X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21451"

m
 
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21451
 
| Well ID: 34-067-21451
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.19066206, -80.99959131 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.190593470, -80.99977230 | width=100% | height=100% }}
 
|-
 
|-
| County:  
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name:  
+
| County: [[Harrison_County,_Ohio|Harrison]]
 
|-
 
|-
| Well Pad ID:  
+
| Municipality: [[Athens_Township,_Harrison_County,_Ohio|Athens Township]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Operator Name: [[ASCENT RESOURCES UTICA LLC]]
 
|-
 
|-
| First Permit Date:  
+
| Well Pad ID: [[001238]]
 
|-
 
|-
| Last Permit Date:  
+
| Farm/Lease Name: FOXTROT ATH HR
 
|-
 
|-
| Spud Date:  
+
| License Status: Producing
 
|-
 
|-
| Unconventional:  
+
| License Date: 2018-09-05
 
|-
 
|-
| Configuration:  
+
| Spud Date: 2015-06-30
 
|-
 
|-
| Well Status:  
+
| Spud Drilling Contractor: [[NABORS DRILLING]]
 
|-
 
|-
| Violations: 0
+
| Final Drill Date: 2016-02-19
 
|-
 
|-
| Latitude: 40.19066206
+
| Well Total Depth: 16020 ft
 
|-
 
|-
| Longitude: -80.99959131
+
| Configuration: Horizontal
 +
|-
 +
| Latitude: 40.190593470
 +
|-
 +
| Longitude: -80.99977230
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2015-03-05
 +
| Proposed Formations:POINT PLEASANT, Issued Date:3/5/2015, Expired Date:3/4/2017 12:00:00 PM, Drilling unit acres:733.781, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Correction to Well
 +
| 2016-01-08
 +
| CORRECTION TO CASING PROGRAM
 +
|-
 +
| Reached Total Depth
 +
| 2016-02-19
 +
|
 +
|-
 +
| Correction to Well
 +
| 2016-05-06
 +
| CHANGE TARGET/TAKEPOINT AS DRILLED PLAT-ALE
 +
|-
 +
| Construction Permit Expires
 +
| 2017-03-04
 +
|
 +
|-
 +
| Completion Report Received
 +
| 2018-08-30
 +
|
 +
|-
 +
| Change of Owner
 +
| 2018-10-15
 +
| Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 9520, ASCENT RESOURCES UTICA LLC
 +
|-
 +
| Correction to Well
 +
| 2018-10-19
 +
| CHANGE IN WELL NAME AND NUMBER (PREVIOUS: ATHENS F #4H-5)
 +
|-
 +
| Record Last Modified
 +
| 2018-10-19
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2018-09-05
 +
| style="text-align: right;" | 9356
 +
| style="text-align: right;" | 9428
 +
| style="text-align: right;" | 34
 +
|-
 +
| 2018-09-05
 +
| style="text-align: right;" | 15758
 +
| style="text-align: right;" | 15880
 +
| style="text-align: right;" | 34
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2018-04-26
 +
| H2O
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 7686 Bbl
 +
| style="text-align: right;" | 228040
 +
| [[US Well Services Inc]]
 +
| STAGE 1/62
 +
STAGES 2-61 SEE IMAGES
 +
|-
 +
| 2018-05-14
 +
| H2O
 +
| style="text-align: right;" | 7
 +
| style="text-align: right;" | 4756 Bbl
 +
| style="text-align: right;" | 250500
 +
| [[US Well Services Inc]]
 +
| STAGE 62/62
 +
STAGES 2-61 SEE IMAGES
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2018
 +
| [[ASCENT RESOURCES UTICA LLC]]
 +
| style="text-align: right;" | 1148529
 +
| style="text-align: right;" | 1104
 +
| style="text-align: right;" | 142
 +
|-
 +
| 2019
 +
| [[ASCENT RESOURCES UTICA LLC]]
 +
| style="text-align: right;" | 793474
 +
| style="text-align: right;" | 336
 +
| style="text-align: right;" | 90
 
