34-013-61044

Well Details

Well ID: 34-013-61044
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: HISTORIC OWNER
Well Pad ID:
Farm/Lease Name: KOSMOS
License Status: Final Restoration
License Date:
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.900000
Longitude: -80.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Plugged/Abandoned 2017-11-22 UPDATED LOCATION PER INSPECTOR GPS 10/02/2017 ALE. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE. UPDATED WELL NAME FROM BLANK TO INSPECTOR GIVEN NAME 8/8/2018 ALE
Changed to Orphan Well Pending 2019-03-25 Changed Well To Orphan Pending
Record Last Modified 2019-06-06 UPDATED LOCATION PER INSPECTOR GPS 10/02/2017 ALE. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE. UPDATED WELL NAME FROM BLANK TO INSPECTOR GIVEN NAME 8/8/2018 ALE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-20699756 2017-11-17 0:00 OR No Violations 8.00
-2093116667 2017-11-18 0:00 OR No Violations 8.00
-869706270 2017-11-19 0:00 OR No Violations 8.00
-978165869 2018-5-25 0:00: FR No Violations 0.30
0074413792 2017-11-20 Orphan No Violations 9:15 AM: The crew fixed the supports under the bridge and placed silt fence at the south end of the bridge. The large track hoe drove 2--inch rock) that they placed, with the large track hoe, over the muddy area at the north end of the bridge. Crew did not take lunch.

3:45: I left location.

0785797823 2017-11-16 Orphan No Violations 10:00 AM: I arrived on location to find crew dressing up culvert area. They had installed some of the silt fence, but not to specifications.

12:00 PM: Waiting on bridge to get on location. The plan is to get it unloaded today and then put assemble it across the creek tomorrow. 2:00 PM : I left location, crew still waiting on bridge.

0869706270 2017-11-19 Orphan No Violations 8:45 AM: Rig Supervisor Steve Jones called to say it rained much and that the bridge and track-hoe are still in place. He would like to check supports underneath the bridge (sent pictures). He also stated that the rig and associated equipment left our northern location at 7 AM.

1:45 PM: I arrived and found the rig and 2 tubs, with bits, tools, etc., were delivered. They are waiting on the water tank to arrive. 2:45 PM: I and the crew left location.

0903932503 2017-04-11 Orphan No Violations A call from Emergency Response prompted and inspection to be conducted on this well. Buffy Thompson called with concerns of anti-collision because there was going to be directional drilling under Captina Creek for a pipeline project. The fire department and the County EMA was on location during my inspection. The well in question shows as plugged in the RBDMS system, however the well is still present with casing protruding from the surface. A GPS point was taken of the well and the idle and orphan program has been notified of my findings. Photos were also taken on the day of my inspection.
0978165869 2018-05-25 Final Restoration No Violations My inspection today found the site has been reclaimed with grass/weeds covering the entire area. No issues found - has passed final restoration
1516986998 2017-11-15 Orphan No Violations 8:10 Culvert in place along (parallel to) access road so the area will drain

8:30 With one load of #2 gravel dumped, crew is spreading gravel and placing mats on it #2 Gravel - see below Mats placed on bed of gravel - each mat is 16 x 4 = 64 sq. ft. 20 mats 9:15 Last load of gravel arrives and was spread with larger track-hoe #2 Gravel 11:00 Dig out below culvert with track-hoe to provide drainage basin. 12:30 Finish dressing up culvert, spread 2 bales straw over ground, will place silt fence between basin and creek. 1:45 Crew left location - have to take Rover Pipeline safety classes at 15:00 in Belmont. Safety training for 1.75 hrs.

1583935095 2017-11-21 0:00 OR No Violations 9.00
2093116667 2017-11-18 Orphan No Violations 12:15 PM: I arrived on location and found the crew setting the 2nd support for the bridge in the water. They then set the 3rd section of bridge with the bigger track hoe.

2:00 PM: The 4th section of bridge was set in place. The Contractor informed me that their gravel load was cancelled due to mechanical troubles. Gravel is needed to come off the creek bank and onto the north side of the bridge. Thirty feet of silt fence has been installed along the drainage ditch that runs parallel to the access road leading to the creek. 3:20 PM: I left location, crew is placing straw on all barren ground and the small hoe has been placed on bridge for stability. The crew will leave as soon as the straw has been placed.

74413792 2017-11-20 0:00 OR No Violations 8.00
785797823 2017-11-16 0:00 OR No Violations 8.00
903932503 2017-4-11 0:00: OR No Violations 1.00