Well ID: 34-013-61044 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.908105796,"lon":-80.91452202,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: HISTORIC OWNER | |
Well Pad ID: | |
Farm/Lease Name: KOSMOS | |
License Status: Final Restoration | |
License Date: | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.908105796 | |
Longitude: -80.91452202 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Plugged/Abandoned | 2017-11-22 | UPDATED LOCATION PER INSPECTOR GPS 10/02/2017 ALE. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE. UPDATED WELL NAME FROM BLANK TO INSPECTOR GIVEN NAME 8/8/2018 ALE |
Changed to Orphan Well Pending | 2019-03-25 | Changed Well To Orphan Pending |
Record Last Modified | 2019-06-06 | UPDATED LOCATION PER INSPECTOR GPS 10/02/2017 ALE. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE. UPDATED WELL NAME FROM BLANK TO INSPECTOR GIVEN NAME 8/8/2018 ALE |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0074413792 | 2017-11-20 | Orphan | No Violations | 9:15 AM: The crew fixed the supports under the bridge and placed silt fence at the south end of the bridge. The large track hoe drove 2--inch rock) that they placed, with the large track hoe, over the muddy area at the north end of the bridge. Crew did not take lunch.
3:45: I left location. |
0785797823 | 2017-11-16 | Orphan | No Violations | 10:00 AM: I arrived on location to find crew dressing up culvert area. They had installed some of the silt fence, but not to specifications.
12:00 PM: Waiting on bridge to get on location. The plan is to get it unloaded today and then put assemble it across the creek tomorrow. 2:00 PM : I left location, crew still waiting on bridge. |
0869706270 | 2017-11-19 | Orphan | No Violations | 8:45 AM: Rig Supervisor Steve Jones called to say it rained much and that the bridge and track-hoe are still in place. He would like to check supports underneath the bridge (sent pictures). He also stated that the rig and associated equipment left our northern location at 7 AM.
1:45 PM: I arrived and found the rig and 2 tubs, with bits, tools, etc., were delivered. They are waiting on the water tank to arrive. 2:45 PM: I and the crew left location. |
0903932503 | 2017-04-11 | Orphan | No Violations | A call from Emergency Response prompted and inspection to be conducted on this well. Buffy Thompson called with concerns of anti-collision because there was going to be directional drilling under Captina Creek for a pipeline project. The fire department and the County EMA was on location during my inspection. The well in question shows as plugged in the RBDMS system, however the well is still present with casing protruding from the surface. A GPS point was taken of the well and the idle and orphan program has been notified of my findings. Photos were also taken on the day of my inspection. |
0978165869 | 2018-05-25 | Final Restoration | No Violations | My inspection today found the site has been reclaimed with grass/weeds covering the entire area. No issues found - has passed final restoration |
1516986998 | 2017-11-15 | Orphan | No Violations | 8:10 Culvert in place along (parallel to) access road so the area will drain
8:30 With one load of #2 gravel dumped, crew is spreading gravel and placing mats on it #2 Gravel - see below Mats placed on bed of gravel - each mat is 16 x 4 = 64 sq. ft. 20 mats 9:15 Last load of gravel arrives and was spread with larger track-hoe #2 Gravel 11:00 Dig out below culvert with track-hoe to provide drainage basin. 12:30 Finish dressing up culvert, spread 2 bales straw over ground, will place silt fence between basin and creek. 1:45 Crew left location - have to take Rover Pipeline safety classes at 15:00 in Belmont. Safety training for 1.75 hrs. |
2093116667 | 2017-11-18 | Orphan | No Violations | 12:15 PM: I arrived on location and found the crew setting the 2nd support for the bridge in the water. They then set the 3rd section of bridge with the bigger track hoe.
2:00 PM: The 4th section of bridge was set in place. The Contractor informed me that their gravel load was cancelled due to mechanical troubles. Gravel is needed to come off the creek bank and onto the north side of the bridge. Thirty feet of silt fence has been installed along the drainage ditch that runs parallel to the access road leading to the creek. 3:20 PM: I left location, crew is placing straw on all barren ground and the small hoe has been placed on bridge for stability. The crew will leave as soon as the straw has been placed. |