If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-067-21539 | | Well ID: 34-067-21539 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.2, -81.12 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: SHERWOOD E MRF HR | | Farm/Lease Name: SHERWOOD E MRF HR | ||
|- | |- | ||
− | | License Status: | + | | License Status: Producing |
|- | |- | ||
| License Date: 2018-05-10 | | License Date: 2018-05-10 | ||
Line 29: | Line 29: | ||
| Final Drill Date: 2018-10-08 | | Final Drill Date: 2018-10-08 | ||
|- | |- | ||
− | | Well Total Depth: 23005 ft | + | | Well Total Depth: 23005.00 ft |
|- | |- | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.200000 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.120000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 77: | Line 77: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
− | + | == Perforation Treatments == | |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" style="text-align: center"| Perforation Date | !scope="col" style="text-align: center"| Perforation Date | ||
Line 87: | Line 87: | ||
!scope="col" style="text-align: center"| Number of Shots | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | |}--> | + | | |
+ | | style="text-align: right;" | 22789 | ||
+ | | style="text-align: right;" | 22843 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 8976 | ||
+ | | style="text-align: right;" | 9106 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 8976 | ||
+ | | style="text-align: right;" | 9106 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 142: | Line 163: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Production Data == | <!--== Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 171: | Line 192: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1478807363 | ||
+ | | 2020-9-29 0:00: | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | 0.50 | ||
+ | |- | ||
+ | | -1773832672 | ||
+ | | 2019-1-3 0:00:0 | ||
+ | | CT | ||
+ | | No Violations | ||
+ | | 1.00 | ||
|- | |- | ||
| 0399572539 | | 0399572539 | ||
Line 219: | Line 252: | ||
| No Violations | | No Violations | ||
| On the day of my inspection Universal is on location preparing to frac stage 5/92 on this well. Plug set at 22306, with bootom perf at 22297 and top perf at 22176. Surface and intermediate annular pressure are 0. | | On the day of my inspection Universal is on location preparing to frac stage 5/92 on this well. Plug set at 22306, with bootom perf at 22297 and top perf at 22176. Surface and intermediate annular pressure are 0. | ||
+ | |- | ||
+ | | 1919440333 | ||
+ | | 2019-10-30 0:00 | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | 1.00 | ||
+ | |- | ||
+ | | 399572539 | ||
+ | | 2017-7-13 0:00: | ||
+ | | CS | ||
+ | | No Violations | ||
+ | | 4.50 | ||
+ | |- | ||
+ | | 511487942 | ||
+ | | 2018-9-19 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | 1.00 | ||
+ | |- | ||
+ | | 514911680 | ||
+ | | 2019-3-28 0:00: | ||
+ | | WR | ||
+ | | No Violations | ||
+ | | 1.00 | ||
|- | |- | ||
|} | |} | ||
Line 233: | Line 290: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-067-21539 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Moorefield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001497 | |
Farm/Lease Name: SHERWOOD E MRF HR | |
License Status: Producing | |
License Date: 2018-05-10 | |
Spud Date: 2017-07-06 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-10-08 | |
Well Total Depth: 23005.00 ft | |
Configuration: Horizontal | |
Latitude: 40.200000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-05-09 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/9/2017, Expired Date:5/9/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-05-10 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/10/2018, Expired Date:5/9/2020 12:00:00 PM, Drilling unit acres:590.104, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-10-08 | |
Record Last Modified | 2019-04-24 | |
Correction to Well | 2019-04-26 | UPDATE TARGET/TAKE AS-DRILLED PLAT |
Construction Permit Expires | 2020-05-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22789 | 22843 | 0 | |
8976 | 9106 | 0 | |
8976 | 9106 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-01-09 | H2O | 0 | 6717 Bbl | 216621 | Universal Well Services Inc. | n the day of my inspection I witnessed Universal frac crew on location. They are not stimulating any wells at this time due to equipment issues. Stage 17 was the last well fracked on this well and pad. It was done yesterday. Stage 17 plug is at 20506, with top perf at 20376 and bottom perf at 20496. 3032 gallons of 7.5 hcl, 6717 clean barrels, 60322lbs of 100 mesh, and 156299 lbs of 40/70 mesh sand pumped. Max rate was 85.3 barrels per minute (BPM), max pressure was 11535, average rate was 70.5, |
