If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 15: | Line 15: | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
|- | |- | ||
− | | Well Pad ID: [[001274]] | + | | Well Pad ID: [[US-OH-001274]] |
|- | |- | ||
| Farm/Lease Name: HOLLIDAY A | | Farm/Lease Name: HOLLIDAY A | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2015-08-10 |
|- | |- | ||
| Spud Date: 2015-08-14 | | Spud Date: 2015-08-14 |
Well ID: 34-111-24591 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.775910499,"lon":-80.92555092,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001274 | |
Farm/Lease Name: HOLLIDAY A | |
License Status: Producing | |
License Date: 2015-08-10 | |
Spud Date: 2015-08-14 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2015-09-28 | |
Well Total Depth: 20789 ft | |
Configuration: Horizontal | |
Latitude: 39.775910499 | |
Longitude: -80.92555092 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-07-01 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:7/1/2015, Expired Date:6/30/2017 12:00:00 PM, Drilling unit acres:411.102, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2015-08-10 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/10/2015, Expired Date:8/9/2017 12:00:00 PM, Drilling unit acres:452.632, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-09-28 | |
Correction to Well | 2016-10-28 | CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 9/23/2016-ALE |
Completion Report Received | 2017-02-28 | |
Construction Permit Expires | 2017-08-09 | |
Record Last Modified | 2018-02-22 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-01 | 10417 | 20582 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/07/2016 | 11/13/2016 | 10416 | 22,171,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
Ethylene oxide | 75-21-8 | 0.01 | 0.00000047 | 1 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.000851218 | 1828 | ||||
Glycerine | 56-81-5 | 5 | 0.00002049 | 44 | ||||
Olefins | Proprietary | 5 | 0.00004284 | 92 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000122467 | 263 | ||||
Methanol | 67-56-1 | 60 | 0.000211408 | 454 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00002049 | 44 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.068823 | 147798 | ||||
Acetic acid | 64-19-7 | 60 | 0.00051129 | 1098 | ||||
Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide | 68527-49-1 | 30 | 0.000105704 | 227 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 13.4362 | 28,854,300.0 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003539 | 76 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000105704 | 227 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000105704 | 227 | ||||
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.459229 | 986198 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.1034 | 184,908,000.0 | |
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID - 15% | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-11-13 | H2O | 15 | 393228 Gal | 583863 | Halliburton | STAGE 50/50
36 SHOTS |
2016-10-11 | H2O | 15 | 131180 Gal | 22980 | Halliburton | STAGE 1/50
36 SHOTS STAGES2-49 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 533038 | 0 | 30 |
2017 | ECLIPSE RESOURCES I LP | 5964712 | 0 | 364 |
2018 | ECLIPSE RESOURCES I LP | 1802785 | 0 | 362 |
2019 | ECLIPSE RESOURCES I LP | 318144 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 23464 | 30 |
2017 | ECLIPSE RESOURCES I LP | Brine | 79398 | 364 |
2018 | ECLIPSE RESOURCES I LP | Brine | 23330 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 4161 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0210020812 | 2017-01-05 | Production Wells | No Violations | On the day of inspection accompanied by ODNR Senior Health Physicist Paul Carder, I witnessed the well was online with the valves in the open position. Gauges present read 6995 pounds per square inches on the casing and 6100 pounds per square inches on the tubing with annular monitoring in place. Production equipment included a sand trap, a line heater and a 2- stage vertical separator. Also present included 4-400 barrel tanks within containment, 2 filter separators, 2 vertical scrubbers, 2 heater treaters and a gas combustor all shared with 34111246100000 Pittman 3H, 34111245920000 Holliday A 1H, 34111245960000 Holliday B 7H and 34111246090000 Circosta 1H. We met with Eclipse EHS Technician Ken Durst and completed walk around revealing containment was being removed. I instructed Mr. Durst to fill the mouse holes in accordance with OAC 1501:9-11-11 and to continue to pull fluids out of the sump until the levels are acceptable. |
0531703336 | 2016-11-29 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Service Stand Alone Snubbing Unit # 9 was tripping into the wellbore to drill out the kill plug set at 10048 feet with a 4.5 inch diameter tricone bit. Tetra Services was onsite controlling well pressure along with flowback of fluids. |
0674127184 | 2016-11-22 | Administrative Inspection | No Violations | I received a call from Eclipse EHS Supervisor Bruce Carpenter at 0940 stating that a truck hauling tubing to location Kender Hauling had drove from Clarington Ohio with a fuel leak following the RUMA route. The truck pulled onto the access road releasing less than 5 gallons of diesel fuel before containment was placed under the fuel tank. The truck was repaired and HTP was placed on the access road where he leak occurred and removed with a skid steer for disposal. |
0710163253 | 2015-09-23 | Drill / Deepen / Reopen | No Violations | I am accompanied today by Inspector Sefcik, our inspection finds the drilling rig, H&P 531, is drilling an 8.5 borehole at a depth of 14,815. |
0952932263 | 2016-12-21 | Completion Testing | No Violations | On the day of my inspection I witnessed the well was flowing back with through Tetra Services flowback equipment to sales with 6400 pounds per square inches on the casing at 19.7 MMCF per day and 26 barrels per hour through a 25/64 inch choke. I met with Consultant Cristo Giannareas and completed walk around. |