|-
 
|-
 
|}
 
|}
== References ==
+
For data sources see<ref>{{cite web
{{reflist}}
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2018
 +
| [[ASCENT RESOURCES UTICA LLC]]
 +
| Brine
 +
| style="text-align: right;" | 5327
 +
| style="text-align: right;" | 142
 +
|-
 +
| 2019
 +
| [[ASCENT RESOURCES UTICA LLC]]
 +
| Brine
 +
| style="text-align: right;" | 3748
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0469744735
 +
| 2016-03-07
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On the day of my inspection while accompanied by inspector Mark Moreland, I witnessed Nabors Rig No. 36 was 95 percent completed in the process of rigging down. A steaming contractor was on site cleaning all drilling equipment and multiple Hess Employees were assisting in the rigging down process. While on site Mark and I did not witness any signs of spills or contamination.
 +
|-
 +
| 0505966425
 +
| 2018-08-28
 +
| Production Wells
 +
| No Violations
 +
| On the day of my inspection I am viewing pad for complaint 5946. Royalty owner is concerned they are not going to get paid for production because lease is apparently transferring to Ascent resources. Pad contains 5 plunge lift wells with valves open.  Production equipment includes 5 GPUs, a compressor, and three 400 barrel steel tanks in their own containment. Surface annular pressure is 0 and intermediate annular pressure is 180. Spoke with landowner after royalty owner after inspection and he believes the situation has been corrected. Complaint can be closed.
 +
|-
 +
| 0901483284
 +
| 2018-03-15
 +
| Preliminary Restoration
 +
| No Violations
 +
| On the day of my inspection I found this pad to contain 5 wells. Current operations on the pad are installing frac stacks on the wells in preparation for well stimulation in April. Outslopes of pad are vegetated and stable. A crane and frac tanks are on location. Site meets requirements of ORC 1509.072A for preliminary restoration.
 +
|-
 +
| 1435755260
 +
| 2015-06-30
 +
| Casing String Witnessed
 +
| No Violations
 +
| HAD Drilling RIG # 618 is drilling a 24 inch hole and setting 24 casing at 100 ft. with no cement because it is drilling using the concentric drilling method with no annular space to cement.
 +
|-
 +
| 1447022884
 +
| 2015-11-08
 +
| Casing String Witnessed
 +
| No Violations
 +
| Inspector Moreland and I are on site to witness a mine string cement job on HWD (Horizontal Well Drillers) Rig No. 11.  HWD drilled a 22 inch diameter hole to 196 feet and set 172 feet of 18 5/8 inch diameter, 87.5 pound casing. There are two cement baskets on this job, one at 92 feet and one at 72 feet. There is a float collar at 152 feet. Schlumberger is performing the cement job, using 220 sacks of class A 15.6 pound, 1.2 yield cement. This volume should have been enough to bring cement returns to surface, however there were no returns of any kind witnessed at surface. Next HWD placed 1 1/4 inch diameter tubing in the annular space to 60 feet, then Schlumberger pumped 110 sacks of class A cement and topped off to surface. Inspector Moreland and I witnessed good returns to surface.
 +
|-
 +
| 1447094480
 +
| 2015-11-09
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I am on site today with Inspector Moreland to witness a surface casing cement job. HWD (Horizontal Well Drillers) Rig No.11 drilled a 17 1/2 inch diameter hole to a depth of 370 feet and set 352 feet of 13 3/8 inch diameter, 54.5 pound casing. Shlumberger was late arriving to the location, then took two hours to rig up. Prior to beginning the cement job, a quality control analysis was conducted on the cement. The casing job was then placed on hold, because the cement was thought to have failed the test. We were unable to witness the casing cement job because there was no time frame for the remedial action of the failed quality control test.
 +
|-
 +
| 1634481007
 +
| 2015-11-10
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Arrived on location to meet with company man Matt Stevenson to review the remedy to the cement problems in regards to the failed quality control test. The cement job report indicated that the intermediate casing string cement job was started around 11 pm and concluded approximately around 12:30 am. The report also indicated that 16 bbl. Of cement was returned to surface.
 +
|-
 +
| 2031266159
 +
| 2016-03-09
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On the day of my inspection accompanied by inspector Mark Moreland, I witnessed Nabors Rig No. 36 was completely rigged down. While on site I spoke to the company man Roy Chaney who informed me that the rig will be laid down in a yard in Pennsylvania and Hess Ohio has no plans to drill in Harrison County Ohio for the rest of the year. While on site I did not see any signs of spills or contamination.
 +
|-
 +
| 2065031563
 +
| 2018-05-07
 +
| Completion Testing
 +
| No Violations
 +
| On the day of my inspection US Well Service was onsite rigged up to the 3h, 4h, and 5h wells. This well is on the 29th out of 62 frack stages. Well has 295 psi on intermediate annular and 0 psi on the surface annular. There is no fracking ongoing at the time of the inspection.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 00:49, 24 July 2019

Well Details

Well ID: 34-067-21451
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Athens Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: 001238
Farm/Lease Name: FOXTROT ATH HR
License Status: Producing
License Date: 2018-09-05
Spud Date: 2015-06-30
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2016-02-19
Well Total Depth: 16020 ft
Configuration: Horizontal
Latitude: 40.190593470
Longitude: -80.99977230

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-03-05 Proposed Formations:POINT PLEASANT, Issued Date:3/5/2015, Expired Date:3/4/2017 12:00:00 PM, Drilling unit acres:733.781, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2016-01-08 CORRECTION TO CASING PROGRAM
Reached Total Depth 2016-02-19
Correction to Well 2016-05-06 CHANGE TARGET/TAKEPOINT AS DRILLED PLAT-ALE
Construction Permit Expires 2017-03-04
Completion Report Received 2018-08-30
Change of Owner 2018-10-15 Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 9520, ASCENT RESOURCES UTICA LLC
Correction to Well 2018-10-19 CHANGE IN WELL NAME AND NUMBER (PREVIOUS: ATHENS F #4H-5)
Record Last Modified 2018-10-19

