psi. |
For data sources see[10]