If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Geauga_County,_Ohio|Geauga]] | | County: [[Geauga_County,_Ohio|Geauga]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Troy_Township,_Geauga_County,_Ohio|Troy Township]] |
|- | |- | ||
| Operator Name: [[EXCALIBUR EXPLORATION INC]] | | Operator Name: [[EXCALIBUR EXPLORATION INC]] | ||
Line 33: | Line 33: | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: 41.376331579 |
|- | |- | ||
| Longitude: -81.10228349 | | Longitude: -81.10228349 |
Well ID: 34-055-22108 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.376331579,"lon":-81.10228349,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Troy Township | |
Operator Name: EXCALIBUR EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: GREENS AT MUMFORD | |
License Status: Producing | |
License Date: 2009-10-14 | |
Spud Date: 2009-11-02 | |
Spud Drilling Contractor: DIRECT DRILLING | |
Final Drill Date: 2009-11-20 | |
Well Total Depth: 4390 ft | |
Configuration: Vertical | |
Latitude: 41.376331579 | |
Longitude: -81.10228349 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-10-14 | Proposed Formations:NEWBURG-ORISKANY-CLINTON, Issued Date:10/14/2009, Expired Date:10/14/2010 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-11-20 | |
Completion Report Received | 2009-12-09 | |
Construction Permit Expires | 2010-10-14 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-02-18 | 4178 | 4276 | 49 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 79546 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | EXCALIBUR EXPLORATION INC | 0 | 0 | 0 |
2010 | EXCALIBUR EXPLORATION INC | 2661 | 1045 | 304 |
2011 | EXCALIBUR EXPLORATION INC | 4603 | 1090 | 365 |
2012 | EXCALIBUR EXPLORATION INC | 3128 | 618 | 366 |
2013 | EXCALIBUR EXPLORATION INC | 2027 | 379 | 365 |
2014 | EXCALIBUR EXPLORATION INC | 1517 | 334 | 365 |
2015 | EXCALIBUR EXPLORATION INC | 1009 | 291 | 365 |
2016 | EXCALIBUR EXPLORATION INC | 915 | 194 | 365 |
2017 | EXCALIBUR EXPLORATION INC | 779 | 276 | 365 |
2018 | EXCALIBUR EXPLORATION INC | 764 | 211 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | EXCALIBUR EXPLORATION INC | Brine | 296 | 0 |
2010 | EXCALIBUR EXPLORATION INC | Brine | 1291 | 304 |
2011 | EXCALIBUR EXPLORATION INC | Brine | 1223 | 365 |
2012 | EXCALIBUR EXPLORATION INC | Brine | 676 | 366 |
2013 | EXCALIBUR EXPLORATION INC | Brine | 333 | 365 |
2014 | EXCALIBUR EXPLORATION INC | Brine | 605 | 365 |
2015 | EXCALIBUR EXPLORATION INC | Brine | 266 | 365 |
2016 | EXCALIBUR EXPLORATION INC | Brine | 228 | 365 |
2017 | EXCALIBUR EXPLORATION INC | Brine | 248 | 365 |
2018 | EXCALIBUR EXPLORATION INC | Brine | 284 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0299531960 | 2009-11-05 | Drill / Deepen / Reopen | No Violations | On site for surface cement. Operator was tripping out of the hole and got hung in the Berea. Operator was having issues with the Berea swelling. At the start of tripping out once the bit was hung operator could go down but not up, Berea then locked up, operator could not go in either directions. Operator did have and could maintain circulation. Operator attempted to turn drill pipe with tongs. Attempting to free drill pipe with tongs resulted in a twisted drill pipe. Operator was going rethink strategy to free hung drill pipe. Will contact when ready to cement surface casing. |
0453817613 | 2009-11-09 | Drill / Deepen / Reopen | No Violations | Operator has backed out 8 joints of drill pipe from hole. Operator was setting up drill collars with a set of jars to go in and retrieve the last 3 joints of drill string and bit. Pits were in good repair. Driller inquired if he could use caustics down hole to make the Berea Sandstone heave to release bit. Request to use caustics was denied. |
0687547313 | 2017-06-01 | Production Wells | No Violations | During this inspection, the well was equipped with a gas fired motor on the pumpjack. Valves on the wellhead were open. The production records for this well were up to date. The tank battery consisted of one 210 BBL production tank, one 100 BBL brine tank and a mechanical separator. Valves on the separator were open and the chart dated 5/3/17 showed production. Tank valves were equipped with flat plugs. The tank battery was diked and had proper, legible signage. The lease access was stable. |
0907144000 | 2010-01-08 | Administrative Inspection | No Violations | Annulus pressure report submitted by company. Long string cemented 11/20/09. 11/21/09 to 11/30/09 no recordable pressure readings. Well frac 12/02/09. 12/03/09 to 12/07/09 no readings. 12/07/09 annulus left open. |
0908562975 | 2009-11-04 | Drill / Deepen / Reopen | No Violations | Pits are in good repair. Lease road is stable, rocked to site. Silt fence has been installed at the entrance to the site and around affected area. Drill depth 200. Operator is going to be shutting down to repair mud pump. Mud pump is leaking around site. Operator is drilling on fresh water mud. |
1203125869 | 2014-09-02 | Production Wells | No Violations | My inspection found the well to be equipped with a pump jack. The annulus valve was plumbed into a pop off valve. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1257861114 | 2009-11-10 | Drill / Deepen / Reopen | No Violations | On site for surface cement. Operator ran surface casing with no issues. Requested 100% extra cement to be ran during job. Operator hung drill string on 11/05/09, had to use jars to loosen and remove drill string. Drill string freed on 11/09/2009. Operator went back in and reamed hole. Petroset cement company on site for cement job. Operator broke circulation, while switching over to start cement, fluid in the conductor was bubbling. Surface hole was gassing a minor amount. Instructed cementer to mix cement heavy at the end of the job. Petroset ran cement, 10BBL return of good cement to surface. Cement was static. Cement head started to leak at the end of job. Driller had cleaned threads on both the cement head and the landing joint. Cement head stopped leaking about 5 minutes after job was complete. |
1632029093 | 2018-09-06 | Production Wells | No Violations | I conducted an inspection on this well. At the time of this inspection, the well was equipped with a pumping unit and in production. The tank battery consisted of one 210 BBL tank, one 100 BBL tank and a mechanical separator. Valves on the separator were open. The tank battery was diked and had legible signage. The lease access was stable. |
1694825345 | 2013-04-29 | Production Wells | No Violations | My inspection found the well to be equipped with a pump jack. The annulus valve was plumbed into a pop off valve. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1734575133 | 2010-07-12 | Preliminary Restoration | No Violations | Lease road is stable and rocked to the tank battery. Turn around located at the tank battery. Well is a pump jack well. Annulus has a pop-off and needle gauge on it. Tank battery has one 210BBL tank, 100 BBL tank and an mechanical separator. Dike is in good repair. PVC drain pipe has been installed south east corner of the dike. Pipe has a riser and a screw in cap on it. Vegetation is established on location. Site is stable. Spacing is meets 1509 ORC. |
For data sources see[9]