1439734416 | 2015-08-16 | Casing String Witnessed | No Violations | The said well was spudded on 08/14/2015 by Precision Rat Hole with a 30 x 120 conductor borehole being drilled and 120 of 24 .375 wall 94.62# pound per foot weld connection casing being ran. Universal Well Service is the cement contractor on location to cement the casing using 320 sacks of class A-3% calcium .25 pound per sack loss circulation material with the pipe capacity being displaced with 53 barrels of fresh water and 10 barrels of 6% gel prior to cementing and good cement returns witnessed to surface. |
1442119122 | 2015-09-13 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing installation and cement job found the following -H&P rig # 531 is now on the hole and has drilled a 1,800 x 17.5 surface borehole and ran 1,743 of 13.375 54.5# casing with a casing guide shoe and float collar ran and proper centralizer placement demonstrated. Schlumberger Cement Service is on location to cement the casing using 1455 sacks of class A- 25% calculated open hole excess cement with 20 barrels of 6% gel spacer ran ahead of the cement and circulation established to surface prior to cementing. The casing was pressure tested to 500 psi over lift pressure and good cement returns were witnessed to surface. |
1443123609 | 2015-09-22 | Drill / Deepen / Reopen | No Violations | On my inspection today I was accompanied by Inspector Conrad. Our inspection finds the drilling rig, H&P 531, is drilling an 8.5 borehole at a depth of 14,815. |
1443461756 | 2015-09-28 | Casing String Witnessed | No Violations | On site inspection to witness the 5.5 production casing cement job. The said well was drilled to a total measured depth of 20,789 on 09/25/2015 by H&P Drilling rig 531 with 20,777 of 23# lb/ft 5.5 casing ran with a float collar and guide shoe casing equipment ran along with proper centralizer placement demonstrated, also noted was a total of (4) Nine energy flow guns ran between the depths of 20,731 and 20,473. Schlumberger Cement Service was on location to cement the casing using a 1870 sack lead 50/50 poz class A 14.2# ppg cement mix and 2,450 sack 50/50 poz class A 14.8# ppg tail cement mix with 50 barrels of 13.8# ppg Mud push sweep ran ahead of the cement. There was 3,900 psi during displacement @ 3.9 barrels per minute with good circulation to surface and spacer returns at 400 barrels into displacement with a calculated total of 439 to bump the plug, the company over displaced to 449 total barrels with no plug seating encountered at 5,900 psi total encounter pressure with a 6,500 maximum allowed pressure due to the Nine Energy Flow guns. The pre job design calculated top of cement was 1,000 measured depth. No further evaluation is to be required due to adequate lift pressure and fluid returns through out the cement job. |
1915608210 | 2017-03-28 | Production Wells | No Violations | On the day of inspection I witnessed the well was online with the valves in the open position. Gauges present read 5280 pounds per square inches on the casing and 4225 pounds per square inches on the tubing with annular monitoring in place. Production equipment included a sand trap, a line heater and a 2- stage vertical separator. Also present included 4-400 barrel tanks within containment, 2 filter separators, 2 vertical scrubbers, 2 heater treaters and a gas combustor all shared with 34111246100000 Pittman 3H, 34111245920000 Holliday A 1H, 34111245960000 Holliday B 7H and 34111246090000 Circosta 1H. |
2010374267 | 2018-05-22 | Production Wells | No Violations | Status check inspection found the well drilling and completion process now complete and the well producing through 2.875 production tubing with 2 manual and 2 emergency shut down in line valves present in the production flowline. Proper well identification is posted. Annular pressure monitoring is in place on the 13.375 and 9.625 well head sections with 2,300 psi on the 9.625 and 0 psi on the 13.375 well head sections. Production related equipment on site consists of 5 gas processing in line heaters and 5 sand trap separators along with a single glycol heater. The production fluid facility consists of 4 steel construction tanks of 400 barrel capacity situated inside a polymer lined steel containment area. |
2046048720 | 2017-03-21 | Preliminary Restoration | No Violations | Preliminary Restoration found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and stoned. The location entry point is posted with the owners contact information. The location is fenced with chain link fence. There is a total of 6 wells on the pad 5 of which are complete and all 6 have identification posted. The said well has a casing and tubing well head in place and is equipped with tubing head valves and B section cross valves. There is a Hydraulic operated electrically controlled emergency valve on the tubing head output flow line that has shut down points at the well head and production facility along with at the well pad entry point. Also on location downstream from the well head is a sand trap and line heater and then a mechanical separator. The mechanical separator sends the processed fluid to the production facility that consists of 4 steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment area. There is also 2 dehydration units on location that service the 6 total line heaters on the pad. |
2080130833 | 2016-11-23 | Completion Testing | No Violations | On the day of my inspection the remediation of the diesel fuel from the Kender Hauling truck from 11/22/16 was satisfactory. Deep Well Service Stand Alone Snubbing Unit # 9 was drilling out frac plug # 7at 11600 feet with a 4.5 inch diameter tricone bit. Tetra Services was onsite controlling well pressure at 3800 pounds square inch along with flowback of fluids. |
2144778108 | 2016-12-13 | Completion Testing | No Violations | On the day of my inspection I witnessed flowback operations began this morning through Tetra Services flowback equipment. I met with Consultant Cristo Giannareas and completed walk around revealing the well was flowing back with 6500 pounds per square inches on the casing at 18.7 MMCF and 40 barrels per hour through a 24/64 inch choke. |
For data sources see[10]