2019-01-23 | H2O | 0 | 6504 Bbl | 250189 | Universal Well Services Inc. | On the day of my inspection I witnessed a Universal frac crew on location tied into the 1h, 3h, and 9h wells. They just finished stimulating stage 34/93 on this well. Plug was set at 17956, with bottom perfs at 17947 and top perfs at 17826. They pumped 3000 gallons of 7.5% HCl, 6504 barrels of cleam fluid, and 250189 lbs of sand. Sand was 60510 lbs of 100 mesh and 189679 lbs of 40/70 mesh. Max treating pressure was 11544 with an average presure of 10664. Max rate was 86.8 barrels per minute (BPM |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1478807363 | 2020-9-29 0:00: | PW | No Violations | 0.50 |
-1773832672 | 2019-1-3 0:00:0 | CT | No Violations | 1.00 |
0399572539 | 2017-07-13 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precison had augured a 36 inch diameter hole to 150 feet. 150 feet of 30 inch diameter conductor casing was run. C&J Energy Services was onsite with 585 sacks of class A cement. Additives include 1.5% CaCl and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 100% percent excess ran. Mix water tested 70 degrees Fahrenheit, pH of 7 and <31 ppm chlorides. Cement was displaced with 100 barrels of fresh water leaving 30 feet in the casing. 30 barrels of cement returned to surface. Earlier in the week this hole was augered with a 42 inch diameter bit to a depth of 25 feet and grouted back to surface and then reaugered with a 36 inch diameter auger. Signifcant ground water was encountered which required this action. |
0511487942 | 2018-09-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 skidding the rig over this well. Identified myself to Company Man Will Broussard. Top hole already set, Will plans to spud 12.25 inch diameter hole tonight. |
0514911680 | 2019-03-28 | Work Over Reconditioning | No Violations | On the day of my inspection I witnessed CWS 7009 a stand alone snubbing unit on this well. They are onsite retrieving 8747 feet of 2.875 inch diameter tubing from the well. Company man said there was a leak on a valve and that the tubing was intentionally cut so the well could be shut in. Pad is not yet in production and production equipment was being installed during my inspection. |
1035850812 | 2019-01-23 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location tied into the 1h, 3h, and 9h wells. They just finished stimulating stage 34/93 on this well. Plug was set at 17956, with bottom perfs at 17947 and top perfs at 17826. They pumped 3000 gallons of 7.5% HCl, 6504 barrels of cleam fluid, and 250189 lbs of sand. Sand was 60510 lbs of 100 mesh and 189679 lbs of 40/70 mesh. Max treating pressure was 11544 with an average presure of 10664. Max rate was 86.8 barrels per minute (BPM). Average rate was 69.2 BPM. Initial shut in pressure (ISIP) was 5285 and 5 minute ISIP was 5000. frac gradiant was 1.073. Break down pressure was 8577. Surface annular pressure was 0 and intermediate was 150. |
1443476381 | 2018-10-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed patterson 284 drilling an 8.5 inch diameter hole at a depth of 17160 feet. I identified myself to company man Mark Smith. Casing trucks are on location this date. Estimated total depth is around 23000 feet and Mark believes they will reached that depth on Wednesday. |
1458363487 | 2019-01-10 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. They are not stimulating any wells at this time due to equipment issues. Stage 17 was the last well fracked on this well and pad. It was done yesterday. Stage 17 plug is at 20506, with top perf at 20376 and bottom perf at 20496. 3032 gallons of 7.5 hcl, 6717 clean barrels, 60322lbs of 100 mesh, and 156299 lbs of 40/70 mesh sand pumped. Max rate was 85.3 barrels per minute (BPM), max pressure was 11535, average rate was 70.5, and average pressure was 9244. Break down pressure was 6812. Initial shut in pressure (ISIP) was 5041 and 5 minute ISIP was 4587. Frac gradient of 1.044. Wireline has perfed stage 18. Plug is set at 20356, with top perf at 20227 and bottom perf at 20347. Surface annular pressure is 0 and intermediate annular pressure is 600. |
1531788556 | 2018-07-16 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the rig run the majority of their casing and the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1455 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 150 feet. Wyoming Casing ran 1450 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Casing was centralized with 12 centralizers. Shoe track is 46 feet long. CJ/Otex was onsite with 1585 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.21. 50% excess ran in open hole. Cement displaced with 213.5 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 25 barrels of cement returned to surface, and floats held with 1 barrels back. |
1773832672 | 2019-01-03 | Completion Testing | No Violations | On the day of my inspection Universal is on location preparing to frac stage 5/92 on this well. Plug set at 22306, with bootom perf at 22297 and top perf at 22176. Surface and intermediate annular pressure are 0. |
1919440333 | 2019-10-30 0:00 | PL | No Violations | 1.00 |
399572539 | 2017-7-13 0:00: | CS | No Violations | 4.50 |
511487942 | 2018-9-19 0:00: | DD | No Violations | 1.00 |
514911680 | 2019-3-28 0:00: | WR | No Violations | 1.00 |
For data sources see[5]