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-09-05 9356 9428 34
2018-09-05 15758 15880 34

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-26 H2O 15 7686 Bbl 228040 US Well Services Inc STAGE 1/62

STAGES 2-61 SEE IMAGES

2018-05-14 H2O 7 4756 Bbl 250500 US Well Services Inc STAGE 62/62

STAGES 2-61 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 1148529 1104 142
2019 ASCENT RESOURCES UTICA LLC 793474 336 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 5327 142
2019 ASCENT RESOURCES UTICA LLC Brine 3748 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0469744735 2016-03-07 Drill / Deepen / Reopen No Violations On the day of my inspection while accompanied by inspector Mark Moreland, I witnessed Nabors Rig No. 36 was 95 percent completed in the process of rigging down. A steaming contractor was on site cleaning all drilling equipment and multiple Hess Employees were assisting in the rigging down process. While on site Mark and I did not witness any signs of spills or contamination.
0505966425 2018-08-28 Production Wells No Violations On the day of my inspection I am viewing pad for complaint 5946. Royalty owner is concerned they are not going to get paid for production because lease is apparently transferring to Ascent resources. Pad contains 5 plunge lift wells with valves open. Production equipment includes 5 GPUs, a compressor, and three 400 barrel steel tanks in their own containment. Surface annular pressure is 0 and intermediate annular pressure is 180. Spoke with landowner after royalty owner after inspection and he believes the situation has been corrected. Complaint can be closed.
0901483284 2018-03-15 Preliminary Restoration No Violations On the day of my inspection I found this pad to contain 5 wells. Current operations on the pad are installing frac stacks on the wells in preparation for well stimulation in April. Outslopes of pad are vegetated and stable. A crane and frac tanks are on location. Site meets requirements of ORC 1509.072A for preliminary restoration.
1435755260 2015-06-30 Casing String Witnessed No Violations HAD Drilling RIG # 618 is drilling a 24 inch hole and setting 24 casing at 100 ft. with no cement because it is drilling using the concentric drilling method with no annular space to cement.
1447022884 2015-11-08 Casing String Witnessed No Violations Inspector Moreland and I are on site to witness a mine string cement job on HWD (Horizontal Well Drillers) Rig No. 11. HWD drilled a 22 inch diameter hole to 196 feet and set 172 feet of 18 5/8 inch diameter, 87.5 pound casing. There are two cement baskets on this job, one at 92 feet and one at 72 feet. There is a float collar at 152 feet. Schlumberger is performing the cement job, using 220 sacks of class A 15.6 pound, 1.2 yield cement. This volume should have been enough to bring cement returns to surface, however there were no returns of any kind witnessed at surface. Next HWD placed 1 1/4 inch diameter tubing in the annular space to 60 feet, then Schlumberger pumped 110 sacks of class A cement and topped off to surface. Inspector Moreland and I witnessed good returns to surface.
1447094480 2015-11-09 Drill / Deepen / Reopen No Violations I am on site today with Inspector Moreland to witness a surface casing cement job. HWD (Horizontal Well Drillers) Rig No.11 drilled a 17 1/2 inch diameter hole to a depth of 370 feet and set 352 feet of 13 3/8 inch diameter, 54.5 pound casing. Shlumberger was late arriving to the location, then took two hours to rig up. Prior to beginning the cement job, a quality control analysis was conducted on the cement. The casing job was then placed on hold, because the cement was thought to have failed the test. We were unable to witness the casing cement job because there was no time frame for the remedial action of the failed quality control test.
1634481007 2015-11-10 Drill / Deepen / Reopen No Violations Arrived on location to meet with company man Matt Stevenson to review the remedy to the cement problems in regards to the failed quality control test. The cement job report indicated that the intermediate casing string cement job was started around 11 pm and concluded approximately around 12:30 am. The report also indicated that 16 bbl. Of cement was returned to surface.
2031266159 2016-03-09 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by inspector Mark Moreland, I witnessed Nabors Rig No. 36 was completely rigged down. While on site I spoke to the company man Roy Chaney who informed me that the rig will be laid down in a yard in Pennsylvania and Hess Ohio has no plans to drill in Harrison County Ohio for the rest of the year. While on site I did not see any signs of spills or contamination.
2065031563 2018-05-07 Completion Testing No Violations On the day of my inspection US Well Service was onsite rigged up to the 3h, 4h, and 5h wells. This well is on the 29th out of 62 frack stages. Well has 295 psi on intermediate annular and 0 psi on the surface annular. There is no fracking ongoing at the time of the inspection.

For data sources see[9]

References