If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22134 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.441421858,"lon":-80.96969213,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000553 | |
Farm/Lease Name: TUCKOSH 35-11-4 | |
License Status: Producing | |
License Date: 2013-12-09 | |
Spud Date: 2013-12-14 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-01-12 | |
Well Total Depth: 14530 ft | |
Configuration: Horizontal | |
Latitude: 40.441421858 | |
Longitude: -80.96969213 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-03-07 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:3/7/2012, Expired Date:3/7/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2012-03-16 | CORRECTION TO LEASE NAME |
APP | 2013-12-09 | Proposed Formations:POINT PLEASANT, Issued Date:12/9/2013, Expired Date:12/9/2015 12:00:00 PM, Drilling unit acres:525.65, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-01-12 | |
Correction to Well | 2014-07-03 | UNIT SIZE CHANGED TO 519.40 ACRES. CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-12-12 | |
Construction Permit Expires | 2015-12-09 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-12-12 | 8553 | 14275 | 630 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/02/2014 | 08/07/2014 | 8323 | 4,844,240.0 | 398337 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL 5.1 - 7.5 | BAKER HUGHES | Acid | Water | 007732-18-5 | 93 | 1.08055 | 0 |
Hydrochloric Acid | 007647-01-0 | 8 | 0.08761 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 4.15357 | 0 | |
GBW-5 | BAKER HUGHES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00274 | 0 | |
BF-9L | BAKER HUGHES | pH Adjusting Agent | Potassium Hydroxide | 001310-58-3 | 15 | 0.0071 | 0 | |
BF-9L, CI-14, ENZYME G-NE, FERROTROL 300L
FRW-18, GW-3LDF, SCALETROL 720 |
BAKER HUGHES | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent, Scale Inhibitor | Proprietary Biocide | TRADE SECRET | 0 | 0.00228 | 0 | |
Proprietary Solvent | TRADE SECRET | 0 | 0.15733 | 0 | ||||
Calcium Chloride | 010043-52-4 | 0 | 0.01588 | 0 | ||||
Proprietary Polymer | TRADE SECRET | 0 | 0.03837 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.00228 | 0 | ||||
Proprietary Acid | TRADE SECRET | 0 | 0.00228 | 0 | ||||
Proprietary Copolymer | TRADE SECRET | 0 | 0.00228 | 0 | ||||
Proprietary Silica | TRADE SECRET | 0 | 0.15733 | 0 | ||||
Hemicellulase Enzyme Concentrate | 009025-56-3 | 0 | 0.03403 | 0 | ||||
Proprietary Weak Acid | TRADE SECRET | 0 | 0.15733 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.15733 | 0 | ||||
Proprietary Disinfectant | TRADE SECRET | 0 | 0.15733 | 0 | ||||
Water | 007732-18-5 | 0 | 0.27268 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 79.9265 | 0 | |
ALPHA 1427 | BAKER HUGHES | Anti-Bacterial Agent | Water | 007732-18-5 | 60 | 0.0102 | 0 | |
Quaternary Ammonium Compound | 068424-85-1 | 7 | 0.00119 | 0 | ||||
Ethanol | 000064-17-5 | 5 | 0.00085 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.0051 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 10 | 0.0017 | 0 | ||||
FRW-18 | BAKER HUGHES | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.00577 | 0 | |
Northern White Sand | BAKER HUGHES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 9.91285 | 0 | |
CI-14 | BAKER HUGHES | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 68 | 0.00133 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 5 | 0.0001 | 0 | ||||
XLW-32 | BAKER HUGHES | Cross Linker | Boric Acid | 010043-35-3 | 20 | 0.00761 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 90 | 0.03423 | 0 | ||||
FERROTROL 300L | BAKER HUGHES | Iron Control Agent | Citric Acid | 000077-92-9 | 50 | 0.00337 | 0 | |
100 Mesh Sand | BAKER HUGHES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 4.47078 | 0 | |
ENZYME G-NE | BAKER HUGHES | Breaker | No Hazardous Components | NA | 0 | 0 | 0 | |
SCALETROL 720 | BAKER HUGHES | Scale Inhibitor | Ethylene Glycol | 000107-21-1 | 35 | 0.00476 | 0 | |
Diethylene Glycol | 000111-46-6 | 5 | 0.00068 | 0 | ||||
GW-3LDF | BAKER HUGHES | Gelling Agent | Polysaccharide Blend | NA | 60 | 0.11546 | 0 | |
Petroleum Distillate Blend | NA | 60 | 0.11546 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-08-02 | H2O | 15 | 5307 Bbl | 330340 | BAKER-HUGHES | STAGE 1/21
30 SHOTS |
2020-08-07 | H2O | 15 | 2229 Bbl | 333860 | BAKER-HUGHES | STAGE 21/21
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 542257 | 1176 | 102 |
2015 | CHESAPEAKE EXPLORATION LLC | 1376908 | 462 | 267 |
2016 | CHESAPEAKE EXPLORATION LLC | 1065750 | 2 | 346 |
2017 | CHESAPEAKE EXPLORATION LLC | 647959 | 10 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 455355 | 44 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | 92887 | 9 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 9377 | 102 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 3589 | 267 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2437 | 346 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1880 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1439 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 249 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0813430143 | 2013-12-30 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Nomac Drilling Rig 74 has drilled a 17.5 inch hole to a total depth of 598 feet and ran 588 feet of 13 3/8 inch casing (54.5 pound per foot casing and inside diameter of 12.615 inches). They installed 6 bowspring centralizers on joints 1,2,5,8,11, and 14. Schlumberger cemented the casing with 526 sacks of Class A (D901) 2% D154, 0.5% B248, 0.2% B160A, 0.2% D046, 1% S001, and .125 pound per sack D130. The cement had a density of 15.6 pounds per gallon, a yield of 1.21 cubic feet per sack, and they used 5.234 gallons of mix water per sack. They pumped 113 barrels of cement slurry, 84 barrels of displacement, and there was 25 barrels of cement returns. They landed the plug at 5:53am with 272 PSI; bumped pressure up to 817 PSI and conducted the casing test. The floats held and there was 1/2 barrel flowback when the pressure was released. The casing test was approved. My inspection revealed no violations at this time. NOTE: Had to wait on the Sweco wellhead hand to arrive on location so they could land the casing in the wellhead. He arrived on site at approximately 02:30am. |
0920522754 | 2013-12-31 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of Nomac Drilling Rig # 74. My inspection revealed that Nomac Drilling Rig # 74 is drilling the 12 1/4 inch intermediate hole at 1262 feet. My inspection also revealed no violations at this time. |
0934222177 | 2015-12-30 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
1388397696 | 2013-12-16 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Precision drilling has set 30 inch casing to a depth of 20 feet. They drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch casing (94 pound per foot/ inside diameter of 19.124 inches). Allied cemented the casing with 309 sacks of Class A 2% CaCl and 1/2 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. They pumped 65 barrels of cement slurry, 39 barrels of displacement, and there was 8 barrels of cement returns to surface. My inspection revealed no violations at this time. |
For data sources see[10]